2,788MWh Curtailed
3,014MWh Ramped Up
€0.95MEst. Cost
302 MWPeak Positive

Day-Ahead Spot: 30-308 €/MWh (avg 126)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 7 5,489
50Hertz negative 21 3,941
Amprion positive 5 2,277
TenneT DE positive 2 741
Amprion negative 2 388
TransnetBW positive 1 129
50Hertz positive 1 10

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,700 07:June-16:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,800 07:June-16:June
WALSUM_10 Amprion Konventionell positive 223 1,338 09:June-15:June
50H PV Witznitz 50Hertz Erneuerbar negative 273 1,162 09:June-13:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 900 07:June-16:June
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 232 869 09:June-12:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 207 724 07:June-11:June
BIBLIS_GT (bnBm) Amprion Konventionell positive 172 388 16:June-18:June
HAMMUENTROP_20 Amprion Konventionell positive 259 388 07:June-09:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 178 355 07:June-09:June
Boxberg (Standort) 50Hertz Konventionell negative 86 300 07:June-11:June
GUD_HERNE_6 Amprion Konventionell negative 122 276 16:June-18:June
50H PV Bartow 50Hertz Erneuerbar negative 97 218 09:June-11:June
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 43 181 09:June-13:June
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 80 159 08:June-10:June
Boxberg (Standort) 50Hertz Konventionell negative 81 142 13:June-15:June
50H PV Bartow 50Hertz Erneuerbar negative 59 132 08:June-10:June
illwerke vkw AG TransnetBW Sonstiges positive 103 129 08:June-10:June
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 35 112 10:June-14:June
KNAPSACK_20 Amprion Konventionell negative 90 112 17:June-18:June
WEISWEILER_G Amprion Konventionell positive 51 102 07:June-09:June
50H Berlin Marzahn 50Hertz Konventionell negative 76 94 07:June-09:June
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 26 71 09:June-14:June
50H OWP Wikinger 50Hertz Erneuerbar negative 31 62 08:June-10:June
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 35 61 09:June-11:June
AVA Cluster Dipperz TenneT DE Erneuerbar negative 90 45 12:June-13:June
50H PV Witznitz 50Hertz Erneuerbar negative 38 38 09:June-10:June
50H OWP Arkona 50Hertz Erneuerbar negative 26 26 09:June-10:June
Börse TenneT DE Sonstiges negative 36 18 09:June-10:June
Börse TenneT DE Sonstiges positive 65 16 09:June-09:June
AVA Cluster Borken T411 T413 TenneT DE Erneuerbar negative 32 16 12:June-13:June
50H PV Haidemühl 50Hertz Erneuerbar negative 11 11 09:June-10:June
Börse 50Hertz Sonstiges positive 14 10 03:June-10:June
AVA Cluster Gießen Nord T413 T414 TenneT DE Erneuerbar negative 18 9 12:June-13:June
50H UW Putlitz 50Hertz Erneuerbar negative 4 4 09:June-10:June
50H UW Putlitz 50Hertz Erneuerbar negative 1 2 07:June-09:June
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 2 1 09:June-10:June
50H UW Wustermark 50Hertz Erneuerbar negative 1 1 09:June-10:June
50H UW Schönewalde 50Hertz Erneuerbar negative 1 1 09:June-10:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-22?

On 2026-06-22, estimated redispatch costs were approximately €0.95 million. This includes €0.28M for renewable curtailment compensation and €0.47M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-22?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,700 MWh of negative redispatch.

What was the electricity spot price on 2026-06-22?

The EPEX Day-Ahead spot price for DE_LU ranged from 30 to 308 €/MWh with an average of 126 €/MWh.