3,224MWh Curtailed
3,147MWh Ramped Up
€1.12MEst. Cost
246 MWPeak Positive
Day-Ahead Spot: 14-242 €/MWh (avg 128)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | negative | 5 | 3,790 |
| Amprion | positive | 2 | 3,452 |
| TenneT DE | positive | 2 | 3,432 |
| TenneT DE | negative | 7 | 1,091 |
| 50Hertz | negative | 6 | 846 |
| TransnetBW | positive | 1 | 640 |
| 50Hertz | positive | 1 | 5 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Emsland Block D | Amprion | Konventionell | positive | 353 | 2,822 | 00:October-08:October |
| Irsching 4 | TenneT DE | Konventionell | positive | 266 | 2,126 | 14:October-22:October |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 298 | 2,084 | 15:October-22:October |
| Irsching 4 | TenneT DE | Konventionell | positive | 307 | 1,306 | 22:October-02:October |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 222 | 1,000 | 22:October-02:October |
| Grosskraftwerk Mannheim Block 6 | TransnetBW | Konventionell | positive | 40 | 640 | 00:October-16:October |
| Emsland Block B | Amprion | Konventionell | positive | 210 | 630 | 00:October-03:October |
| AVA Cluster Helmstedt | TenneT DE | negative | 150 | 412 | 12:October-15:October | |
| SHN Cluster Süderdonn T412 T413 | TenneT DE | negative | 120 | 300 | 05:October-08:October | |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 79 | 296 | 22:October-01:October |
| AVA Cluster Conneforde | TenneT DE | negative | 178 | 267 | 04:October-06:October | |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 120 | 239 | 05:October-07:October |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 134 | 235 | 07:October-08:October |
| 50H Dresden-Reick | 50Hertz | Konventionell | negative | 44 | 220 | 03:October-08:October |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 58 | 175 | 04:October-07:October |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 152 | 152 | 04:October-05:October |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 50 | 112 | 11:October-14:October | |
| SHN Cluster Baltic Cable | TenneT DE | negative | 69 | 87 | 07:October-08:October | |
| 50H Dresden-Nossen | 50Hertz | Konventionell | negative | 21 | 64 | 03:October-06:October |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 59 | 59 | 04:October-05:October |
| UW Diele | TenneT DE | negative | 1 | 8 | 04:October-13:October | |
| UW Dörpen-West | TenneT DE | negative | 1 | 8 | 04:October-13:October | |
| UW Emden-Ost | TenneT DE | negative | 1 | 8 | 04:October-13:October | |
| 50H Dresden-Reick | 50Hertz | Konventionell | positive | 5 | 5 | 08:October-09:October |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.34M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-10-11?
On 2026-10-11, estimated redispatch costs were approximately €1.12 million. This includes €0.32M for renewable curtailment compensation and €0.5M for conventional ramp-up costs.
Which power plants were most affected on 2026-10-11?
The most affected plant was Emsland Block D (Amprion) with 2,822 MWh of positive redispatch.
What was the electricity spot price on 2026-10-11?
The EPEX Day-Ahead spot price for DE_LU ranged from 14 to 242 €/MWh with an average of 128 €/MWh.