← 2026-07-13

Tuesday, July 14, 2026

2026-07-15 →
2,856MWh Curtailed
3,156MWh Ramped Up
€0.93MEst. Cost
181 MWPeak Positive

Day-Ahead Spot: 45-186 €/MWh (avg 125)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 8 8,785
Amprion positive 5 4,179
TransnetBW positive 5 2,591
TransnetBW negative 2 2,115
50Hertz negative 5 1,733
Amprion negative 3 1,161
TenneT DE positive 1 585
50Hertz positive 3 84

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 534 5,344 12:July-22:July
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 199 1,936 03:July-13:July
Börse TransnetBW Sonstiges negative 199 1,936 03:July-13:July
Emsland Block B Amprion Konventionell positive 222 1,664 14:July-22:July
Emsland Block C Amprion Konventionell positive 220 1,652 14:July-22:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,000 12:July-17:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,000 12:July-17:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 233 700 15:July-18:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 303 682 22:July-00:July
WEISWEILER_H Amprion Konventionell negative 161 645 17:July-21:July
Hannover-Linden GuD TenneT DE Konventionell positive 78 585 14:July-21:July
Lippendorf 50Hertz Konventionell negative 167 501 15:July-18:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 500 12:July-17:July
Emsland Block B Amprion Konventionell positive 229 458 22:July-00:July
Boxberg (Standort) 50Hertz Konventionell negative 133 400 15:July-18:July
WEISWEILER_G Amprion Konventionell negative 174 348 15:July-17:July
illwerke vkw AG TransnetBW Sonstiges positive 50 302 16:July-22:July
AVA Cluster Voslapp TenneT DE Erneuerbar negative 125 250 16:July-18:July
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 70 210 17:July-20:July
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 50 201 16:July-20:July
Emsland Block C Amprion Konventionell positive 195 195 22:July-23:July
Börse TransnetBW Sonstiges negative 72 179 22:July-21:July
NIEHL-31-GUD Amprion Konventionell negative 168 168 16:July-17:July
Börse TransnetBW Sonstiges positive 33 132 22:July-21:July
Lippendorf 50Hertz Konventionell negative 40 70 14:July-15:July
50H Berlin Marzahn 50Hertz Konventionell negative 35 62 14:July-15:July
50H Dresden-Reick 50Hertz Konventionell positive 46 46 16:July-17:July
50H Dresden-Nossen 50Hertz Konventionell positive 32 32 16:July-17:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 19 19 16:July-17:July
Börse TenneT DE Sonstiges negative 18 9 14:July-14:July
Börse 50Hertz Sonstiges positive 26 6 14:July-14:July
BAG NWAK-Cluster 14a Schwandorf TenneT DE Erneuerbar negative 1 0 10:July-10:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.28M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-14?

On 2026-07-14, estimated redispatch costs were approximately €0.93 million. This includes €0.29M for renewable curtailment compensation and €0.49M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-14?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 5,344 MWh of negative redispatch.

What was the electricity spot price on 2026-07-14?

The EPEX Day-Ahead spot price for DE_LU ranged from 45 to 186 €/MWh with an average of 125 €/MWh.