Sunday, August 23, 2026

2026-08-24 →
3,042MWh Curtailed
2,152MWh Ramped Up
€0.85MEst. Cost
194 MWPeak Positive

Day-Ahead Spot: -6-189 €/MWh (avg 88)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 1 1,379
TenneT DE negative 3 1,086
Amprion negative 1 886
TransnetBW positive 1 29
50Hertz positive 1 16

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Boxberg (Standort) 50Hertz Konventionell negative 460 1,379 03:August-06:August
Datteln_4 Amprion Konventionell negative 209 886 01:August-06:August
UW Dörpen-West TenneT DE Erneuerbar negative 193 531 04:August-07:August
UW Büttel TenneT DE Erneuerbar negative 301 376 04:August-05:August
UW Diele TenneT DE Erneuerbar negative 179 179 06:August-07:August
Börse TransnetBW Sonstiges positive 116 29 05:August-06:August
Börse 50Hertz Sonstiges positive 9 16 00:August-02:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-23?

On 2026-08-23, estimated redispatch costs were approximately €0.85 million. This includes €0.3M for renewable curtailment compensation and €0.25M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-23?

The most affected plant was Boxberg (Standort) (50Hertz) with 1,379 MWh of negative redispatch.

What was the electricity spot price on 2026-08-23?

The EPEX Day-Ahead spot price for DE_LU ranged from -6 to 189 €/MWh with an average of 88 €/MWh.