← 2026-04-12

Monday, April 13, 2026

2026-04-14 →
2,946MWh Curtailed
3,089MWh Ramped Up
€0.75MEst. Cost
210 MWPeak Positive

Day-Ahead Spot: 53-180 €/MWh (avg 114)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 36 59,446
50Hertz negative 51 56,505
TenneT DE positive 17 12,129
TransnetBW positive 9 11,244
TenneT DE negative 5 6,096
Amprion negative 8 3,331
TransnetBW negative 4 859

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 651 9,117 08:April-22:April
Knapsack 1 Amprion Konventionell positive 504 9,079 04:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 606 8,482 08:April-22:April
Börse TenneT DE Sonstiges positive 705 5,642 14:April-22:April
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 357 5,272 07:April-22:April
HERDECKE_H6 Amprion Konventionell positive 294 5,148 04:April-22:April
NIEHL-II Amprion Konventionell positive 246 4,916 02:April-22:April
Emsland Block C Amprion Konventionell positive 295 4,724 06:April-22:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 281 4,359 04:April-22:April
Rostock Kohlekraftwerk 50Hertz Konventionell negative 212 4,238 02:April-22:April
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 347 4,164 06:April-18:April
Emsland Block B Amprion Konventionell positive 252 4,153 05:April-22:April
GERSTEINW_G (KapRes) Amprion Konventionell positive 206 3,806 03:April-22:April
Irsching 4 TenneT DE Konventionell negative 229 3,660 06:April-22:April
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 308 3,468 03:April-15:April
Jänschwalde (Standort) 50Hertz Konventionell negative 193 2,698 07:April-22:April
50H OWP Arkona 50Hertz Erneuerbar negative 254 2,666 06:April-21:April
KMW_KW3 Amprion Konventionell positive 381 2,666 08:April-15:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 132 2,506 02:April-22:April
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 166 2,455 04:April-22:April
Knapsack 1 Amprion Konventionell positive 414 2,276 09:April-14:April
50H OWP Wikinger 50Hertz Erneuerbar negative 189 2,170 06:April-21:April
HAMMUENTROP_20 Amprion Konventionell positive 255 2,102 07:April-16:April
GERSTEINW_F (KapRes) Amprion Konventionell positive 127 1,876 03:April-18:April
Lippendorf 50Hertz Konventionell negative 203 1,827 09:April-22:April
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 369 1,752 15:April-20:April
Irsching 5 TenneT DE Konventionell negative 97 1,752 04:April-22:April
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 225 1,688 07:April-15:April
ReserveKW Staudinger 5 TenneT DE Konventionell positive 210 1,684 07:April-15:April
Jänschwalde (Standort) 50Hertz Konventionell negative 124 1,617 09:April-22:April
Netzreservekraftwerk KMW 2 DT Amprion Konventionell positive 138 1,592 10:April-22:April
Knapsack 1 Amprion Konventionell positive 473 1,538 22:April-10:April
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 284 1,420 12:April-17:April
Schkopau 50Hertz Konventionell negative 98 1,180 07:April-22:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 190 1,138 05:April-16:April
50H PV Witznitz 50Hertz Erneuerbar negative 134 1,070 06:April-16:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 88 1,052 22:April-12:April
Linden GKL GT 1 TenneT DE Konventionell positive 63 996 06:April-22:April
Lippendorf 50Hertz Konventionell negative 124 990 08:April-16:April
GUD_HERNE_6 Amprion Konventionell positive 197 986 10:April-15:April
Niederrad 1 TenneT DE Konventionell positive 40 969 22:April-22:April
50H OWP Baltic 1+2 50Hertz Erneuerbar negative 190 952 11:April-16:April
WALSUM_10 Amprion Konventionell negative 271 950 08:April-11:April
illwerke vkw AG TransnetBW Sonstiges positive 150 900 09:April-15:April
Schkopau 50Hertz Konventionell negative 95 856 13:April-22:April
WEISWEILER_G Amprion Konventionell negative 127 855 08:April-18:April
Frankfurt West 4 TenneT DE Konventionell positive 60 840 06:April-20:April
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 171 771 15:April-19:April
illwerke vkw AG TransnetBW Sonstiges positive 82 757 04:April-18:April
50H UW Bertikow 50Hertz Erneuerbar negative 142 744 11:April-21:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-13?

On 2026-04-13, estimated redispatch costs were approximately €0.75 million. This includes €0.29M for renewable curtailment compensation and €0.44M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-13?

The most affected plant was Schwarze Pumpe (Standort) (50Hertz) with 9,117 MWh of negative redispatch.

What was the electricity spot price on 2026-04-13?

The EPEX Day-Ahead spot price for DE_LU ranged from 53 to 180 €/MWh with an average of 114 €/MWh.