← 2026-07-09

Friday, July 10, 2026

2026-07-11 →
2,739MWh Curtailed
2,954MWh Ramped Up
€0.97MEst. Cost
175 MWPeak Positive

Day-Ahead Spot: 30-195 €/MWh (avg 124)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 9 12,940
50Hertz negative 24 6,715
Amprion positive 7 3,343
50Hertz positive 1 2,100
Amprion negative 2 871
TenneT DE positive 4 535
TransnetBW positive 4 183
TransnetBW negative 2 115

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 324 2,750 07:July-16:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 324 2,750 07:July-16:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 274 2,325 07:July-16:July
Börse 50Hertz Sonstiges positive 300 2,100 23:July-06:July
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 1,300 07:July-14:July
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 150 1,275 07:July-16:July
Emsland Block C Amprion Konventionell positive 147 1,172 12:July-20:July
LAUSWARD_GUDF Amprion Konventionell positive 358 1,075 07:July-10:July
Notfall-RD mit BAG TenneT DE Erneuerbar negative 150 975 09:July-16:July
Boxberg (Standort) 50Hertz Konventionell negative 315 944 07:July-10:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 139 938 09:July-16:July
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 100 850 07:July-16:July
Lippendorf 50Hertz Konventionell negative 325 812 06:July-09:July
HAMMUENTROP_20 Amprion Konventionell positive 264 661 07:July-10:July
BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim TenneT DE Erneuerbar negative 100 650 07:July-14:July
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 114 568 08:July-13:July
WEISWEILER_H Amprion Konventionell negative 98 468 15:July-20:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 121 425 09:July-13:July
WEISWEILER_G Amprion Konventionell negative 85 403 15:July-20:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 200 400 07:July-09:July
50H PV Bartow 50Hertz Erneuerbar negative 85 382 08:July-16:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 332 332 09:July-10:July
GUD_HERNE_6 Amprion Konventionell positive 210 262 07:July-09:July
Braunschweig HKWM GT31 TenneT DE Konventionell positive 53 251 05:July-10:July
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 48 240 08:July-13:July
Jänschwalde (Standort) 50Hertz Konventionell negative 120 240 07:July-09:July
Boxberg (Standort) 50Hertz Konventionell negative 102 228 05:July-08:July
50H Berlin Marzahn 50Hertz Konventionell negative 56 225 06:July-10:July
Braunschweig GT TenneT DE Konventionell positive 39 183 06:July-10:July
Lippendorf 50Hertz Konventionell negative 122 183 14:July-15:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 131 163 08:July-09:July
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 50 150 11:July-14:July
50H_EDIS_CR_WU_SUED 50Hertz Erneuerbar negative 50 138 10:July-13:July
50H PV Witznitz 50Hertz Erneuerbar negative 161 121 09:July-10:July
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell negative 67 100 18:July-20:July
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 50 100 06:July-08:July
Hannover-Linden GuD TenneT DE Konventionell positive 35 88 07:July-10:July
Jänschwalde (Standort) 50Hertz Konventionell negative 67 84 07:July-09:July
illwerke vkw AG TransnetBW Sonstiges positive 109 82 07:July-07:July
BAG NWAK-Cluster 14a Schwandorf TenneT DE Erneuerbar negative 65 65 09:July-10:July
Börse Amprion Konventionell positive 46 58 14:July-16:July
illwerke vkw AG TransnetBW Sonstiges positive 20 50 06:July-09:July
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 25 44 09:July-10:July
50H Dresden-Nossen 50Hertz Konventionell negative 32 32 08:July-09:July
Börse TransnetBW Sonstiges positive 13 28 06:July-20:July
50H Berlin Marzahn 50Hertz Konventionell negative 28 28 09:July-10:July
HKW Aalen TransnetBW Konventionell positive 18 23 09:July-10:July
Lippendorf 50Hertz Konventionell negative 21 21 08:July-09:July
Börse TransnetBW Sonstiges negative 10 15 05:July-10:July
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell positive 15 15 14:July-15:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-10?

On 2026-07-10, estimated redispatch costs were approximately €0.97 million. This includes €0.27M for renewable curtailment compensation and €0.45M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-10?

The most affected plant was BAG NWAK-Cluster 17 Altheim (TenneT DE) with 2,750 MWh of negative redispatch.

What was the electricity spot price on 2026-07-10?

The EPEX Day-Ahead spot price for DE_LU ranged from 30 to 195 €/MWh with an average of 124 €/MWh.