← 2026-07-08

Thursday, July 9, 2026

2026-07-10 →
2,667MWh Curtailed
3,317MWh Ramped Up
€1.06MEst. Cost
278 MWPeak Positive

Day-Ahead Spot: 25-235 €/MWh (avg 125)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 7 9,549
50Hertz negative 17 5,908
Amprion positive 4 2,371
TenneT DE positive 3 326
Amprion negative 11 105

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 375 3,000 08:July-16:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 375 3,000 08:July-16:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 256 1,725 09:July-16:July
LAUSWARD_GUDF Amprion Konventionell positive 355 1,243 07:July-11:July
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 150 1,200 08:July-16:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 1,200 08:July-16:July
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 1,000 08:July-13:July
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 218 925 09:July-13:July
HAMMUENTROP_20 Amprion Konventionell positive 229 743 07:July-11:July
Lippendorf 50Hertz Konventionell negative 234 586 07:July-10:July
Jänschwalde (Standort) 50Hertz Konventionell negative 117 408 07:July-11:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 194 388 08:July-10:July
WEISWEILER_H Amprion Konventionell positive 124 371 07:July-10:July
Boxberg (Standort) 50Hertz Konventionell negative 170 339 08:July-10:July
50H_EDIS_CR_WU_SUED 50Hertz Erneuerbar negative 92 300 10:July-13:July
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 65 292 09:July-14:July
50H Berlin Marzahn 50Hertz Konventionell negative 69 206 07:July-10:July
Jänschwalde (Standort) 50Hertz Konventionell negative 98 196 08:July-10:July
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 68 188 10:July-13:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 68 152 08:July-10:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 91 137 08:July-10:July
50H PV Bartow 50Hertz Erneuerbar negative 82 124 07:July-10:July
UW Büttel TenneT DE Erneuerbar negative 149 112 10:July-10:July
50H PV Witznitz 50Hertz Erneuerbar negative 133 100 10:July-10:July
Datteln_4 Amprion Konventionell negative 94 94 10:July-11:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 64 64 07:July-09:July
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 50 38 13:July-14:July
UW Büttel TenneT DE Erneuerbar negative 38 38 08:July-09:July
Emden 4 GT (KapRes) TenneT DE Konventionell positive 38 38 08:July-09:July
50H Dresden-Reick 50Hertz Konventionell negative 11 22 08:July-10:July
Börse Amprion Konventionell positive 56 14 09:July-09:July
50H BASF Schwarzheide 50Hertz Konventionell negative 4 7 08:July-10:July
PV_A44_BEDBURG_WEST1 Amprion Erneuerbar negative 6 2 09:July-09:July
PV_A44_JUECHEN_NORD_OST_1 Amprion Erneuerbar negative 7 2 09:July-09:July
PV_BEDBURG_A Amprion Erneuerbar negative 7 2 09:July-09:July
PV_HAMBACH_I4 Amprion Erneuerbar negative 9 2 09:July-09:July
PV_A44_JUECHEN_MITTE_WE_2 Amprion Erneuerbar negative 4 1 09:July-09:July
PV_HAMBACH_I4_EXT Amprion Erneuerbar negative 5 1 09:July-09:July
PV_HAMBACH_NIEDERZIER Amprion Erneuerbar negative 5 1 09:July-09:July
PV_AGRI_BEDBURG Amprion Erneuerbar negative 1 0 09:July-09:July
WP_BEDBURG A44N Amprion Erneuerbar negative 0 0 09:July-09:July
WP_BERGHEIM-WIEDENFE Amprion Erneuerbar negative 0 0 09:July-09:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-09?

On 2026-07-09, estimated redispatch costs were approximately €1.06 million. This includes €0.27M for renewable curtailment compensation and €0.51M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-09?

The most affected plant was BAG NWAK-Cluster 16 Regensburg-Sittling (TenneT DE) with 3,000 MWh of negative redispatch.

What was the electricity spot price on 2026-07-09?

The EPEX Day-Ahead spot price for DE_LU ranged from 25 to 235 €/MWh with an average of 125 €/MWh.