3,239MWh Curtailed
3,585MWh Ramped Up
€1.12MEst. Cost
243 MWPeak Positive
Day-Ahead Spot: 0-233 €/MWh (avg 139)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 30 | 77,444 |
| Amprion | positive | 32 | 58,793 |
| TenneT DE | positive | 6 | 44,230 |
| TransnetBW | positive | 21 | 19,638 |
| 50Hertz | negative | 9 | 5,432 |
| TransnetBW | negative | 2 | 1,978 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Dörpen-West | TenneT DE | negative | 1230 | 23,677 | 02:September-22:September | |
| Börse | TenneT DE | Sonstiges | positive | 1087 | 21,738 | 22:September-22:September |
| Börse | TenneT DE | Sonstiges | positive | 1049 | 12,852 | 04:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 345 | 8,279 | 22:September-22:September |
| UW Büttel | TenneT DE | negative | 608 | 7,899 | 09:September-22:September | |
| UW Dörpen-West | TenneT DE | negative | 1282 | 7,690 | 22:September-04:September | |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 287 | 6,895 | 22:September-22:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 260 | 5,790 | 23:September-22:September |
| HERDECKE_H6 | Amprion | Konventionell | positive | 235 | 5,644 | 22:September-22:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 500 | 5,630 | 22:September-09:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 421 | 5,470 | 09:September-22:September |
| UW Emden-Ost | TenneT DE | negative | 375 | 4,880 | 04:September-17:September | |
| HERDECKE_H6 | Amprion | Konventionell | positive | 259 | 4,850 | 03:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 247 | 4,759 | 02:September-22:September |
| Emsland Block D | Amprion | Konventionell | positive | 368 | 4,414 | 22:September-22:September |
| Emsland Block D | Amprion | Konventionell | positive | 323 | 4,360 | 02:September-16:September |
| UW Büttel | TenneT DE | negative | 633 | 3,800 | 22:September-04:September | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 262 | 3,671 | 08:September-22:September |
| UW Diele | TenneT DE | negative | 592 | 3,551 | 22:September-04:September | |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 278 | 3,542 | 05:September-18:September |
| UW Diele | TenneT DE | negative | 273 | 3,348 | 06:September-19:September | |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 220 | 2,745 | 06:September-22:September |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 301 | 2,562 | 13:September-22:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 258 | 2,321 | 22:September-21:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 208 | 2,283 | 03:September-14:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 176 | 1,938 | 01:September-17:September |
| Emsland Block D | Amprion | Konventionell | positive | 308 | 1,925 | 14:September-20:September |
| Irsching 5 | TenneT DE | Konventionell | positive | 267 | 1,802 | 14:September-20:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 297 | 1,707 | 22:September-04:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 202 | 1,614 | 13:September-21:September |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 142 | 1,603 | 22:September-09:September |
| UW Dörpen-West | TenneT DE | negative | 396 | 1,585 | 04:September-08:September | |
| UW Büttel | TenneT DE | negative | 494 | 1,482 | 19:September-22:September | |
| AVA Cluster Voslapp | TenneT DE | negative | 155 | 1,475 | 12:September-21:September | |
| Börse | TransnetBW | Sonstiges | negative | 121 | 1,452 | 22:September-10:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 121 | 1,452 | 22:September-10:September |
| NEURATH_G | Amprion | Konventionell | positive | 221 | 1,384 | 08:September-15:September |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,350 | 09:September-16:September | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 202 | 1,215 | 06:September-22:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 142 | 1,204 | 03:September-22:September |
| NEURATH_F | Amprion | Konventionell | positive | 217 | 1,196 | 09:September-15:September |
| Lippendorf | 50Hertz | Konventionell | negative | 393 | 1,179 | 06:September-21:September |
| UW Garrel-Ost alpha | TenneT DE | negative | 162 | 1,133 | 09:September-16:September | |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 182 | 909 | 08:September-13:September |
| NIEDERAUSSEM_K | Amprion | Konventionell | positive | 124 | 865 | 08:September-15:September |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 116 | 841 | 12:September-20:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 92 | 832 | 03:September-16:September |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 172 | 775 | 17:September-22:September | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 382 | 765 | 06:September-08:September |
| NIEHL-II | Amprion | Konventionell | positive | 117 | 759 | 22:September-04:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.34M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-17?
On 2026-09-17, estimated redispatch costs were approximately €1.12 million. This includes €0.32M for renewable curtailment compensation and €0.61M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-17?
The most affected plant was UW Dörpen-West (TenneT DE) with 23,677 MWh of negative redispatch.
What was the electricity spot price on 2026-09-17?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 233 €/MWh with an average of 139 €/MWh.