UW Garrel-Ost alpha

ErneuerbarTenneT DE

104Total MWh
2Measures
86 MWAvg Power
2Curtailments
0Ramp-ups

Data: 2026-03-25 to 2026-04-10

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-04-10 1 54
2026-03-25 1 50

Recent Measures

DateTSODirAvg MWMWhTime
2026-04-10 TenneT DE negative 73 54 09:April-10:April
2026-03-25 TenneT DE negative 100 50 09:March-10:March

Frequently Asked Questions

What is the redispatch history of UW Garrel-Ost alpha?

UW Garrel-Ost alpha is a Erneuerbar power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 104 MWh since 2026-03-25.

Why is UW Garrel-Ost alpha frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.