4,298MWh Curtailed
4,967MWh Ramped Up
€1.73MEst. Cost
280 MWPeak Positive
Day-Ahead Spot: 122-250 €/MWh (avg 196)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 37 | 116,334 |
| Amprion | positive | 39 | 69,202 |
| 50Hertz | negative | 34 | 64,303 |
| TransnetBW | positive | 18 | 45,802 |
| TenneT DE | positive | 25 | 45,645 |
| Amprion | negative | 18 | 18,579 |
| TransnetBW | negative | 1 | 101 |
| 50Hertz | positive | 1 | 29 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 1063 | 22,326 | 02:November-23:November |
| UW Dörpen-West | TenneT DE | negative | 1162 | 20,910 | 05:November-23:November | |
| UW Büttel | TenneT DE | negative | 910 | 16,373 | 05:November-23:November | |
| Wilhelmshaven | TenneT DE | Konventionell | negative | 631 | 15,152 | 23:November-23:November |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 510 | 12,250 | 23:November-23:November |
| Knapsack 1 | Amprion | Konventionell | positive | 506 | 12,146 | 23:November-23:November |
| UW Dörpen-West | TenneT DE | negative | 1130 | 10,169 | 23:November-12:November | |
| Lippendorf | 50Hertz | Konventionell | negative | 662 | 9,931 | 23:November-23:November |
| UW Diele | TenneT DE | negative | 606 | 9,695 | 07:November-23:November | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 555 | 7,915 | 08:November-23:November |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 370 | 7,394 | 23:November-23:November |
| AVA Cluster Voslapp | TenneT DE | negative | 301 | 6,700 | 23:November-21:November | |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 308 | 6,322 | 00:November-21:November |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 261 | 6,269 | 23:November-23:November |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 319 | 5,423 | 23:November-23:November |
| UW Diele | TenneT DE | negative | 898 | 5,391 | 23:November-05:November | |
| Emsland Block D | Amprion | Konventionell | positive | 408 | 5,199 | 23:November-21:November |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 454 | 4,994 | 23:November-21:November |
| Emsland Block D | Amprion | Konventionell | positive | 642 | 4,976 | 09:November-17:November |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 331 | 4,965 | 02:November-17:November |
| UW Büttel | TenneT DE | negative | 804 | 4,827 | 23:November-05:November | |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 220 | 4,680 | 01:November-23:November |
| WALSUM_10 | Amprion | Konventionell | negative | 282 | 3,954 | 00:November-23:November |
| AVA Cluster Voslapp | TenneT DE | negative | 337 | 3,788 | 11:November-23:November | |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 238 | 3,688 | 05:November-21:November |
| Emsland Block C | Amprion | Konventionell | positive | 244 | 3,592 | 23:November-21:November |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 195 | 3,516 | 23:November-20:November |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 238 | 3,270 | 23:November-13:November | |
| Emsland Block C | Amprion | Konventionell | positive | 314 | 3,057 | 07:November-17:November |
| Datteln_4 | Amprion | Konventionell | negative | 273 | 3,008 | 05:November-17:November |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 396 | 2,966 | 09:November-17:November |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 153 | 2,949 | 23:November-22:November |
| Gebersdorf 2 | TenneT DE | Konventionell | positive | 137 | 2,916 | 23:November-20:November |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 485 | 2,908 | 17:November-23:November |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 120 | 2,880 | 23:November-23:November |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 234 | 2,868 | 04:November-19:November |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 153 | 2,862 | 23:November-23:November | |
| Emsland Block D | Amprion | Konventionell | positive | 462 | 2,772 | 17:November-23:November |
| NIEHL-II | Amprion | Konventionell | positive | 248 | 2,729 | 12:November-23:November |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 232 | 2,611 | 00:November-23:November |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 260 | 2,600 | 23:November-09:November |
| NIEHL-II | Amprion | Konventionell | positive | 233 | 2,558 | 23:November-10:November |
| Netzreservekraftwerk Weiher C | Amprion | Konventionell | positive | 247 | 2,350 | 07:November-17:November |
| AVA Cluster Lehrte | TenneT DE | negative | 190 | 2,325 | 23:November-11:November | |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 161 | 2,179 | 04:November-18:November |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 434 | 2,172 | 23:November-04:November |
| Datteln_4 | Amprion | Konventionell | negative | 241 | 2,170 | 01:November-23:November |
| WEISWEILER_H | Amprion | Konventionell | negative | 338 | 2,113 | 04:November-11:November |
| 50H Hamburg Wedel1 | 50Hertz | Konventionell | negative | 88 | 2,112 | 23:November-23:November |
| Emsland Block C | Amprion | Konventionell | positive | 235 | 2,112 | 01:November-19:November |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.52M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-11-12?
On 2026-11-12, estimated redispatch costs were approximately €1.73 million. This includes €0.43M for renewable curtailment compensation and €1.12M for conventional ramp-up costs.
Which power plants were most affected on 2026-11-12?
The most affected plant was Börse (TenneT DE) with 22,326 MWh of positive redispatch.
What was the electricity spot price on 2026-11-12?
The EPEX Day-Ahead spot price for DE_LU ranged from 122 to 250 €/MWh with an average of 196 €/MWh.