3,328MWh Curtailed
3,400MWh Ramped Up
€1.06MEst. Cost
245 MWPeak Positive

Day-Ahead Spot: 14-218 €/MWh (avg 130)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 23 73,768
Amprion positive 30 63,107
50Hertz negative 18 24,103
TenneT DE positive 9 19,993
TransnetBW positive 18 14,094
TransnetBW negative 2 1,357
Amprion negative 7 1,210
50Hertz positive 5 133

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Dörpen-West TenneT DE Erneuerbar negative 1532 27,577 04:September-22:September
UW Diele TenneT DE Erneuerbar negative 616 10,939 04:September-22:September
Börse TenneT DE Sonstiges positive 1007 8,808 04:September-22:September
LAUSWARD_GUDF Amprion Konventionell positive 383 6,997 22:September-22:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 615 6,304 22:September-08:September
Börse TenneT DE Sonstiges positive 752 6,019 22:September-22:September
AVA Cluster Voslapp TenneT DE Erneuerbar negative 402 5,121 05:September-17:September
Knapsack 1 Amprion Konventionell positive 361 4,871 05:September-22:September
WEISWEILER_H Amprion Konventionell positive 333 4,666 08:September-22:September
STUMMHAFEN_10 Amprion Konventionell positive 305 4,269 08:September-22:September
UW Büttel TenneT DE Erneuerbar negative 375 4,126 11:September-22:September
UW Dörpen-West TenneT DE Erneuerbar negative 666 3,998 22:September-04:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 465 3,607 23:September-22:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 253 3,542 22:September-22:September
KMW_KW3 Amprion Konventionell positive 223 3,396 22:September-13:September
UW Emden-Ost TenneT DE Erneuerbar negative 326 3,182 04:September-16:September
NEURATH_F Amprion Konventionell positive 489 3,179 08:September-15:September
WEISWEILER_H Amprion Konventionell positive 316 3,160 22:September-08:September
Emsland Block C Amprion Konventionell positive 242 3,150 22:September-22:September
STUMMHAFEN_10 Amprion Konventionell positive 331 3,060 07:September-20:September
Emsland Block C Amprion Konventionell positive 248 2,972 03:September-22:September
Emsland Block B Amprion Konventionell positive 225 2,926 22:September-22:September
UW Dörpen-West TenneT DE Erneuerbar negative 861 2,798 00:September-04:September
UW Büttel TenneT DE Erneuerbar negative 466 2,796 22:September-04:September
WEISWEILER_H Amprion Konventionell positive 236 2,650 06:September-22:September
ReserveKW Staudinger 5 TenneT DE Konventionell positive 217 2,495 23:September-11:September
KNAPSACK_20 Amprion Konventionell positive 278 2,361 22:September-22:September
Jänschwalde (Standort) 50Hertz Konventionell negative 197 2,264 06:September-18:September
illwerke vkw AG TransnetBW Sonstiges positive 420 2,204 04:September-21:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 311 2,176 15:September-22:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 194 2,089 11:September-22:September
Boxberg (Standort) 50Hertz Konventionell negative 253 2,025 22:September-20:September
Rostock Kohlekraftwerk 50Hertz Konventionell negative 209 1,986 22:September-07:September
Jänschwalde (Standort) 50Hertz Konventionell negative 163 1,960 22:September-22:September
HERDECKE_H6 Amprion Konventionell positive 250 1,940 14:September-22:September
Rostock Kohlekraftwerk 50Hertz Konventionell negative 175 1,930 00:September-22:September
Boxberg (Standort) 50Hertz Konventionell negative 304 1,822 15:September-21:September
Jänschwalde (Standort) 50Hertz Konventionell negative 239 1,674 00:September-22:September
GUD_HERNE_6 Amprion Konventionell positive 274 1,644 22:September-04:September
Jänschwalde (Standort) 50Hertz Konventionell negative 232 1,624 15:September-22:September
KNAPSACK_20 Amprion Konventionell positive 119 1,551 00:September-22:September
LAUSWARD_GUDF Amprion Konventionell positive 140 1,543 03:September-19:September
Irsching 5 TenneT DE Konventionell positive 276 1,448 16:September-22:September
GUD_HERNE_6 Amprion Konventionell positive 232 1,395 16:September-22:September
KMW_KW3 Amprion Konventionell positive 219 1,367 15:September-22:September
Emsland Block B Amprion Konventionell positive 170 1,364 14:September-22:September
UW Diele TenneT DE Erneuerbar negative 217 1,304 22:September-04:September
HAMMUENTROP_20 Amprion Konventionell positive 270 1,214 22:September-02:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 235 1,118 00:September-05:September
NIEHL-II Amprion Konventionell positive 180 1,080 22:September-04:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-03?

On 2026-09-03, estimated redispatch costs were approximately €1.06 million. This includes €0.33M for renewable curtailment compensation and €0.54M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-03?

The most affected plant was UW Dörpen-West (TenneT DE) with 27,577 MWh of negative redispatch.

What was the electricity spot price on 2026-09-03?

The EPEX Day-Ahead spot price for DE_LU ranged from 14 to 218 €/MWh with an average of 130 €/MWh.