SHN Cluster Baltic Cable
9,186Total MWh
6Measures
114 MWAvg Power
6Curtailments
0Ramp-ups
Data: 2026-09-17 to 2026-09-23
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-09-23 | 1 | 1,691 |
| 2026-09-20 | 2 | 6,561 |
| 2026-09-19 | 1 | 747 |
| 2026-09-18 | 1 | 123 |
| 2026-09-17 | 1 | 63 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-09-23 | TenneT DE | negative | 119 | 1,691 | 23:September-14:September |
| 2026-09-20 | TenneT DE | negative | 216 | 3,835 | 22:September-15:September |
| 2026-09-20 | TenneT DE | negative | 191 | 2,726 | 07:September-22:September |
| 2026-09-19 | TenneT DE | negative | 100 | 747 | 07:September-15:September |
| 2026-09-18 | TenneT DE | negative | 33 | 123 | 09:September-13:September |
| 2026-09-17 | TenneT DE | negative | 23 | 63 | 10:September-13:September |
Frequently Asked Questions
What is the redispatch history of SHN Cluster Baltic Cable?
SHN Cluster Baltic Cable is a Erneuerbar power plant in the TenneT DE grid zone. It has received 6 redispatch instructions totaling 9,186 MWh since 2026-09-17.
Why is SHN Cluster Baltic Cable frequently redispatched?
Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.