1,858MWh Curtailed
1,827MWh Ramped Up
€0.62MEst. Cost
150 MWPeak Positive
Day-Ahead Spot: -12-150 €/MWh (avg 75)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 5 | 10,350 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 400 | 3,600 | 07:July-16:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 350 | 3,150 | 07:July-16:July | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 200 | 1,800 | 07:July-16:July | |
| BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim | TenneT DE | negative | 100 | 900 | 07:July-16:July | |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 100 | 900 | 07:July-16:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-12?
On 2026-07-12, estimated redispatch costs were approximately €0.62 million. This includes €0.19M for renewable curtailment compensation and €0.19M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-12?
The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 3,600 MWh of negative redispatch.
What was the electricity spot price on 2026-07-12?
The EPEX Day-Ahead spot price for DE_LU ranged from -12 to 150 €/MWh with an average of 75 €/MWh.