← 2026-10-04

Monday, October 5, 2026

2026-10-06 →
2,988MWh Curtailed
4,113MWh Ramped Up
€1.34MEst. Cost
271 MWPeak Positive

Day-Ahead Spot: 5-261 €/MWh (avg 155)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 16 40,725
TenneT DE positive 12 31,148
Amprion positive 24 26,764
TransnetBW positive 14 14,089
50Hertz negative 17 8,439
50Hertz positive 5 1,789
TransnetBW negative 1 29
Amprion negative 1 8

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Dörpen-West TenneT DE Erneuerbar negative 1132 20,377 04:October-22:October
Börse TenneT DE Sonstiges positive 947 14,917 03:October-22:October
UW Diele TenneT DE Erneuerbar negative 481 8,532 04:October-21:October
ReserveKW Zolling 5 TenneT DE Konventionell positive 271 6,515 22:October-22:October
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 320 5,042 05:October-21:October
Emsland Block D Amprion Konventionell positive 462 4,852 01:October-16:October
UW Büttel TenneT DE Erneuerbar negative 468 4,449 06:October-15:October
Emsland Block D Amprion Konventionell positive 379 4,174 22:October-13:October
Emsland Block B Amprion Konventionell positive 201 4,129 01:October-22:October
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 260 3,831 04:October-18:October
Emsland Block B Amprion Konventionell positive 238 2,619 22:October-13:October
Börse TenneT DE Sonstiges positive 641 2,565 22:October-02:October
UW Dörpen-West TenneT DE Erneuerbar negative 691 2,072 22:October-01:October
KMW_KW3 Amprion Konventionell positive 274 1,990 08:October-15:October
Gebersdorf 1 TenneT DE Konventionell positive 249 1,928 14:October-22:October
Irsching 5 TenneT DE Konventionell positive 207 1,654 14:October-22:October
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 260 1,560 08:October-14:October
WEISWEILER_H Amprion Konventionell positive 198 1,433 00:October-15:October
Gebersdorf 1 TenneT DE Konventionell positive 121 1,422 22:October-09:October
UW Emden-Ost TenneT DE Erneuerbar negative 237 1,301 09:October-15:October
Emsland Block B Amprion Konventionell positive 101 1,213 05:October-22:October
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 201 1,155 08:October-14:October
Rostock Kohlekraftwerk 50Hertz Konventionell negative 185 1,108 16:October-22:October
Lippendorf 50Hertz Konventionell negative 215 1,077 04:October-09:October
Hannover-Linden GuD TenneT DE Konventionell positive 92 1,060 22:October-13:October
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 148 1,032 02:October-09:October
UW Büttel TenneT DE Erneuerbar negative 500 1,000 04:October-06:October
WEISWEILER_G Amprion Konventionell positive 165 990 22:October-14:October
Emsland Block D Amprion Konventionell positive 325 976 00:October-03:October
Lippendorf 50Hertz Konventionell negative 317 952 06:October-09:October
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 160 923 08:October-14:October
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 281 843 07:October-10:October
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 800 08:October-12:October
illwerke vkw AG TransnetBW Sonstiges positive 166 788 07:October-22:October
50H Berlin Mitte 50Hertz Konventionell positive 104 731 13:October-20:October
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 100 700 08:October-15:October
Boxberg (Standort) 50Hertz Konventionell negative 348 696 07:October-09:October
WEISWEILER_G Amprion Konventionell positive 145 651 00:October-15:October
Boxberg (Standort) 50Hertz Konventionell positive 310 620 14:October-16:October
Hannover-Linden GuD TenneT DE Konventionell positive 39 585 04:October-19:October
WEISWEILER_H Amprion Konventionell positive 144 578 22:October-14:October
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 37 554 22:October-19:October
Schkopau 50Hertz Konventionell negative 166 498 23:October-09:October
KMW_KW5 Amprion Konventionell positive 58 462 14:October-22:October
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 83 438 09:October-14:October
Börse Amprion Konventionell positive 175 437 06:October-09:October
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 400 08:October-12:October
Jänschwalde (Standort) 50Hertz Konventionell negative 96 385 08:October-21:October
SW München KW-Pool TenneT DE Sonstiges positive 76 344 07:October-16:October
50H Hamburg Wedel1 50Hertz Konventionell negative 49 343 00:October-07:October

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.4M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-10-05?

On 2026-10-05, estimated redispatch costs were approximately €1.34 million. This includes €0.3M for renewable curtailment compensation and €0.76M for conventional ramp-up costs.

Which power plants were most affected on 2026-10-05?

The most affected plant was UW Dörpen-West (TenneT DE) with 20,377 MWh of negative redispatch.

What was the electricity spot price on 2026-10-05?

The EPEX Day-Ahead spot price for DE_LU ranged from 5 to 261 €/MWh with an average of 155 €/MWh.