2,856MWh Curtailed
3,156MWh Ramped Up
€0.93MEst. Cost
181 MWPeak Positive
Day-Ahead Spot: 45-186 €/MWh (avg 125)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 8 | 8,785 |
| Amprion | positive | 5 | 4,179 |
| TransnetBW | positive | 5 | 2,591 |
| TransnetBW | negative | 2 | 2,115 |
| 50Hertz | negative | 5 | 1,733 |
| Amprion | negative | 3 | 1,161 |
| TenneT DE | positive | 1 | 585 |
| 50Hertz | positive | 3 | 84 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 534 | 5,344 | 12:July-22:July |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 199 | 1,936 | 03:July-13:July |
| Börse | TransnetBW | Sonstiges | negative | 199 | 1,936 | 03:July-13:July |
| Emsland Block B | Amprion | Konventionell | positive | 222 | 1,664 | 14:July-22:July |
| Emsland Block C | Amprion | Konventionell | positive | 220 | 1,652 | 14:July-22:July |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,000 | 12:July-17:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,000 | 12:July-17:July | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 233 | 700 | 15:July-18:July |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 303 | 682 | 22:July-00:July |
| WEISWEILER_H | Amprion | Konventionell | negative | 161 | 645 | 17:July-21:July |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 78 | 585 | 14:July-21:July |
| Lippendorf | 50Hertz | Konventionell | negative | 167 | 501 | 15:July-18:July |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 500 | 12:July-17:July | |
| Emsland Block B | Amprion | Konventionell | positive | 229 | 458 | 22:July-00:July |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 133 | 400 | 15:July-18:July |
| WEISWEILER_G | Amprion | Konventionell | negative | 174 | 348 | 15:July-17:July |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 50 | 302 | 16:July-22:July |
| AVA Cluster Voslapp | TenneT DE | negative | 125 | 250 | 16:July-18:July | |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 70 | 210 | 17:July-20:July |
| Heizkraftwerk Stuttgart-Münster GT 87 | TransnetBW | Konventionell | positive | 50 | 201 | 16:July-20:July |
| Emsland Block C | Amprion | Konventionell | positive | 195 | 195 | 22:July-23:July |
| Börse | TransnetBW | Sonstiges | negative | 72 | 179 | 22:July-21:July |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 168 | 168 | 16:July-17:July |
| Börse | TransnetBW | Sonstiges | positive | 33 | 132 | 22:July-21:July |
| Lippendorf | 50Hertz | Konventionell | negative | 40 | 70 | 14:July-15:July |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 35 | 62 | 14:July-15:July |
| 50H Dresden-Reick | 50Hertz | Konventionell | positive | 46 | 46 | 16:July-17:July |
| 50H Dresden-Nossen | 50Hertz | Konventionell | positive | 32 | 32 | 16:July-17:July |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 19 | 19 | 16:July-17:July |
| Börse | TenneT DE | Sonstiges | negative | 18 | 9 | 14:July-14:July |
| Börse | 50Hertz | Sonstiges | positive | 26 | 6 | 14:July-14:July |
| BAG NWAK-Cluster 14a Schwandorf | TenneT DE | negative | 1 | 0 | 10:July-10:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.28M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-14?
On 2026-07-14, estimated redispatch costs were approximately €0.93 million. This includes €0.29M for renewable curtailment compensation and €0.49M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-14?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 5,344 MWh of negative redispatch.
What was the electricity spot price on 2026-07-14?
The EPEX Day-Ahead spot price for DE_LU ranged from 45 to 186 €/MWh with an average of 125 €/MWh.