AVA Cluster Conneforde

Erneuerbar • TenneT DE

1,593Total MWh
1Measures
319 MWAvg Power
1Curtailments
0Ramp-ups

Data: 2026-08-26 to 2026-08-26

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-08-26 1 1,593

Recent Measures

DateTSODirAvg MWMWhTime
2026-08-26 TenneT DE negative 319 1,593 10:August-15:August

Frequently Asked Questions

What is the redispatch history of AVA Cluster Conneforde?

AVA Cluster Conneforde is a Erneuerbar power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 1,593 MWh since 2026-08-26.

Why is AVA Cluster Conneforde frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.