3,197MWh Curtailed
4,031MWh Ramped Up
€1.2MEst. Cost
262 MWPeak Positive
Day-Ahead Spot: 13-255 €/MWh (avg 145)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| 50Hertz | negative | 46 | 44,850 |
| TenneT DE | negative | 22 | 36,564 |
| TransnetBW | positive | 28 | 35,148 |
| Amprion | positive | 17 | 15,949 |
| TenneT DE | positive | 2 | 8,546 |
| Amprion | negative | 8 | 3,855 |
| TransnetBW | negative | 2 | 517 |
| 50Hertz | positive | 5 | 182 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Büttel | TenneT DE | negative | 844 | 14,348 | 05:September-22:September | |
| Börse | TenneT DE | Sonstiges | positive | 764 | 8,406 | 22:September-10:October |
| UW Dörpen-West | TenneT DE | negative | 817 | 7,557 | 03:September-15:September | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 489 | 6,362 | 23:September-18:October |
| Lippendorf | 50Hertz | Konventionell | negative | 367 | 5,867 | 22:September-16:October |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 300 | 4,498 | 22:September-13:October |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 292 | 4,375 | 22:September-14:October |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 435 | 4,349 | 05:September-22:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 286 | 4,006 | 04:September-22:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 246 | 3,757 | 22:September-14:October |
| Emsland Block B | Amprion | Konventionell | positive | 248 | 3,538 | 22:September-15:October |
| UW Diele | TenneT DE | negative | 545 | 3,408 | 03:September-10:September | |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 229 | 3,028 | 02:September-15:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 248 | 2,731 | 05:September-22:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 235 | 2,586 | 01:September-15:September |
| Irsching 4 | TenneT DE | Konventionell | negative | 155 | 2,523 | 22:September-14:October |
| Schkopau | 50Hertz | Konventionell | negative | 245 | 2,446 | 22:September-11:October |
| HERDECKE_H6 | Amprion | Konventionell | positive | 160 | 2,443 | 00:September-22:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 168 | 2,357 | 23:September-14:October |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 350 | 2,100 | 08:September-14:September | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 231 | 1,960 | 04:September-15:September |
| Grosskraftwerk Mannheim Block 6 | TransnetBW | Konventionell | positive | 109 | 1,855 | 22:September-15:October |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 108 | 1,842 | 22:September-22:October |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 151 | 1,808 | 00:September-21:September |
| Lippendorf | 50Hertz | Konventionell | negative | 235 | 1,764 | 07:September-22:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 200 | 1,751 | 08:September-22:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 164 | 1,515 | 01:September-15:September |
| NEURATH_F | Amprion | Konventionell | negative | 282 | 1,479 | 09:September-15:September |
| Marbach GT 4 (bnBm) | TransnetBW | Konventionell | positive | 280 | 1,470 | 12:September-17:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 163 | 1,467 | 22:September-13:October |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 141 | 1,306 | 04:September-22:September |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 148 | 1,221 | 07:September-16:September | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,200 | 08:September-14:September | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,200 | 08:September-14:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 292 | 1,095 | 14:September-17:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 80 | 1,058 | 00:September-22:September |
| NEURATH_G | Amprion | Konventionell | negative | 247 | 988 | 10:September-14:September |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 110 | 986 | 05:September-22:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 138 | 929 | 00:September-08:September |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 90 | 921 | 05:September-22:September |
| Irsching 4 | TenneT DE | Konventionell | negative | 174 | 914 | 16:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 145 | 909 | 02:September-15:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 86 | 820 | 09:September-19:September |
| Schkopau | 50Hertz | Konventionell | negative | 269 | 806 | 19:September-22:September |
| Grosskraftwerk Mannheim Block 6 | TransnetBW | Konventionell | positive | 114 | 800 | 15:September-22:September |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 119 | 716 | 02:September-12:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 149 | 708 | 09:September-15:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 187 | 701 | 09:September-13:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 175 | 700 | 22:September-14:October |
| 50H OWP Arkona | 50Hertz | negative | 134 | 672 | 09:September-14:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.36M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-30?
On 2026-09-30, estimated redispatch costs were approximately €1.2 million. This includes €0.32M for renewable curtailment compensation and €0.71M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-30?
The most affected plant was UW Büttel (TenneT DE) with 14,348 MWh of negative redispatch.
What was the electricity spot price on 2026-09-30?
The EPEX Day-Ahead spot price for DE_LU ranged from 13 to 255 €/MWh with an average of 145 €/MWh.