← 2026-07-10

Saturday, July 11, 2026

2026-07-12 →
2,291MWh Curtailed
2,222MWh Ramped Up
€0.71MEst. Cost
160 MWPeak Positive

Day-Ahead Spot: -1-160 €/MWh (avg 94)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 6 11,100
50Hertz negative 5 1,241

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,700 07:July-16:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 300 2,700 07:July-16:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 300 2,700 07:July-16:July
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 1,400 07:July-14:July
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 100 900 07:July-16:July
BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim TenneT DE Erneuerbar negative 100 700 07:July-14:July
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 250 438 07:July-09:July
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 221 388 07:July-09:July
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 60 165 09:July-12:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 93 162 08:July-09:July
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 50 88 10:July-12:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-11?

On 2026-07-11, estimated redispatch costs were approximately €0.71 million. This includes €0.23M for renewable curtailment compensation and €0.28M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-11?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,700 MWh of negative redispatch.

What was the electricity spot price on 2026-07-11?

The EPEX Day-Ahead spot price for DE_LU ranged from -1 to 160 €/MWh with an average of 94 €/MWh.