← 2026-07-06

Tuesday, July 7, 2026

2026-07-08 →
1,874MWh Curtailed
2,260MWh Ramped Up
€0.67MEst. Cost
215 MWPeak Positive

Day-Ahead Spot: -4-129 €/MWh (avg 73)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 36 61,883
Amprion positive 28 60,275
50Hertz negative 31 32,132
TenneT DE positive 7 28,533
TransnetBW positive 16 27,643
Amprion negative 5 4,255
TransnetBW negative 1 749

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 1050 25,209 22:July-22:July
UW Büttel TenneT DE Erneuerbar negative 908 16,351 04:July-22:July
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 649 12,335 22:July-17:July
UW Dörpen-West TenneT DE Erneuerbar negative 612 8,574 04:July-18:July
WEISWEILER_G Amprion Konventionell positive 424 8,480 22:July-18:July
Knapsack 1 Amprion Konventionell positive 602 7,526 03:July-22:July
WEISWEILER_G Amprion Konventionell positive 390 7,119 03:July-22:July
Knapsack 1 Amprion Konventionell positive 600 6,897 22:July-09:July
AVA Cluster Voslapp TenneT DE Erneuerbar negative 517 6,722 08:July-21:July
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 283 6,020 22:July-19:July
LAUSWARD_GUDF Amprion Konventionell positive 383 5,650 22:July-17:July
UW Emden-Ost TenneT DE Erneuerbar negative 538 5,648 11:July-22:July
LAUSWARD_GUDF Amprion Konventionell positive 451 5,411 05:July-22:July
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 379 4,544 08:July-22:July
Boxberg (Standort) 50Hertz Konventionell negative 384 4,220 22:July-17:July
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 527 4,216 14:July-22:July
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 192 3,600 22:July-16:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 245 3,183 22:July-18:July
UW Büttel TenneT DE Erneuerbar negative 596 3,127 22:July-04:July
Lippendorf 50Hertz Konventionell negative 291 2,909 22:July-08:July
illwerke vkw AG TransnetBW Sonstiges positive 343 2,744 04:July-20:July
GUD_HERNE_6 Amprion Konventionell positive 444 2,665 16:July-22:July
NIEHL-31-GUD Amprion Konventionell positive 246 2,642 05:July-22:July
WALSUM_10 Amprion Konventionell positive 238 2,437 22:July-17:July
WEISWEILER_H Amprion Konventionell positive 203 2,180 04:July-22:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 237 2,012 07:July-16:July
WALSUM_10 Amprion Konventionell positive 218 1,964 03:July-22:July
Datteln_4 Amprion Konventionell negative 223 1,952 06:July-22:July
SHN Cluster Handewitt T414 T415 TenneT DE Erneuerbar negative 195 1,900 06:July-16:July
WEISWEILER_H Amprion Konventionell positive 158 1,858 22:July-20:July
50H OWP Arkona 50Hertz Erneuerbar negative 302 1,810 12:July-20:July
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 200 1,700 07:July-16:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,700 07:July-16:July
Jänschwalde (Standort) 50Hertz Konventionell negative 145 1,599 22:July-17:July
HERDECKE_H6 Amprion Konventionell positive 216 1,458 15:July-22:July
50H Berlin Marzahn 50Hertz Konventionell negative 96 1,439 22:July-20:July
ReserveKW Staudinger 4 TenneT DE Konventionell positive 299 1,422 03:July-08:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 1,275 07:July-16:July
AVA Cluster Mehringen TenneT DE Erneuerbar negative 218 1,147 16:July-21:July
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 173 1,125 15:July-22:July
SHN Cluster Husum Nord TenneT DE Erneuerbar negative 173 1,125 15:July-22:July
UW Diele TenneT DE Erneuerbar negative 248 1,053 06:July-17:July
WEISWEILER_G Amprion Konventionell positive 127 987 22:July-19:July
ReserveKW Staudinger 4 TenneT DE Konventionell positive 210 892 15:July-21:July
Rostock Kohlekraftwerk 50Hertz Konventionell negative 222 890 18:July-22:July
SHN Cluster Süderdonn T412 T413 TenneT DE Erneuerbar negative 81 888 09:July-20:July
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 174 869 17:July-22:July
Datteln_4 Amprion Konventionell negative 173 866 22:July-17:July
UW Garrel-Ost alpha TenneT DE Erneuerbar negative 144 864 14:July-20:July
Börse TransnetBW Sonstiges negative 65 749 23:July-21:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-07?

On 2026-07-07, estimated redispatch costs were approximately €0.67 million. This includes €0.19M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-07?

The most affected plant was Börse (TenneT DE) with 25,209 MWh of positive redispatch.

What was the electricity spot price on 2026-07-07?

The EPEX Day-Ahead spot price for DE_LU ranged from -4 to 129 €/MWh with an average of 73 €/MWh.