4,190MWh Curtailed
4,275MWh Ramped Up
€1.33MEst. Cost
282 MWPeak Positive
Day-Ahead Spot: 26-312 €/MWh (avg 178)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 27 | 31,765 |
| TransnetBW | positive | 20 | 20,620 |
| TenneT DE | positive | 6 | 10,800 |
| Amprion | positive | 18 | 10,731 |
| 50Hertz | negative | 23 | 10,611 |
| TransnetBW | negative | 2 | 3,038 |
| Amprion | negative | 4 | 1,621 |
| 50Hertz | positive | 1 | 320 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Dörpen-West | TenneT DE | negative | 635 | 9,524 | 04:September-19:September | |
| Börse | TenneT DE | Sonstiges | positive | 703 | 3,866 | 04:September-16:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 377 | 3,766 | 06:September-16:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 242 | 3,386 | 00:September-14:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 376 | 3,384 | 01:September-10:September |
| UW Diele | TenneT DE | negative | 291 | 2,914 | 05:September-17:September | |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 120 | 2,880 | 22:September-22:September |
| Börse | TransnetBW | Sonstiges | negative | 120 | 2,880 | 22:September-22:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 407 | 2,852 | 15:September-22:September |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 346 | 2,595 | 22:September-22:September |
| Irsching 4 | TenneT DE | Konventionell | positive | 312 | 2,342 | 07:September-15:September |
| NIEHL-II | Amprion | Konventionell | positive | 206 | 2,162 | 23:September-09:September |
| UW Dörpen-West | TenneT DE | negative | 394 | 1,969 | 00:September-05:September | |
| Börse | TenneT DE | Sonstiges | negative | 290 | 1,957 | 22:September-22:September |
| UW Emden-Ost | TenneT DE | negative | 259 | 1,751 | 09:September-16:September | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 134 | 1,612 | 05:September-22:September |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 259 | 1,555 | 16:September-22:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 508 | 1,524 | 06:September-09:September |
| Datteln_4 | Amprion | Konventionell | positive | 333 | 1,500 | 09:September-14:September |
| Irsching 4 | TenneT DE | Konventionell | negative | 172 | 1,460 | 23:September-07:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 190 | 1,332 | 08:September-15:September |
| UW Diele | TenneT DE | negative | 323 | 1,049 | 12:September-16:September | |
| WEISWEILERVGT_H3 | Amprion | Konventionell | positive | 163 | 976 | 06:September-19:September |
| 50H_MNS_CR_PUL | 50Hertz | negative | 229 | 972 | 10:September-14:September | |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 148 | 962 | 02:September-09:September |
| Lippendorf | 50Hertz | Konventionell | negative | 236 | 944 | 05:September-09:September |
| KMW_KW3 | Amprion | Konventionell | positive | 309 | 928 | 06:September-09:September |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 200 | 900 | 09:September-14:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 171 | 855 | 04:September-15:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 116 | 844 | 08:September-15:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 91 | 822 | 02:September-17:September |
| 50H_TEN_CR_M2_VIB | 50Hertz | negative | 188 | 800 | 10:September-14:September | |
| UW Dörpen-West | TenneT DE | negative | 354 | 796 | 08:September-16:September | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 246 | 739 | 05:September-08:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 123 | 738 | 06:September-15:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 154 | 730 | 22:September-16:September |
| Reservekraftwerk Marbach GT 3 | TransnetBW | Konventionell | positive | 70 | 695 | 05:September-22:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 159 | 637 | 05:September-09:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 316 | 631 | 06:September-08:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 79 | 630 | 09:September-22:September |
| AVA Cluster Voslapp | TenneT DE | negative | 192 | 625 | 12:September-15:September | |
| WALSUM_10 | Amprion | Konventionell | positive | 124 | 620 | 10:September-15:September |
| WALSUM_10 | Amprion | Konventionell | negative | 270 | 607 | 07:September-09:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 197 | 592 | 01:September-09:September |
| UW Emden-Ost | TenneT DE | negative | 92 | 576 | 07:September-14:September | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 288 | 576 | 07:September-09:September |
| AVA Cluster Dipperz | TenneT DE | negative | 111 | 556 | 10:September-15:September | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 202 | 555 | 09:September-16:September |
| AVA Cluster Twistetal | TenneT DE | negative | 96 | 530 | 09:September-15:September | |
| Irsching 4 | TenneT DE | Konventionell | negative | 176 | 528 | 19:September-22:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.4M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-15?
On 2026-09-15, estimated redispatch costs were approximately €1.33 million. This includes €0.42M for renewable curtailment compensation and €0.89M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-15?
The most affected plant was UW Dörpen-West (TenneT DE) with 9,524 MWh of negative redispatch.
What was the electricity spot price on 2026-09-15?
The EPEX Day-Ahead spot price for DE_LU ranged from 26 to 312 €/MWh with an average of 178 €/MWh.