← 2026-09-30

Thursday, October 1, 2026

2026-10-02 →
3,645MWh Curtailed
4,823MWh Ramped Up
€1.71MEst. Cost
315 MWPeak Positive

Day-Ahead Spot: 147-315 €/MWh (avg 196)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 40 21,039
Amprion positive 12 12,547
TransnetBW positive 15 10,087
TenneT DE negative 8 9,024
TransnetBW negative 6 5,101
TenneT DE positive 8 1,451
Amprion negative 4 821

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 559 5,454 05:October-15:October
Boxberg (Standort) 50Hertz Konventionell negative 576 5,180 06:October-15:October
Schkopau 50Hertz Konventionell negative 263 3,941 00:October-16:October
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 429 3,000 08:October-15:October
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell negative 136 2,928 22:October-22:October
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 120 2,880 22:October-22:October
illwerke vkw AG TransnetBW Sonstiges positive 240 1,922 08:October-16:October
WEISWEILER_H Amprion Konventionell positive 322 1,688 08:October-13:October
Boxberg (Standort) 50Hertz Konventionell negative 202 1,612 07:October-15:October
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 200 1,400 08:October-15:October
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,400 08:October-15:October
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 1,400 08:October-15:October
WEISWEILER_G Amprion Konventionell positive 332 1,328 09:October-13:October
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 120 1,080 13:October-22:October
50H OWP Wikinger 50Hertz Erneuerbar negative 249 1,056 09:October-15:October
Netzreservekraftwerk HERNE_4 Amprion Konventionell positive 134 1,040 12:October-20:October
50H OWP Arkona 50Hertz Erneuerbar negative 221 993 07:October-13:October
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell negative 109 985 13:October-22:October
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 213 958 09:October-15:October
WEISWEILERVGT_H3 Amprion Konventionell positive 158 909 09:October-15:October
illwerke vkw AG TransnetBW Sonstiges positive 400 900 07:October-10:October
50H OWP Windanker 50Hertz Erneuerbar negative 163 813 09:October-14:October
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 700 08:October-15:October
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 100 700 08:October-15:October
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 130 650 09:October-14:October
KMW_KW3 Amprion Konventionell positive 104 623 08:October-14:October
Jänschwalde (Standort) 50Hertz Konventionell negative 205 614 05:October-15:October
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 135 609 07:October-15:October
illwerke vkw AG TransnetBW Sonstiges positive 300 600 12:October-14:October
50H UW Bertikow 50Hertz Erneuerbar negative 140 593 09:October-14:October
WALSUM_10 Amprion Konventionell negative 144 578 02:October-06:October
50H Hamburg Wedel1 50Hertz Konventionell negative 104 572 09:October-14:October
Schkopau 50Hertz Konventionell negative 147 551 11:October-14:October
Börse TransnetBW Sonstiges negative 82 512 06:October-13:October
Börse TransnetBW Sonstiges negative 89 512 22:October-14:October
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 82 512 06:October-13:October
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 227 512 05:October-15:October
Braunschweig HKWM GT31 TenneT DE Konventionell positive 53 441 07:October-16:October
Goldisthal (Standort) 50Hertz Sonstiges negative 290 435 12:October-13:October
GERSTEINW_DTF2 (KapRes) Amprion Konventionell positive 100 425 07:October-11:October
Irsching 5 TenneT DE Konventionell negative 93 395 06:October-10:October
illwerke vkw AG TransnetBW Sonstiges positive 65 373 06:October-14:October
SW München KW-Pool TenneT DE Sonstiges positive 88 354 11:October-15:October
HUCKINGEN_A Amprion Konventionell positive 95 308 11:October-15:October
GERSTEINW_GTF1 (KapRes) Amprion Konventionell positive 41 285 04:October-11:October
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 92 275 10:October-13:October
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 181 271 08:October-10:October
Hohenwarte 2 (Standort) 50Hertz Sonstiges negative 211 264 11:October-12:October
HKW BARMEN 1 Amprion Konventionell positive 27 243 06:October-15:October
Hannover-Linden GuD TenneT DE Konventionell positive 50 236 08:October-13:October

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.51M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-10-01?

On 2026-10-01, estimated redispatch costs were approximately €1.71 million. This includes €0.36M for renewable curtailment compensation and €1.09M for conventional ramp-up costs.

Which power plants were most affected on 2026-10-01?

The most affected plant was Netzreservekraftwerk BERGKAMEN_A (Amprion) with 5,454 MWh of positive redispatch.

What was the electricity spot price on 2026-10-01?

The EPEX Day-Ahead spot price for DE_LU ranged from 147 to 315 €/MWh with an average of 196 €/MWh.