3,969MWh Curtailed
4,385MWh Ramped Up
€1.35MEst. Cost
270 MWPeak Positive
Day-Ahead Spot: 90-269 €/MWh (avg 183)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 18 | 24,517 |
| TransnetBW | positive | 17 | 20,810 |
| TenneT DE | positive | 7 | 17,661 |
| Amprion | positive | 10 | 17,076 |
| 50Hertz | negative | 28 | 9,292 |
| TransnetBW | negative | 6 | 8,358 |
| Amprion | negative | 3 | 1,091 |
| 50Hertz | positive | 4 | 276 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 287 | 6,895 | 22:September-22:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 277 | 6,155 | 22:September-20:September |
| Börse | TransnetBW | Sonstiges | negative | 319 | 4,790 | 05:September-20:September |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 319 | 4,790 | 05:September-20:September |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 257 | 4,755 | 03:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 253 | 4,739 | 23:September-18:September |
| Börse | TenneT DE | Sonstiges | positive | 874 | 4,368 | 10:September-15:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 370 | 4,076 | 22:September-09:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 426 | 3,944 | 06:September-15:September |
| Börse | TenneT DE | Sonstiges | negative | 237 | 3,918 | 03:September-22:September |
| UW Büttel | TenneT DE | negative | 493 | 3,697 | 08:September-15:September | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 223 | 3,458 | 23:September-20:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 127 | 3,042 | 22:September-22:September |
| Börse | TransnetBW | Sonstiges | negative | 127 | 3,042 | 22:September-22:September |
| KMW_KW3 | Amprion | Konventionell | positive | 258 | 2,065 | 07:September-15:September |
| UW Büttel | TenneT DE | negative | 357 | 2,052 | 15:September-22:September | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 196 | 2,010 | 07:September-22:September |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 400 | 2,000 | 09:September-14:September | |
| WEISWEILER_G | Amprion | Konventionell | positive | 235 | 1,700 | 07:September-15:September |
| Lippendorf | 50Hertz | Konventionell | negative | 540 | 1,620 | 06:September-09:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 209 | 1,515 | 07:September-15:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 377 | 1,508 | 05:September-09:September |
| BAG NWAK-Cluster 01 Mechlenreuth | TenneT DE | negative | 300 | 1,500 | 09:September-14:September | |
| BAG NWAK-Cluster 02 Oberhaid-Redwitz | TenneT DE | negative | 300 | 1,500 | 09:September-14:September | |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 123 | 1,229 | 23:September-22:September |
| UW Büttel | TenneT DE | negative | 181 | 1,085 | 22:September-04:September | |
| Marbach GT 4 (bnBm) | TransnetBW | Konventionell | positive | 272 | 1,020 | 07:September-11:September |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 369 | 1,015 | 22:September-00:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 96 | 955 | 08:September-20:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 272 | 951 | 15:September-21:September |
| UW Dörpen-West | TenneT DE | negative | 174 | 915 | 09:September-15:September | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 123 | 770 | 07:September-14:September | |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 110 | 660 | 06:September-15:September |
| Irsching 4 | TenneT DE | Konventionell | negative | 121 | 606 | 22:September-03:September |
| KMW_KW3 | Amprion | Konventionell | positive | 95 | 596 | 08:September-14:September |
| 50H PV Witznitz | 50Hertz | negative | 81 | 568 | 08:September-15:September | |
| WALSUM_10 | Amprion | Konventionell | negative | 124 | 528 | 23:September-03:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 211 | 527 | 05:September-07:September |
| UW Diele | TenneT DE | negative | 158 | 475 | 14:September-17:September | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 182 | 455 | 14:September-16:September |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 87 | 433 | 16:September-21:September |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | negative | 102 | 408 | 22:September-02:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 250 | 375 | 07:September-09:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 183 | 366 | 06:September-08:September |
| WALSUM_10 | Amprion | Konventionell | negative | 80 | 338 | 08:September-15:September |
| UW Dörpen-West | TenneT DE | negative | 74 | 316 | 23:September-04:September | |
| AVA Cluster Dipperz | TenneT DE | negative | 63 | 314 | 09:September-14:September | |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 60 | 313 | 08:September-14:September | |
| Grosskraftwerk Mannheim Block 6 | TransnetBW | Konventionell | positive | 59 | 293 | 09:September-14:September |
| UW Emden-Ost | TenneT DE | negative | 65 | 276 | 10:September-15:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.41M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-16?
On 2026-09-16, estimated redispatch costs were approximately €1.35 million. This includes €0.4M for renewable curtailment compensation and €0.93M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-16?
The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 6,895 MWh of positive redispatch.
What was the electricity spot price on 2026-09-16?
The EPEX Day-Ahead spot price for DE_LU ranged from 90 to 269 €/MWh with an average of 183 €/MWh.