BAG NWAK-Cluster 14a Schwandorf

Erneuerbar • TenneT DE

2,905Total MWh
6Measures
95 MWAvg Power
6Curtailments
0Ramp-ups

Data: 2026-07-10 to 2026-09-23

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-09-23 1 364
2026-09-21 1 528
2026-08-15 1 1,892
2026-08-06 1 56
2026-07-14 1 0
2026-07-10 1 65

Recent Measures

DateTSODirAvg MWMWhTime
2026-09-23 TenneT DE negative 91 364 09:September-13:September
2026-09-21 TenneT DE negative 100 528 07:September-16:September
2026-08-15 TenneT DE negative 270 1,892 07:August-14:August
2026-08-06 TenneT DE negative 45 56 14:August-15:August
2026-07-14 TenneT DE negative 1 0 10:July-10:July
2026-07-10 TenneT DE negative 65 65 09:July-10:July

Frequently Asked Questions

What is the redispatch history of BAG NWAK-Cluster 14a Schwandorf?

BAG NWAK-Cluster 14a Schwandorf is a Erneuerbar power plant in the TenneT DE grid zone. It has received 6 redispatch instructions totaling 2,905 MWh since 2026-07-10.

Why is BAG NWAK-Cluster 14a Schwandorf frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.