2,121MWh Curtailed
1,713MWh Ramped Up
€0.48MEst. Cost
157 MWPeak Positive

Day-Ahead Spot: 9-175 €/MWh (avg 84)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 2 2,569
TransnetBW positive 1 1,638
TenneT DE positive 1 1,092
TenneT DE negative 3 630
Amprion negative 2 244

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Knapsack 1 Amprion Konventionell positive 534 2,539 15:April-20:April
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 89 1,638 23:April-18:April
Niederrad 1 TenneT DE Konventionell positive 46 1,092 22:April-22:April
UW Büttel TenneT DE Erneuerbar negative 30 270 07:April-16:April
Börse Amprion Konventionell negative 175 219 15:April-20:April
Irsching 4 TenneT DE Konventionell negative 30 180 16:April-22:April
Irsching 4 TenneT DE Konventionell negative 30 180 22:April-04:April
Börse Amprion Konventionell positive 60 30 16:April-16:April
KMW_KW3 Amprion Konventionell negative 17 25 23:April-01:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.14M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-12?

On 2026-04-12, estimated redispatch costs were approximately €0.48 million. This includes €0.21M for renewable curtailment compensation and €0.2M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-12?

The most affected plant was Knapsack 1 (Amprion) with 2,539 MWh of positive redispatch.

What was the electricity spot price on 2026-04-12?

The EPEX Day-Ahead spot price for DE_LU ranged from 9 to 175 €/MWh with an average of 84 €/MWh.