Kirchlengern GT 1 (KapRes)

Konventionell • TenneT DE

822Total MWh
2Measures
56 MWAvg Power
0Curtailments
2Ramp-ups

Data: 2026-10-06 to 2026-10-26

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-10-26 1 8
2026-10-06 1 815

Recent Measures

DateTSODirAvg MWMWhTime
2026-10-26 TenneT DE positive 30 8 14:October-14:October
2026-10-06 TenneT DE positive 82 815 08:October-18:October

Frequently Asked Questions

What is the redispatch history of Kirchlengern GT 1 (KapRes)?

Kirchlengern GT 1 (KapRes) is a Konventionell power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 822 MWh since 2026-10-06.

Why is Kirchlengern GT 1 (KapRes) frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.