← 2026-07-12

Monday, July 13, 2026

2026-07-14 →
2,830MWh Curtailed
2,892MWh Ramped Up
€0.89MEst. Cost
178 MWPeak Positive

Day-Ahead Spot: 23-195 €/MWh (avg 120)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 9 16,096
Amprion positive 8 4,274
TransnetBW positive 7 2,779
50Hertz negative 10 2,494
Amprion negative 3 1,562
TransnetBW negative 2 826
50Hertz positive 6 490
TenneT DE positive 1 157

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 562 4,498 14:July-22:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 400 3,600 07:July-16:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 350 3,150 07:July-16:July
illwerke vkw AG TransnetBW Sonstiges positive 282 2,257 14:July-22:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 250 2,250 07:July-16:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 425 1,382 22:July-01:July
Emsland Block C Amprion Konventionell positive 178 1,243 15:July-22:July
Emsland Block B Amprion Konventionell positive 163 1,138 15:July-22:July
Datteln_4 Amprion Konventionell negative 250 1,062 14:July-18:July
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 100 900 07:July-16:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 141 880 09:July-15:July
Emsland Block B Amprion Konventionell positive 229 686 22:July-01:July
Börse TransnetBW Sonstiges negative 95 665 15:July-22:July
HUCKINGEN_A Amprion Konventionell positive 80 640 14:July-22:July
50H Berlin Marzahn 50Hertz Konventionell negative 88 441 16:July-21:July
Emsland Block C Amprion Konventionell positive 195 390 22:July-00:July
Schkopau 50Hertz Konventionell negative 114 341 16:July-21:July
Kiel (Küstenkraftwerk gesamt) TenneT DE Konventionell negative 99 274 17:July-20:July
WEISWEILER_G Amprion Konventionell negative 103 258 15:July-18:July
WEISWEILER_G Amprion Konventionell negative 61 242 17:July-22:July
50H Berlin Marzahn 50Hertz Konventionell negative 40 202 05:July-10:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 67 185 15:July-20:July
Ahrensfelde B (KapRes) 50Hertz Konventionell positive 10 173 05:July-22:July
Ahrensfelde A (KapRes) 50Hertz Konventionell positive 10 173 05:July-22:July
Börse TransnetBW Sonstiges negative 34 160 23:July-21:July
50H PV Bartow 50Hertz Erneuerbar negative 22 158 07:July-14:July
SW München KW-Pool TenneT DE Sonstiges positive 126 157 22:July-23:July
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 46 148 18:July-22:July
NIEHL-31-GUD Amprion Konventionell positive 137 137 15:July-16:July
Börse TransnetBW Sonstiges positive 131 131 14:July-15:July
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 58 117 22:July-00:July
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 20 95 10:July-15:July
Lippendorf 50Hertz Konventionell negative 11 90 08:July-22:July
Börse TransnetBW Sonstiges positive 26 84 22:July-20:July
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 42 62 15:July-16:July
Ahrensfelde D (KapRes) 50Hertz Konventionell positive 21 52 06:July-09:July
Ahrensfelde C (KapRes) 50Hertz Konventionell positive 21 52 06:July-09:July
Lippendorf 50Hertz Konventionell negative 10 40 22:July-02:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 19 38 22:July-00:July
Eltmann TenneT DE Konventionell negative 22 22 16:July-17:July
WALSUM_10 Amprion Konventionell positive 20 20 16:July-17:July
KMW_KW5 Amprion Konventionell positive 10 20 19:July-21:July
UW Dörpen-West TenneT DE Erneuerbar negative 20 20 19:July-20:July
Ahrensfelde A (KapRes) 50Hertz Konventionell positive 5 20 22:July-02:July
Ahrensfelde B (KapRes) 50Hertz Konventionell positive 5 20 22:July-02:July
HKW Aalen TransnetBW Konventionell positive 3 3 22:July-23:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.27M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-13?

On 2026-07-13, estimated redispatch costs were approximately €0.89 million. This includes €0.28M for renewable curtailment compensation and €0.43M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-13?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 4,498 MWh of negative redispatch.

What was the electricity spot price on 2026-07-13?

The EPEX Day-Ahead spot price for DE_LU ranged from 23 to 195 €/MWh with an average of 120 €/MWh.