2,667MWh Curtailed
3,317MWh Ramped Up
€1.06MEst. Cost
278 MWPeak Positive
Day-Ahead Spot: 25-235 €/MWh (avg 125)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 7 | 9,549 |
| 50Hertz | negative | 17 | 5,908 |
| Amprion | positive | 4 | 2,371 |
| TenneT DE | positive | 3 | 326 |
| Amprion | negative | 11 | 105 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 375 | 3,000 | 08:July-16:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 375 | 3,000 | 08:July-16:July | |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 256 | 1,725 | 09:July-16:July | |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 355 | 1,243 | 07:July-11:July |
| BAG NWAK-Cluster 13 Etzenricht | TenneT DE | negative | 150 | 1,200 | 08:July-16:July | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 1,200 | 08:July-16:July | |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 200 | 1,000 | 08:July-13:July | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 218 | 925 | 09:July-13:July | |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 229 | 743 | 07:July-11:July |
| Lippendorf | 50Hertz | Konventionell | negative | 234 | 586 | 07:July-10:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 117 | 408 | 07:July-11:July |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 194 | 388 | 08:July-10:July |
| WEISWEILER_H | Amprion | Konventionell | positive | 124 | 371 | 07:July-10:July |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 170 | 339 | 08:July-10:July |
| 50H_EDIS_CR_WU_SUED | 50Hertz | negative | 92 | 300 | 10:July-13:July | |
| 50H_EDIS_CR_HND | 50Hertz | negative | 65 | 292 | 09:July-14:July | |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 69 | 206 | 07:July-10:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 98 | 196 | 08:July-10:July |
| 50H_AVA_CR_FOE | 50Hertz | negative | 68 | 188 | 10:July-13:July | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 68 | 152 | 08:July-10:July |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 91 | 137 | 08:July-10:July |
| 50H PV Bartow | 50Hertz | negative | 82 | 124 | 07:July-10:July | |
| UW Büttel | TenneT DE | negative | 149 | 112 | 10:July-10:July | |
| 50H PV Witznitz | 50Hertz | negative | 133 | 100 | 10:July-10:July | |
| Datteln_4 | Amprion | Konventionell | negative | 94 | 94 | 10:July-11:July |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 64 | 64 | 07:July-09:July |
| 50H_WEMA_CR_GOE | 50Hertz | negative | 50 | 38 | 13:July-14:July | |
| UW Büttel | TenneT DE | negative | 38 | 38 | 08:July-09:July | |
| Emden 4 GT (KapRes) | TenneT DE | Konventionell | positive | 38 | 38 | 08:July-09:July |
| 50H Dresden-Reick | 50Hertz | Konventionell | negative | 11 | 22 | 08:July-10:July |
| Börse | Amprion | Konventionell | positive | 56 | 14 | 09:July-09:July |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 4 | 7 | 08:July-10:July |
| PV_A44_BEDBURG_WEST1 | Amprion | negative | 6 | 2 | 09:July-09:July | |
| PV_A44_JUECHEN_NORD_OST_1 | Amprion | negative | 7 | 2 | 09:July-09:July | |
| PV_BEDBURG_A | Amprion | negative | 7 | 2 | 09:July-09:July | |
| PV_HAMBACH_I4 | Amprion | negative | 9 | 2 | 09:July-09:July | |
| PV_A44_JUECHEN_MITTE_WE_2 | Amprion | negative | 4 | 1 | 09:July-09:July | |
| PV_HAMBACH_I4_EXT | Amprion | negative | 5 | 1 | 09:July-09:July | |
| PV_HAMBACH_NIEDERZIER | Amprion | negative | 5 | 1 | 09:July-09:July | |
| PV_AGRI_BEDBURG | Amprion | negative | 1 | 0 | 09:July-09:July | |
| WP_BEDBURG A44N | Amprion | negative | 0 | 0 | 09:July-09:July | |
| WP_BERGHEIM-WIEDENFE | Amprion | negative | 0 | 0 | 09:July-09:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-09?
On 2026-07-09, estimated redispatch costs were approximately €1.06 million. This includes €0.27M for renewable curtailment compensation and €0.51M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-09?
The most affected plant was BAG NWAK-Cluster 16 Regensburg-Sittling (TenneT DE) with 3,000 MWh of negative redispatch.
What was the electricity spot price on 2026-07-09?
The EPEX Day-Ahead spot price for DE_LU ranged from 25 to 235 €/MWh with an average of 125 €/MWh.