2,526MWh Curtailed
2,755MWh Ramped Up
€0.88MEst. Cost
207 MWPeak Positive
Day-Ahead Spot: 0-205 €/MWh (avg 111)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 38 | 21,483 |
| 50Hertz | negative | 66 | 20,748 |
| TransnetBW | positive | 12 | 17,428 |
| Amprion | positive | 24 | 13,464 |
| Amprion | negative | 4 | 4,468 |
| TenneT DE | positive | 8 | 1,126 |
| TransnetBW | negative | 4 | 450 |
| 50Hertz | positive | 2 | 10 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 455 | 6,141 | 02:August-16:August |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 455 | 6,141 | 02:August-16:August |
| UW Büttel | TenneT DE | negative | 312 | 3,896 | 02:August-15:August | |
| UW Büttel | TenneT DE | negative | 312 | 3,896 | 02:August-15:August | |
| 50H PV Witznitz | 50Hertz | negative | 320 | 2,560 | 07:August-15:August | |
| 50H PV Witznitz | 50Hertz | negative | 320 | 2,560 | 07:August-15:August | |
| KMW_KW3 | Amprion | Konventionell | positive | 238 | 2,497 | 06:August-16:August |
| KMW_KW3 | Amprion | Konventionell | positive | 238 | 2,497 | 06:August-16:August |
| NIEDERAUSSEM_K | Amprion | Konventionell | positive | 193 | 1,301 | 08:August-15:August |
| NIEDERAUSSEM_K | Amprion | Konventionell | positive | 193 | 1,301 | 08:August-15:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 317 | 1,268 | 04:August-08:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 317 | 1,268 | 04:August-08:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 433 | 1,191 | 05:August-08:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 433 | 1,191 | 05:August-08:August |
| Datteln_4 | Amprion | Konventionell | negative | 340 | 1,189 | 06:August-16:August |
| Datteln_4 | Amprion | Konventionell | negative | 340 | 1,189 | 06:August-16:August |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 150 | 1,125 | 09:August-17:August | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 1,125 | 09:August-17:August | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 150 | 1,125 | 09:August-17:August | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 1,125 | 09:August-17:August | |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 174 | 1,045 | 06:August-17:August |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 174 | 1,045 | 06:August-17:August |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 250 | 1,000 | 06:August-10:August | |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 250 | 1,000 | 06:August-10:August | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 216 | 866 | 04:August-08:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 216 | 866 | 04:August-08:August |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 258 | 838 | 05:August-08:August | |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 258 | 838 | 05:August-08:August | |
| Lippendorf | 50Hertz | Konventionell | negative | 271 | 813 | 04:August-07:August |
| Lippendorf | 50Hertz | Konventionell | negative | 271 | 813 | 04:August-07:August |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 750 | 09:August-17:August | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 750 | 09:August-17:August | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 248 | 746 | 05:August-08:August |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 248 | 746 | 05:August-08:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 172 | 730 | 16:August-21:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 172 | 730 | 16:August-21:August |
| Schkopau | 50Hertz | Konventionell | negative | 230 | 690 | 04:August-07:August |
| Schkopau | 50Hertz | Konventionell | negative | 230 | 690 | 04:August-07:August |
| KMW_KW3 | Amprion | Konventionell | positive | 236 | 648 | 05:August-08:August |
| KMW_KW3 | Amprion | Konventionell | positive | 236 | 648 | 05:August-08:August |
| WEISWEILER_H | Amprion | Konventionell | positive | 210 | 630 | 06:August-09:August |
| WEISWEILER_H | Amprion | Konventionell | positive | 210 | 630 | 06:August-09:August |
| 50H_AVA_CR_STW | 50Hertz | negative | 233 | 525 | 06:August-08:August | |
| 50H_AVA_CR_STW | 50Hertz | negative | 233 | 525 | 06:August-08:August | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 230 | 460 | 06:August-08:August | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 230 | 460 | 06:August-08:August | |
| Emsland Block B | Amprion | Konventionell | positive | 74 | 446 | 14:August-20:August |
| Emsland Block B | Amprion | Konventionell | positive | 74 | 446 | 14:August-20:August |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 217 | 434 | 15:August-17:August |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 217 | 434 | 15:August-17:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-11?
On 2026-08-11, estimated redispatch costs were approximately €0.88 million. This includes €0.25M for renewable curtailment compensation and €0.39M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-11?
The most affected plant was Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 (TransnetBW) with 6,141 MWh of positive redispatch.
What was the electricity spot price on 2026-08-11?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 205 €/MWh with an average of 111 €/MWh.