← 2026-09-14

Tuesday, September 15, 2026

2026-09-16 →
4,190MWh Curtailed
4,275MWh Ramped Up
€1.33MEst. Cost
282 MWPeak Positive

Day-Ahead Spot: 26-312 €/MWh (avg 178)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 27 31,765
TransnetBW positive 20 20,620
TenneT DE positive 6 10,800
Amprion positive 18 10,731
50Hertz negative 23 10,611
TransnetBW negative 2 3,038
Amprion negative 4 1,621
50Hertz positive 1 320

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Dörpen-West TenneT DE Erneuerbar negative 635 9,524 04:September-19:September
Börse TenneT DE Sonstiges positive 703 3,866 04:September-16:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 377 3,766 06:September-16:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 242 3,386 00:September-14:September
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 376 3,384 01:September-10:September
UW Diele TenneT DE Erneuerbar negative 291 2,914 05:September-17:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 120 2,880 22:September-22:September
Börse TransnetBW Sonstiges negative 120 2,880 22:September-22:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 407 2,852 15:September-22:September
ReserveKW Staudinger 4 TenneT DE Konventionell positive 346 2,595 22:September-22:September
Irsching 4 TenneT DE Konventionell positive 312 2,342 07:September-15:September
NIEHL-II Amprion Konventionell positive 206 2,162 23:September-09:September
UW Dörpen-West TenneT DE Erneuerbar negative 394 1,969 00:September-05:September
Börse TenneT DE Sonstiges negative 290 1,957 22:September-22:September
UW Emden-Ost TenneT DE Erneuerbar negative 259 1,751 09:September-16:September
illwerke vkw AG TransnetBW Sonstiges positive 134 1,612 05:September-22:September
ReserveKW Staudinger 4 TenneT DE Konventionell positive 259 1,555 16:September-22:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 508 1,524 06:September-09:September
Datteln_4 Amprion Konventionell positive 333 1,500 09:September-14:September
Irsching 4 TenneT DE Konventionell negative 172 1,460 23:September-07:September
WEISWEILER_G Amprion Konventionell positive 190 1,332 08:September-15:September
UW Diele TenneT DE Erneuerbar negative 323 1,049 12:September-16:September
WEISWEILERVGT_H3 Amprion Konventionell positive 163 976 06:September-19:September
50H_MNS_CR_PUL 50Hertz Erneuerbar negative 229 972 10:September-14:September
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 148 962 02:September-09:September
Lippendorf 50Hertz Konventionell negative 236 944 05:September-09:September
KMW_KW3 Amprion Konventionell positive 309 928 06:September-09:September
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 900 09:September-14:September
Lippendorf 50Hertz Konventionell negative 171 855 04:September-15:September
WEISWEILER_H Amprion Konventionell positive 116 844 08:September-15:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 91 822 02:September-17:September
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 188 800 10:September-14:September
UW Dörpen-West TenneT DE Erneuerbar negative 354 796 08:September-16:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 246 739 05:September-08:September
Rostock Kohlekraftwerk 50Hertz Konventionell negative 123 738 06:September-15:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 154 730 22:September-16:September
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 70 695 05:September-22:September
Boxberg (Standort) 50Hertz Konventionell negative 159 637 05:September-09:September
Boxberg (Standort) 50Hertz Konventionell negative 316 631 06:September-08:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 79 630 09:September-22:September
AVA Cluster Voslapp TenneT DE Erneuerbar negative 192 625 12:September-15:September
WALSUM_10 Amprion Konventionell positive 124 620 10:September-15:September
WALSUM_10 Amprion Konventionell negative 270 607 07:September-09:September
illwerke vkw AG TransnetBW Sonstiges positive 197 592 01:September-09:September
UW Emden-Ost TenneT DE Erneuerbar negative 92 576 07:September-14:September
Jänschwalde (Standort) 50Hertz Konventionell negative 288 576 07:September-09:September
AVA Cluster Dipperz TenneT DE Erneuerbar negative 111 556 10:September-15:September
illwerke vkw AG TransnetBW Sonstiges positive 202 555 09:September-16:September
AVA Cluster Twistetal TenneT DE Erneuerbar negative 96 530 09:September-15:September
Irsching 4 TenneT DE Konventionell negative 176 528 19:September-22:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.4M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-15?

On 2026-09-15, estimated redispatch costs were approximately €1.33 million. This includes €0.42M for renewable curtailment compensation and €0.89M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-15?

The most affected plant was UW Dörpen-West (TenneT DE) with 9,524 MWh of negative redispatch.

What was the electricity spot price on 2026-09-15?

The EPEX Day-Ahead spot price for DE_LU ranged from 26 to 312 €/MWh with an average of 178 €/MWh.