← 2026-09-29

Wednesday, September 30, 2026

2026-10-01 →
3,197MWh Curtailed
4,031MWh Ramped Up
€1.2MEst. Cost
262 MWPeak Positive

Day-Ahead Spot: 13-255 €/MWh (avg 145)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 46 44,850
TenneT DE negative 22 36,564
TransnetBW positive 28 35,148
Amprion positive 17 15,949
TenneT DE positive 2 8,546
Amprion negative 8 3,855
TransnetBW negative 2 517
50Hertz positive 5 182

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Büttel TenneT DE Erneuerbar negative 844 14,348 05:September-22:September
Börse TenneT DE Sonstiges positive 764 8,406 22:September-10:October
UW Dörpen-West TenneT DE Erneuerbar negative 817 7,557 03:September-15:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 489 6,362 23:September-18:October
Lippendorf 50Hertz Konventionell negative 367 5,867 22:September-16:October
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 300 4,498 22:September-13:October
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 292 4,375 22:September-14:October
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 435 4,349 05:September-22:September
illwerke vkw AG TransnetBW Sonstiges positive 286 4,006 04:September-22:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 246 3,757 22:September-14:October
Emsland Block B Amprion Konventionell positive 248 3,538 22:September-15:October
UW Diele TenneT DE Erneuerbar negative 545 3,408 03:September-10:September
LAUSWARD_GUDF Amprion Konventionell positive 229 3,028 02:September-15:September
Boxberg (Standort) 50Hertz Konventionell negative 248 2,731 05:September-22:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 235 2,586 01:September-15:September
Irsching 4 TenneT DE Konventionell negative 155 2,523 22:September-14:October
Schkopau 50Hertz Konventionell negative 245 2,446 22:September-11:October
HERDECKE_H6 Amprion Konventionell positive 160 2,443 00:September-22:September
Jänschwalde (Standort) 50Hertz Konventionell negative 168 2,357 23:September-14:October
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 350 2,100 08:September-14:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 231 1,960 04:September-15:September
Grosskraftwerk Mannheim Block 6 TransnetBW Konventionell positive 109 1,855 22:September-15:October
50H Berlin Mitte 50Hertz Konventionell negative 108 1,842 22:September-22:October
Rostock Kohlekraftwerk 50Hertz Konventionell negative 151 1,808 00:September-21:September
Lippendorf 50Hertz Konventionell negative 235 1,764 07:September-22:September
Boxberg (Standort) 50Hertz Konventionell negative 200 1,751 08:September-22:September
WEISWEILER_H Amprion Konventionell positive 164 1,515 01:September-15:September
NEURATH_F Amprion Konventionell negative 282 1,479 09:September-15:September
Marbach GT 4 (bnBm) TransnetBW Konventionell positive 280 1,470 12:September-17:September
Jänschwalde (Standort) 50Hertz Konventionell negative 163 1,467 22:September-13:October
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 141 1,306 04:September-22:September
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 148 1,221 07:September-16:September
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,200 08:September-14:September
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,200 08:September-14:September
Lippendorf 50Hertz Konventionell negative 292 1,095 14:September-17:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 80 1,058 00:September-22:September
NEURATH_G Amprion Konventionell negative 247 988 10:September-14:September
50H Berlin Mitte 50Hertz Konventionell negative 110 986 05:September-22:September
KNAPSACK_20 Amprion Konventionell positive 138 929 00:September-08:September
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 90 921 05:September-22:September
Irsching 4 TenneT DE Konventionell negative 174 914 16:September-22:September
WEISWEILER_G Amprion Konventionell positive 145 909 02:September-15:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 86 820 09:September-19:September
Schkopau 50Hertz Konventionell negative 269 806 19:September-22:September
Grosskraftwerk Mannheim Block 6 TransnetBW Konventionell positive 114 800 15:September-22:September
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 119 716 02:September-12:September
illwerke vkw AG TransnetBW Sonstiges positive 149 708 09:September-15:September
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 187 701 09:September-13:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 175 700 22:September-14:October
50H OWP Arkona 50Hertz Erneuerbar negative 134 672 09:September-14:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.36M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-30?

On 2026-09-30, estimated redispatch costs were approximately €1.2 million. This includes €0.32M for renewable curtailment compensation and €0.71M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-30?

The most affected plant was UW Büttel (TenneT DE) with 14,348 MWh of negative redispatch.

What was the electricity spot price on 2026-09-30?

The EPEX Day-Ahead spot price for DE_LU ranged from 13 to 255 €/MWh with an average of 145 €/MWh.