Tuesday, October 6, 2026

2026-10-07 →
3,620MWh Curtailed
4,982MWh Ramped Up
€1.77MEst. Cost
406 MWPeak Positive

Day-Ahead Spot: 124-406 €/MWh (avg 205)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 48 25,151
TenneT DE negative 9 13,229
Amprion positive 15 10,512
TenneT DE positive 12 9,750
TransnetBW positive 7 4,357
TransnetBW negative 4 1,646

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Zolling 5 TenneT DE Konventionell positive 286 6,875 22:October-22:October
Börse TenneT DE Sonstiges negative 264 5,469 22:October-22:October
Lippendorf 50Hertz Konventionell negative 521 5,214 06:October-16:October
Börse TenneT DE Sonstiges negative 211 3,055 01:October-22:October
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 289 2,600 00:October-14:October
HAMMUENTROP_20 Amprion Konventionell positive 356 2,135 08:October-14:October
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 400 2,000 08:October-13:October
illwerke vkw AG TransnetBW Sonstiges positive 239 1,790 08:October-16:October
KNAPSACK_20 Amprion Konventionell positive 296 1,776 08:October-14:October
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 400 1,600 09:October-13:October
Boxberg (Standort) 50Hertz Konventionell negative 223 1,560 00:October-14:October
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 310 1,550 09:October-14:October
KMW_KW3 Amprion Konventionell positive 251 1,507 08:October-14:October
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 265 1,392 08:October-13:October
Boxberg (Standort) 50Hertz Konventionell negative 142 1,346 06:October-16:October
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 321 1,285 07:October-13:October
GERSTEINW_G (KapRes) Amprion Konventionell positive 118 1,238 02:October-13:October
NIEHL-II Amprion Konventionell positive 247 1,235 09:October-14:October
Schkopau 50Hertz Konventionell negative 122 1,221 04:October-14:October
50H PV Witznitz 50Hertz Erneuerbar negative 206 1,132 08:October-14:October
Rostock Kohlekraftwerk 50Hertz Konventionell negative 154 1,075 08:October-15:October
50H Berlin Mitte 50Hertz Konventionell negative 84 1,003 00:October-14:October
Kirchlengern GT 1 (KapRes) TenneT DE Konventionell positive 82 815 08:October-18:October
GUD_HERNE_6 Amprion Konventionell positive 191 810 09:October-14:October
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 180 810 06:October-14:October
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 144 757 08:October-13:October
50H_TEN_CR_S1_ATF 50Hertz Erneuerbar negative 193 675 08:October-13:October
NIEHL-31-GUD Amprion Konventionell positive 221 664 09:October-12:October
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell negative 135 642 09:October-13:October
ReserveKW Plattling TenneT DE Konventionell positive 41 572 08:October-22:October
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 79 555 06:October-19:October
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell negative 129 550 09:October-14:October
50H OWP Arkona 50Hertz Erneuerbar negative 137 546 08:October-12:October
Börse TenneT DE Sonstiges negative 42 545 08:October-22:October
Jänschwalde (Standort) 50Hertz Konventionell negative 101 503 00:October-10:October
50H Berlin Lichterfelde 50Hertz Konventionell negative 99 493 05:October-10:October
ReserveKW Plattling TenneT DE Konventionell positive 49 490 22:October-08:October
50H OWP Wikinger 50Hertz Erneuerbar negative 104 418 08:October-12:October
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 164 410 10:October-13:October
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 101 402 08:October-12:October
50H OWP Windanker 50Hertz Erneuerbar negative 84 336 08:October-12:October
Emden 4 GT (KapRes) TenneT DE Konventionell positive 48 312 06:October-13:October
50H_AVA_CR_STW 50Hertz Erneuerbar negative 100 275 09:October-11:October
Börse Amprion Konventionell positive 151 264 06:October-08:October
BAG NWAK-Cluster 14a Schwandorf TenneT DE Erneuerbar negative 85 255 10:October-13:October
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 50 250 08:October-13:October
HKW Aalen TransnetBW Konventionell negative 29 229 00:October-13:October
Börse TransnetBW Sonstiges negative 26 225 00:October-13:October
Robert Frank 4 GT (KapRes) TenneT DE Konventionell positive 28 224 07:October-18:October
HKW BARMEN 1 Amprion Konventionell positive 25 221 06:October-15:October

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.53M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-10-06?

On 2026-10-06, estimated redispatch costs were approximately €1.77 million. This includes €0.36M for renewable curtailment compensation and €1.17M for conventional ramp-up costs.

Which power plants were most affected on 2026-10-06?

The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 6,875 MWh of positive redispatch.

What was the electricity spot price on 2026-10-06?

The EPEX Day-Ahead spot price for DE_LU ranged from 124 to 406 €/MWh with an average of 205 €/MWh.