3,566MWh Curtailed
4,128MWh Ramped Up
€1.33MEst. Cost
287 MWPeak Positive
Day-Ahead Spot: 42-385 €/MWh (avg 176)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 25 | 57,710 |
| Amprion | positive | 26 | 49,879 |
| 50Hertz | negative | 26 | 25,220 |
| TenneT DE | positive | 12 | 14,327 |
| TransnetBW | positive | 9 | 11,530 |
| Amprion | negative | 4 | 4,696 |
| 50Hertz | positive | 5 | 663 |
| TransnetBW | negative | 1 | 327 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Dörpen-West | TenneT DE | negative | 1899 | 11,393 | 22:September-04:September | |
| UW Dörpen-West | TenneT DE | negative | 1342 | 10,062 | 14:September-22:September | |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 480 | 7,680 | 22:September-14:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 438 | 7,000 | 22:September-14:September |
| UW Diele | TenneT DE | negative | 1085 | 6,507 | 22:September-04:September | |
| WEISWEILER_H | Amprion | Konventionell | positive | 460 | 5,983 | 22:September-11:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 454 | 5,901 | 22:September-11:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 484 | 5,323 | 22:September-09:September |
| AVA Cluster Voslapp | TenneT DE | negative | 308 | 5,312 | 23:September-16:September | |
| UW Emden-Ost | TenneT DE | negative | 780 | 4,683 | 22:September-04:September | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 418 | 4,596 | 22:September-15:September |
| UW Diele | TenneT DE | negative | 609 | 4,263 | 15:September-22:September | |
| Börse | TenneT DE | Sonstiges | positive | 1064 | 4,256 | 18:September-22:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 322 | 4,182 | 22:September-11:September |
| Börse | TenneT DE | Sonstiges | positive | 906 | 4,075 | 22:September-16:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 446 | 4,015 | 13:September-22:September |
| WALSUM_10 | Amprion | Konventionell | positive | 324 | 3,645 | 22:September-15:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 240 | 3,600 | 07:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 236 | 3,364 | 07:September-22:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 288 | 3,170 | 22:September-09:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 265 | 2,913 | 23:September-15:September |
| Emsland Block D | Amprion | Konventionell | positive | 359 | 2,516 | 22:September-05:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 187 | 2,475 | 22:September-14:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 198 | 2,375 | 22:September-10:September |
| NEURATH_F | Amprion | Konventionell | negative | 270 | 2,090 | 08:September-16:September |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 241 | 1,810 | 22:September-05:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 189 | 1,700 | 22:September-07:September |
| SHN Cluster Baltic Cable | TenneT DE | negative | 119 | 1,691 | 23:September-14:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 277 | 1,662 | 22:September-08:September |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 303 | 1,592 | 22:September-03:September |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,500 | 08:September-16:September | |
| KMW_KW3 | Amprion | Konventionell | positive | 346 | 1,469 | 22:September-02:September |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 164 | 1,392 | 12:September-21:September |
| NEURATH_G | Amprion | Konventionell | negative | 224 | 1,344 | 10:September-16:September |
| Emsland Block B | Amprion | Konventionell | positive | 168 | 1,259 | 14:September-22:September |
| Lippendorf | 50Hertz | Konventionell | negative | 232 | 1,162 | 04:September-09:September |
| UW Emden-Ost | TenneT DE | negative | 198 | 1,140 | 16:September-22:September | |
| NEURATH_F | Amprion | Konventionell | negative | 263 | 1,120 | 09:September-13:September |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 153 | 1,108 | 14:September-22:September |
| Irsching 4 | TenneT DE | Konventionell | positive | 298 | 1,041 | 22:September-01:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 519 | 1,038 | 08:September-10:September |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 183 | 962 | 08:September-13:September | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 314 | 941 | 07:September-10:September |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 177 | 886 | 17:September-22:September |
| UW Emden-Ost | TenneT DE | negative | 378 | 851 | 19:September-22:September | |
| Emsland Block B | Amprion | Konventionell | positive | 210 | 840 | 22:September-02:September |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 76 | 764 | 22:September-15:September |
| 50H_AVA_CR_WOL | 50Hertz | negative | 227 | 738 | 08:September-11:September | |
| KNAPSACK_20 | Amprion | Konventionell | positive | 225 | 730 | 07:September-10:September |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 157 | 706 | 23:September-03:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.4M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-23?
On 2026-09-23, estimated redispatch costs were approximately €1.33 million. This includes €0.36M for renewable curtailment compensation and €0.85M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-23?
The most affected plant was UW Dörpen-West (TenneT DE) with 11,393 MWh of negative redispatch.
What was the electricity spot price on 2026-09-23?
The EPEX Day-Ahead spot price for DE_LU ranged from 42 to 385 €/MWh with an average of 176 €/MWh.