2,830MWh Curtailed
2,892MWh Ramped Up
€0.89MEst. Cost
178 MWPeak Positive
Day-Ahead Spot: 23-195 €/MWh (avg 120)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 9 | 16,096 |
| Amprion | positive | 8 | 4,274 |
| TransnetBW | positive | 7 | 2,779 |
| 50Hertz | negative | 10 | 2,494 |
| Amprion | negative | 3 | 1,562 |
| TransnetBW | negative | 2 | 826 |
| 50Hertz | positive | 6 | 490 |
| TenneT DE | positive | 1 | 157 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 562 | 4,498 | 14:July-22:July |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 400 | 3,600 | 07:July-16:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 350 | 3,150 | 07:July-16:July | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 282 | 2,257 | 14:July-22:July |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 250 | 2,250 | 07:July-16:July | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 425 | 1,382 | 22:July-01:July |
| Emsland Block C | Amprion | Konventionell | positive | 178 | 1,243 | 15:July-22:July |
| Emsland Block B | Amprion | Konventionell | positive | 163 | 1,138 | 15:July-22:July |
| Datteln_4 | Amprion | Konventionell | negative | 250 | 1,062 | 14:July-18:July |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 100 | 900 | 07:July-16:July | |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 141 | 880 | 09:July-15:July | |
| Emsland Block B | Amprion | Konventionell | positive | 229 | 686 | 22:July-01:July |
| Börse | TransnetBW | Sonstiges | negative | 95 | 665 | 15:July-22:July |
| HUCKINGEN_A | Amprion | Konventionell | positive | 80 | 640 | 14:July-22:July |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 88 | 441 | 16:July-21:July |
| Emsland Block C | Amprion | Konventionell | positive | 195 | 390 | 22:July-00:July |
| Schkopau | 50Hertz | Konventionell | negative | 114 | 341 | 16:July-21:July |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 99 | 274 | 17:July-20:July |
| WEISWEILER_G | Amprion | Konventionell | negative | 103 | 258 | 15:July-18:July |
| WEISWEILER_G | Amprion | Konventionell | negative | 61 | 242 | 17:July-22:July |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 40 | 202 | 05:July-10:July |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 67 | 185 | 15:July-20:July |
| Ahrensfelde B (KapRes) | 50Hertz | Konventionell | positive | 10 | 173 | 05:July-22:July |
| Ahrensfelde A (KapRes) | 50Hertz | Konventionell | positive | 10 | 173 | 05:July-22:July |
| Börse | TransnetBW | Sonstiges | negative | 34 | 160 | 23:July-21:July |
| 50H PV Bartow | 50Hertz | negative | 22 | 158 | 07:July-14:July | |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 126 | 157 | 22:July-23:July |
| Heizkraftwerk Stuttgart-Münster GT 88 | TransnetBW | Konventionell | positive | 46 | 148 | 18:July-22:July |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 137 | 137 | 15:July-16:July |
| Börse | TransnetBW | Sonstiges | positive | 131 | 131 | 14:July-15:July |
| Heizkraftwerk Stuttgart-Münster GT 88 | TransnetBW | Konventionell | positive | 58 | 117 | 22:July-00:July |
| 50H_EDIS_CR_HND | 50Hertz | negative | 20 | 95 | 10:July-15:July | |
| Lippendorf | 50Hertz | Konventionell | negative | 11 | 90 | 08:July-22:July |
| Börse | TransnetBW | Sonstiges | positive | 26 | 84 | 22:July-20:July |
| 50H_WEMA_CR_PMS | 50Hertz | negative | 42 | 62 | 15:July-16:July | |
| Ahrensfelde D (KapRes) | 50Hertz | Konventionell | positive | 21 | 52 | 06:July-09:July |
| Ahrensfelde C (KapRes) | 50Hertz | Konventionell | positive | 21 | 52 | 06:July-09:July |
| Lippendorf | 50Hertz | Konventionell | negative | 10 | 40 | 22:July-02:July |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 19 | 38 | 22:July-00:July |
| Eltmann | TenneT DE | Konventionell | negative | 22 | 22 | 16:July-17:July |
| WALSUM_10 | Amprion | Konventionell | positive | 20 | 20 | 16:July-17:July |
| KMW_KW5 | Amprion | Konventionell | positive | 10 | 20 | 19:July-21:July |
| UW Dörpen-West | TenneT DE | negative | 20 | 20 | 19:July-20:July | |
| Ahrensfelde A (KapRes) | 50Hertz | Konventionell | positive | 5 | 20 | 22:July-02:July |
| Ahrensfelde B (KapRes) | 50Hertz | Konventionell | positive | 5 | 20 | 22:July-02:July |
| HKW Aalen | TransnetBW | Konventionell | positive | 3 | 3 | 22:July-23:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.27M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-13?
On 2026-07-13, estimated redispatch costs were approximately €0.89 million. This includes €0.28M for renewable curtailment compensation and €0.43M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-13?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 4,498 MWh of negative redispatch.
What was the electricity spot price on 2026-07-13?
The EPEX Day-Ahead spot price for DE_LU ranged from 23 to 195 €/MWh with an average of 120 €/MWh.