← 2026-08-23

Monday, August 24, 2026

2026-08-25 →
3,520MWh Curtailed
3,308MWh Ramped Up
€1.07MEst. Cost
225 MWPeak Positive

Day-Ahead Spot: 20-250 €/MWh (avg 143)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 5 3,150
Amprion negative 3 1,432
50Hertz negative 7 1,280
Amprion positive 1 686
TenneT DE positive 1 158
TransnetBW negative 1 98
TransnetBW positive 1 16

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,400 09:August-16:August
NEURATH_G Amprion Konventionell negative 190 950 11:August-16:August
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 100 700 09:August-16:August
WEISWEILER_G Amprion Konventionell positive 229 686 07:August-10:August
Irsching 4 TenneT DE Konventionell negative 100 600 16:August-22:August
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 210 419 07:August-09:August
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 350 09:August-16:August
50H PV Witznitz 50Hertz Erneuerbar negative 205 308 09:August-10:August
Datteln_4 Amprion Konventionell negative 81 282 10:August-13:August
50H PV Witznitz 50Hertz Erneuerbar negative 78 235 11:August-14:August
Datteln_4 Amprion Konventionell negative 100 200 14:August-16:August
Hannover-Linden GuD TenneT DE Konventionell positive 52 158 07:August-10:August
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 70 140 14:August-16:August
Rostock Kohlekraftwerk 50Hertz Konventionell negative 84 105 07:August-09:August
AVA Cluster Dipperz TenneT DE Erneuerbar negative 100 100 13:August-14:August
Börse TransnetBW Sonstiges negative 78 98 07:August-16:August
Jänschwalde (Standort) 50Hertz Konventionell negative 63 63 08:August-09:August
Börse TransnetBW Sonstiges positive 31 16 07:August-10:August
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 20 10 09:August-09:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-24?

On 2026-08-24, estimated redispatch costs were approximately €1.07 million. This includes €0.35M for renewable curtailment compensation and €0.57M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-24?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 1,400 MWh of negative redispatch.

What was the electricity spot price on 2026-08-24?

The EPEX Day-Ahead spot price for DE_LU ranged from 20 to 250 €/MWh with an average of 143 €/MWh.