SHN Cluster Baltic Cable

Erneuerbar • TenneT DE

9,186Total MWh
6Measures
114 MWAvg Power
6Curtailments
0Ramp-ups

Data: 2026-09-17 to 2026-09-23

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-09-23 1 1,691
2026-09-20 2 6,561
2026-09-19 1 747
2026-09-18 1 123
2026-09-17 1 63

Recent Measures

DateTSODirAvg MWMWhTime
2026-09-23 TenneT DE negative 119 1,691 23:September-14:September
2026-09-20 TenneT DE negative 216 3,835 22:September-15:September
2026-09-20 TenneT DE negative 191 2,726 07:September-22:September
2026-09-19 TenneT DE negative 100 747 07:September-15:September
2026-09-18 TenneT DE negative 33 123 09:September-13:September
2026-09-17 TenneT DE negative 23 63 10:September-13:September

Frequently Asked Questions

What is the redispatch history of SHN Cluster Baltic Cable?

SHN Cluster Baltic Cable is a Erneuerbar power plant in the TenneT DE grid zone. It has received 6 redispatch instructions totaling 9,186 MWh since 2026-09-17.

Why is SHN Cluster Baltic Cable frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.