AVA Cluster Dipperz

ErneuerbarTenneT DE

283Total MWh
2Measures
85 MWAvg Power
2Curtailments
0Ramp-ups

Data: 2026-06-22 to 2026-06-23

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-06-23 1 238
2026-06-22 1 45

Recent Measures

DateTSODirAvg MWMWhTime
2026-06-23 TenneT DE negative 79 238 10:June-13:June
2026-06-22 TenneT DE negative 90 45 12:June-13:June

Frequently Asked Questions

What is the redispatch history of AVA Cluster Dipperz?

AVA Cluster Dipperz is a Erneuerbar power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 283 MWh since 2026-06-22.

Why is AVA Cluster Dipperz frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.