3,320MWh Curtailed
4,015MWh Ramped Up
€1.35MEst. Cost
245 MWPeak Positive

Day-Ahead Spot: 42-245 €/MWh (avg 166)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 9 9,737
TenneT DE positive 3 9,406
Amprion positive 2 4,281
50Hertz negative 11 2,671
TransnetBW positive 1 480
TransnetBW negative 1 450
Amprion negative 1 130

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Zolling 5 TenneT DE Konventionell positive 281 6,750 22:October-22:October
KNAPSACK_20 Amprion Konventionell positive 237 4,141 22:October-15:October
UW Dörpen-West TenneT DE Erneuerbar negative 392 2,353 22:October-04:October
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 271 1,900 08:October-15:October
Hannover-Linden GuD TenneT DE Konventionell positive 70 1,603 22:October-21:October
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 221 1,550 08:October-15:October
Börse TenneT DE Sonstiges negative 210 1,052 17:October-22:October
ReserveKW Zolling 5 TenneT DE Konventionell positive 210 1,052 17:October-22:October
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,000 10:October-15:October
Börse TenneT DE Sonstiges negative 298 745 22:October-01:October
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 100 700 08:October-15:October
Rostock Kohlekraftwerk 50Hertz Konventionell negative 111 667 22:October-06:October
Rostock Kohlekraftwerk 50Hertz Konventionell negative 73 583 23:October-22:October
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 120 480 22:October-02:October
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell negative 112 450 22:October-02:October
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell negative 47 379 22:October-08:October
UW Büttel TenneT DE Erneuerbar negative 59 356 22:October-04:October
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 100 175 10:October-12:October
50H_EDIS_CR_BW 50Hertz Erneuerbar negative 56 168 08:October-11:October
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 81 162 08:October-11:October
NIEHL-31-GUD Amprion Konventionell positive 140 140 08:October-09:October
50H_EDIS_CR_SOW_Nord 50Hertz Erneuerbar negative 46 139 08:October-11:October
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 132 132 10:October-11:October
WALSUM_10 Amprion Konventionell negative 65 130 23:October-06:October
50H_EDIS_CR_LHG 50Hertz Erneuerbar negative 36 126 08:October-11:October
UW Büttel TenneT DE Erneuerbar negative 80 80 08:October-09:October
50H PV Witznitz 50Hertz Erneuerbar negative 79 79 08:October-09:October
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 61 61 08:October-09:October

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.41M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-10-04?

On 2026-10-04, estimated redispatch costs were approximately €1.35 million. This includes €0.33M for renewable curtailment compensation and €0.79M for conventional ramp-up costs.

Which power plants were most affected on 2026-10-04?

The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 6,750 MWh of positive redispatch.

What was the electricity spot price on 2026-10-04?

The EPEX Day-Ahead spot price for DE_LU ranged from 42 to 245 €/MWh with an average of 166 €/MWh.