1,539MWh Curtailed
2,298MWh Ramped Up
€0.6MEst. Cost
255 MWPeak Positive
Day-Ahead Spot: -19-138 €/MWh (avg 48)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 37 | 82,455 |
| Amprion | positive | 34 | 48,477 |
| TransnetBW | positive | 19 | 21,915 |
| 50Hertz | negative | 33 | 18,246 |
| TenneT DE | positive | 10 | 15,688 |
| Amprion | negative | 8 | 8,691 |
| 50Hertz | positive | 3 | 6,125 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Büttel | TenneT DE | negative | 1028 | 18,509 | 04:September-22:September | |
| UW Dörpen-West | TenneT DE | negative | 1010 | 18,171 | 04:September-22:September | |
| UW Diele | TenneT DE | negative | 735 | 13,235 | 04:September-22:September | |
| Börse | TenneT DE | Sonstiges | positive | 1006 | 8,801 | 22:September-07:September |
| UW Emden-Ost | TenneT DE | negative | 461 | 8,293 | 04:September-22:September | |
| WEISWEILER_H | Amprion | Konventionell | positive | 294 | 5,288 | 22:September-16:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 522 | 3,912 | 14:September-22:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 278 | 3,824 | 01:September-22:September |
| KMW_KW3 | Amprion | Konventionell | positive | 244 | 3,478 | 22:September-12:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 395 | 3,456 | 05:September-22:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | positive | 260 | 3,120 | 04:September-16:September |
| NIEHL-II | Amprion | Konventionell | positive | 219 | 2,958 | 00:September-21:September |
| Schkopau | 50Hertz | Konventionell | positive | 208 | 2,908 | 02:September-16:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 560 | 2,800 | 17:September-22:September |
| UW Dörpen-West | TenneT DE | negative | 548 | 2,739 | 22:September-03:September | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 336 | 2,685 | 22:September-06:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 120 | 2,400 | 02:September-22:September |
| Netzreservekraftwerk HERNE_4 | Amprion | Konventionell | positive | 135 | 2,287 | 05:September-22:September |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 413 | 2,273 | 22:September-03:September |
| Emsland Block C | Amprion | Konventionell | positive | 200 | 2,000 | 03:September-22:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 221 | 1,992 | 05:September-22:September |
| UW Büttel | TenneT DE | negative | 310 | 1,861 | 22:September-04:September | |
| NEURATH_G | Amprion | Konventionell | negative | 185 | 1,854 | 22:September-16:September |
| Irsching 5 | TenneT DE | Konventionell | positive | 263 | 1,840 | 15:September-22:September |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 148 | 1,811 | 02:September-22:September |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 343 | 1,800 | 15:September-20:September | |
| NEURATH_F | Amprion | Konventionell | negative | 198 | 1,782 | 22:September-07:September |
| UW Büttel | TenneT DE | negative | 244 | 1,710 | 11:September-18:September | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 244 | 1,710 | 11:September-18:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 323 | 1,613 | 17:September-22:September |
| AVA Cluster Voslapp | TenneT DE | negative | 280 | 1,612 | 15:September-21:September | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 209 | 1,568 | 00:September-08:September |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 207 | 1,549 | 05:September-22:September |
| NEURATH_G | Amprion | Konventionell | positive | 205 | 1,534 | 04:September-17:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 311 | 1,475 | 17:September-22:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 293 | 1,465 | 22:September-07:September |
| NEURATH_F | Amprion | Konventionell | positive | 193 | 1,444 | 04:September-17:September |
| UW Diele | TenneT DE | negative | 291 | 1,384 | 22:September-02:September | |
| UW Emden-Ost | TenneT DE | negative | 460 | 1,380 | 17:September-20:September | |
| NIEHL-II | Amprion | Konventionell | positive | 167 | 1,376 | 07:September-22:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 243 | 1,336 | 22:September-03:September |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 264 | 1,320 | 22:September-03:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 144 | 1,299 | 22:September-07:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 288 | 1,294 | 22:September-02:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 230 | 1,262 | 16:September-22:September |
| NEURATH_G | Amprion | Konventionell | negative | 237 | 1,242 | 16:September-22:September |
| AVA Cluster Dipperz | TenneT DE | negative | 124 | 1,240 | 06:September-22:September | |
| KNAPSACK_20 | Amprion | Konventionell | positive | 125 | 1,219 | 01:September-22:September |
| NEURATH_F | Amprion | Konventionell | negative | 227 | 1,192 | 16:September-22:September |
| 50H OWP Wikinger | 50Hertz | negative | 292 | 1,169 | 16:September-22:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.18M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-05?
On 2026-09-05, estimated redispatch costs were approximately €0.6 million. This includes €0.15M for renewable curtailment compensation and €0.18M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-05?
The most affected plant was UW Büttel (TenneT DE) with 18,509 MWh of negative redispatch.
What was the electricity spot price on 2026-09-05?
The EPEX Day-Ahead spot price for DE_LU ranged from -19 to 138 €/MWh with an average of 48 €/MWh.