3,520MWh Curtailed
3,308MWh Ramped Up
€1.07MEst. Cost
225 MWPeak Positive
Day-Ahead Spot: 20-250 €/MWh (avg 143)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 5 | 3,150 |
| Amprion | negative | 3 | 1,432 |
| 50Hertz | negative | 7 | 1,280 |
| Amprion | positive | 1 | 686 |
| TenneT DE | positive | 1 | 158 |
| TransnetBW | negative | 1 | 98 |
| TransnetBW | positive | 1 | 16 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,400 | 09:August-16:August | |
| NEURATH_G | Amprion | Konventionell | negative | 190 | 950 | 11:August-16:August |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 700 | 09:August-16:August | |
| WEISWEILER_G | Amprion | Konventionell | positive | 229 | 686 | 07:August-10:August |
| Irsching 4 | TenneT DE | Konventionell | negative | 100 | 600 | 16:August-22:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 210 | 419 | 07:August-09:August |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 50 | 350 | 09:August-16:August | |
| 50H PV Witznitz | 50Hertz | negative | 205 | 308 | 09:August-10:August | |
| Datteln_4 | Amprion | Konventionell | negative | 81 | 282 | 10:August-13:August |
| 50H PV Witznitz | 50Hertz | negative | 78 | 235 | 11:August-14:August | |
| Datteln_4 | Amprion | Konventionell | negative | 100 | 200 | 14:August-16:August |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 52 | 158 | 07:August-10:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 70 | 140 | 14:August-16:August |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 84 | 105 | 07:August-09:August |
| AVA Cluster Dipperz | TenneT DE | negative | 100 | 100 | 13:August-14:August | |
| Börse | TransnetBW | Sonstiges | negative | 78 | 98 | 07:August-16:August |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 63 | 63 | 08:August-09:August |
| Börse | TransnetBW | Sonstiges | positive | 31 | 16 | 07:August-10:August |
| 50H OWP Baltic Eagle | 50Hertz | negative | 20 | 10 | 09:August-09:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-24?
On 2026-08-24, estimated redispatch costs were approximately €1.07 million. This includes €0.35M for renewable curtailment compensation and €0.57M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-24?
The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 1,400 MWh of negative redispatch.
What was the electricity spot price on 2026-08-24?
The EPEX Day-Ahead spot price for DE_LU ranged from 20 to 250 €/MWh with an average of 143 €/MWh.