← 2026-09-22

Wednesday, September 23, 2026

2026-09-24 →
3,566MWh Curtailed
4,128MWh Ramped Up
€1.33MEst. Cost
287 MWPeak Positive

Day-Ahead Spot: 42-385 €/MWh (avg 176)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 25 57,710
Amprion positive 26 49,879
50Hertz negative 26 25,220
TenneT DE positive 12 14,327
TransnetBW positive 9 11,530
Amprion negative 4 4,696
50Hertz positive 5 663
TransnetBW negative 1 327

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Dörpen-West TenneT DE Erneuerbar negative 1899 11,393 22:September-04:September
UW Dörpen-West TenneT DE Erneuerbar negative 1342 10,062 14:September-22:September
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 480 7,680 22:September-14:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 438 7,000 22:September-14:September
UW Diele TenneT DE Erneuerbar negative 1085 6,507 22:September-04:September
WEISWEILER_H Amprion Konventionell positive 460 5,983 22:September-11:September
WEISWEILER_G Amprion Konventionell positive 454 5,901 22:September-11:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 484 5,323 22:September-09:September
AVA Cluster Voslapp TenneT DE Erneuerbar negative 308 5,312 23:September-16:September
UW Emden-Ost TenneT DE Erneuerbar negative 780 4,683 22:September-04:September
Boxberg (Standort) 50Hertz Konventionell negative 418 4,596 22:September-15:September
UW Diele TenneT DE Erneuerbar negative 609 4,263 15:September-22:September
Börse TenneT DE Sonstiges positive 1064 4,256 18:September-22:September
KNAPSACK_20 Amprion Konventionell positive 322 4,182 22:September-11:September
Börse TenneT DE Sonstiges positive 906 4,075 22:September-16:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 446 4,015 13:September-22:September
WALSUM_10 Amprion Konventionell positive 324 3,645 22:September-15:September
WEISWEILER_H Amprion Konventionell positive 240 3,600 07:September-22:September
WEISWEILER_G Amprion Konventionell positive 236 3,364 07:September-22:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 288 3,170 22:September-09:September
Jänschwalde (Standort) 50Hertz Konventionell negative 265 2,913 23:September-15:September
Emsland Block D Amprion Konventionell positive 359 2,516 22:September-05:September
NIEHL-31-GUD Amprion Konventionell positive 187 2,475 22:September-14:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 198 2,375 22:September-10:September
NEURATH_F Amprion Konventionell negative 270 2,090 08:September-16:September
GERSTEINW_F (KapRes) Amprion Konventionell positive 241 1,810 22:September-05:September
Rostock Kohlekraftwerk 50Hertz Konventionell negative 189 1,700 22:September-07:September
SHN Cluster Baltic Cable TenneT DE Erneuerbar negative 119 1,691 23:September-14:September
Lippendorf 50Hertz Konventionell negative 277 1,662 22:September-08:September
ReserveKW Staudinger 4 TenneT DE Konventionell positive 303 1,592 22:September-03:September
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,500 08:September-16:September
KMW_KW3 Amprion Konventionell positive 346 1,469 22:September-02:September
GERSTEINW_F (KapRes) Amprion Konventionell positive 164 1,392 12:September-21:September
NEURATH_G Amprion Konventionell negative 224 1,344 10:September-16:September
Emsland Block B Amprion Konventionell positive 168 1,259 14:September-22:September
Lippendorf 50Hertz Konventionell negative 232 1,162 04:September-09:September
UW Emden-Ost TenneT DE Erneuerbar negative 198 1,140 16:September-22:September
NEURATH_F Amprion Konventionell negative 263 1,120 09:September-13:September
ReserveKW Staudinger 4 TenneT DE Konventionell positive 153 1,108 14:September-22:September
Irsching 4 TenneT DE Konventionell positive 298 1,041 22:September-01:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 519 1,038 08:September-10:September
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 183 962 08:September-13:September
Boxberg (Standort) 50Hertz Konventionell negative 314 941 07:September-10:September
ReserveKW Staudinger 4 TenneT DE Konventionell positive 177 886 17:September-22:September
UW Emden-Ost TenneT DE Erneuerbar negative 378 851 19:September-22:September
Emsland Block B Amprion Konventionell positive 210 840 22:September-02:September
50H Berlin Mitte 50Hertz Konventionell negative 76 764 22:September-15:September
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 227 738 08:September-11:September
KNAPSACK_20 Amprion Konventionell positive 225 730 07:September-10:September
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 157 706 23:September-03:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.4M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-23?

On 2026-09-23, estimated redispatch costs were approximately €1.33 million. This includes €0.36M for renewable curtailment compensation and €0.85M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-23?

The most affected plant was UW Dörpen-West (TenneT DE) with 11,393 MWh of negative redispatch.

What was the electricity spot price on 2026-09-23?

The EPEX Day-Ahead spot price for DE_LU ranged from 42 to 385 €/MWh with an average of 176 €/MWh.