2,788MWh Curtailed
3,014MWh Ramped Up
€0.95MEst. Cost
302 MWPeak Positive
Day-Ahead Spot: 30-308 €/MWh (avg 126)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 7 | 5,489 |
| 50Hertz | negative | 21 | 3,941 |
| Amprion | positive | 5 | 2,277 |
| TenneT DE | positive | 2 | 741 |
| Amprion | negative | 2 | 388 |
| TransnetBW | positive | 1 | 129 |
| 50Hertz | positive | 1 | 10 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 300 | 2,700 | 07:June-16:June | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,800 | 07:June-16:June | |
| WALSUM_10 | Amprion | Konventionell | positive | 223 | 1,338 | 09:June-15:June |
| 50H PV Witznitz | 50Hertz | negative | 273 | 1,162 | 09:June-13:June | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 900 | 07:June-16:June | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 232 | 869 | 09:June-12:June | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 207 | 724 | 07:June-11:June |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 172 | 388 | 16:June-18:June |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 259 | 388 | 07:June-09:June |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 178 | 355 | 07:June-09:June |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 86 | 300 | 07:June-11:June |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 122 | 276 | 16:June-18:June |
| 50H PV Bartow | 50Hertz | negative | 97 | 218 | 09:June-11:June | |
| 50H_EDIS_CR_WU | 50Hertz | negative | 43 | 181 | 09:June-13:June | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 80 | 159 | 08:June-10:June | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 81 | 142 | 13:June-15:June |
| 50H PV Bartow | 50Hertz | negative | 59 | 132 | 08:June-10:June | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 103 | 129 | 08:June-10:June |
| 50H_WEMA_CR_GOE | 50Hertz | negative | 35 | 112 | 10:June-14:June | |
| KNAPSACK_20 | Amprion | Konventionell | negative | 90 | 112 | 17:June-18:June |
| WEISWEILER_G | Amprion | Konventionell | positive | 51 | 102 | 07:June-09:June |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 76 | 94 | 07:June-09:June |
| 50H_EDIS_CR_HND | 50Hertz | negative | 26 | 71 | 09:June-14:June | |
| 50H OWP Wikinger | 50Hertz | negative | 31 | 62 | 08:June-10:June | |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 35 | 61 | 09:June-11:June |
| AVA Cluster Dipperz | TenneT DE | negative | 90 | 45 | 12:June-13:June | |
| 50H PV Witznitz | 50Hertz | negative | 38 | 38 | 09:June-10:June | |
| 50H OWP Arkona | 50Hertz | negative | 26 | 26 | 09:June-10:June | |
| Börse | TenneT DE | Sonstiges | negative | 36 | 18 | 09:June-10:June |
| Börse | TenneT DE | Sonstiges | positive | 65 | 16 | 09:June-09:June |
| AVA Cluster Borken T411 T413 | TenneT DE | negative | 32 | 16 | 12:June-13:June | |
| 50H PV Haidemühl | 50Hertz | negative | 11 | 11 | 09:June-10:June | |
| Börse | 50Hertz | Sonstiges | positive | 14 | 10 | 03:June-10:June |
| AVA Cluster Gießen Nord T413 T414 | TenneT DE | negative | 18 | 9 | 12:June-13:June | |
| 50H UW Putlitz | 50Hertz | negative | 4 | 4 | 09:June-10:June | |
| 50H UW Putlitz | 50Hertz | negative | 1 | 2 | 07:June-09:June | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 2 | 1 | 09:June-10:June | |
| 50H UW Wustermark | 50Hertz | negative | 1 | 1 | 09:June-10:June | |
| 50H UW Schönewalde | 50Hertz | negative | 1 | 1 | 09:June-10:June |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-06-22?
On 2026-06-22, estimated redispatch costs were approximately €0.95 million. This includes €0.28M for renewable curtailment compensation and €0.47M for conventional ramp-up costs.
Which power plants were most affected on 2026-06-22?
The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,700 MWh of negative redispatch.
What was the electricity spot price on 2026-06-22?
The EPEX Day-Ahead spot price for DE_LU ranged from 30 to 308 €/MWh with an average of 126 €/MWh.