← 2026-06-22

Tuesday, June 23, 2026

2026-06-24 →
2,983MWh Curtailed
4,534MWh Ramped Up
€1.55MEst. Cost
658 MWPeak Positive

Day-Ahead Spot: 57-615 €/MWh (avg 177)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 28 20,092
TenneT DE negative 20 13,502
Amprion positive 11 11,591
TransnetBW positive 5 4,975
Amprion negative 4 4,676
TransnetBW negative 1 146

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 390 3,895 04:June-16:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 475 3,802 08:June-16:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 285 2,426 02:June-11:June
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,400 07:June-15:June
NIEDERAUSSEM_K Amprion Konventionell negative 326 2,364 08:June-15:June
KMW_KW3 Amprion Konventionell positive 271 2,101 07:June-15:June
illwerke vkw AG TransnetBW Sonstiges positive 259 2,005 07:June-16:June
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 400 2,000 08:June-13:June
NEURATH_F Amprion Konventionell negative 300 1,876 08:June-14:June
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 333 1,746 08:June-14:June
Boxberg (Standort) 50Hertz Konventionell negative 226 1,696 02:June-10:June
Boxberg (Standort) 50Hertz Konventionell negative 272 1,635 07:June-16:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 300 1,500 08:June-13:June
BAG NWAK-Cluster 06 Raitersaich TenneT DE Erneuerbar negative 290 1,450 08:June-13:June
50H_AVA_CR_STW 50Hertz Erneuerbar negative 288 1,438 08:June-13:June
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 282 1,412 08:June-13:June
BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim TenneT DE Erneuerbar negative 280 1,400 08:June-13:June
50H PV Witznitz 50Hertz Erneuerbar negative 233 1,399 06:June-13:June
Emsland Block C Amprion Konventionell positive 222 1,112 04:June-09:June
Emsland Block B Amprion Konventionell positive 180 1,034 04:June-09:June
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 192 912 08:June-13:June
50H_EDIS_CR_PE 50Hertz Erneuerbar negative 164 900 08:June-13:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 800 07:June-15:June
Jänschwalde (Standort) 50Hertz Konventionell negative 142 746 03:June-09:June
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 165 660 09:June-13:June
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 162 650 09:June-13:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 131 622 09:June-14:June
50H PV Bartow 50Hertz Erneuerbar negative 148 592 09:June-13:June
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 128 542 08:June-13:June
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 55 524 06:June-16:June
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 70 491 08:June-15:June
Irsching 4 TenneT DE Konventionell negative 150 449 04:June-07:June
50H_MNS_CR_JSN 50Hertz Erneuerbar negative 145 435 09:June-12:June
50H Berlin Marzahn 50Hertz Konventionell negative 72 432 05:June-14:June
Rostock Kohlekraftwerk 50Hertz Konventionell negative 168 420 08:June-10:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 186 373 08:June-10:June
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 77 345 08:June-13:June
50H_EDIS_CR_PZS 50Hertz Erneuerbar negative 81 325 08:June-12:June
HAMMUENTROP_20 Amprion Konventionell positive 98 318 05:June-09:June
AMP_LEW_VERTEILNETZ_NORD_CR_PHOTOVOLTAIK Amprion Erneuerbar negative 270 270 09:June-10:June
50H_MNS_CR_RAG 50Hertz Erneuerbar negative 173 260 10:June-12:June
AVA Cluster Dipperz TenneT DE Erneuerbar negative 79 238 10:June-13:June
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 144 215 10:June-12:June
Börse TransnetBW Sonstiges positive 84 209 04:June-07:June
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 40 200 08:June-13:June
WEISWEILER_H Amprion Konventionell positive 200 200 08:June-09:June
WEISWEILER_G Amprion Konventionell positive 160 200 08:June-10:June
50H_WEMA_CR_PE 50Hertz Erneuerbar negative 50 188 08:June-12:June
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 41 173 09:June-14:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.47M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-23?

On 2026-06-23, estimated redispatch costs were approximately €1.55 million. This includes €0.3M for renewable curtailment compensation and €0.94M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-23?

The most affected plant was Schwarze Pumpe (Standort) (50Hertz) with 3,895 MWh of negative redispatch.

What was the electricity spot price on 2026-06-23?

The EPEX Day-Ahead spot price for DE_LU ranged from 57 to 615 €/MWh with an average of 177 €/MWh.