← 2026-11-10

Wednesday, November 11, 2026

2026-11-12 →
6,417MWh Curtailed
7,173MWh Ramped Up
€3.19MEst. Cost
420 MWPeak Positive

Day-Ahead Spot: 198-458 €/MWh (avg 317)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 8 17,564
TenneT DE positive 11 11,576
Amprion positive 11 6,581
TransnetBW positive 5 4,126
50Hertz negative 3 2,055
Amprion negative 3 1,610
TransnetBW negative 2 561
50Hertz positive 3 59

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven TenneT DE Konventionell negative 653 15,670 23:November-23:November
ReserveKW Staudinger 5 TenneT DE Konventionell positive 224 4,931 23:November-21:November
Netzreservekraftwerk KMW 2 DT Amprion Konventionell positive 154 3,538 23:November-22:November
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 110 2,525 23:November-22:November
ReserveKW Staudinger 5 TenneT DE Konventionell positive 207 1,862 09:November-18:November
ReserveKW Ingolstadt 4 TenneT DE Konventionell positive 229 1,834 07:November-15:November
Rostock Kohlekraftwerk 50Hertz Konventionell negative 150 1,503 23:November-23:November
WEISWEILER_G Amprion Konventionell negative 206 1,442 11:November-18:November
illwerke vkw AG TransnetBW Sonstiges positive 162 1,171 06:November-17:November
Börse TenneT DE Sonstiges negative 188 941 07:November-12:November
ReserveKW Plattling TenneT DE Konventionell positive 30 720 23:November-23:November
ReserveKW Staudinger 5 TenneT DE Konventionell positive 179 716 13:November-17:November
Netzreservekraftwerk Weiher C Amprion Konventionell positive 163 654 05:November-09:November
Robert Frank 4 GT (KapRes) TenneT DE Konventionell positive 28 616 23:November-21:November
Gebersdorf 2 TenneT DE Konventionell positive 53 600 07:November-21:November
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 83 584 08:November-17:November
Jänschwalde (Standort) 50Hertz Konventionell negative 136 546 23:November-03:November
WEISWEILER_G Amprion Konventionell positive 173 518 14:November-17:November
HKW BARMEN 1 Amprion Konventionell positive 25 423 23:November-16:November
Börse Amprion Konventionell positive 336 420 07:November-12:November
Börse TransnetBW Sonstiges negative 75 376 23:November-19:November
Irsching 5 TenneT DE Konventionell negative 145 362 23:November-02:November
Irsching 4 TenneT DE Konventionell negative 146 293 00:November-02:November
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 82 247 23:November-05:November
Börse TransnetBW Sonstiges positive 82 225 23:November-19:November
Irsching 4 TenneT DE Konventionell negative 68 202 23:November-02:November
Börse TransnetBW Sonstiges negative 23 185 01:November-23:November
Obernburg TenneT DE Konventionell positive 14 173 00:November-23:November
LAUSWARD_GUDF Amprion Konventionell positive 43 128 23:November-02:November
Börse Amprion Konventionell negative 78 118 05:November-08:November
illwerke vkw AG TransnetBW Sonstiges positive 25 114 15:November-19:November
Niederrad 1 TenneT DE Konventionell positive 8 92 03:November-22:November
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 9 90 13:November-23:November
SW München KW-Pool TenneT DE Sonstiges negative 69 69 10:November-11:November
Börse Amprion Konventionell negative 20 50 11:November-14:November
KMW_KW5 Amprion Konventionell positive 20 30 12:November-20:November
50H Berlin Marzahn 50Hertz Konventionell positive 2 30 03:November-23:November
Börse Amprion Konventionell positive 55 28 22:November-23:November
Reisach TenneT DE Sonstiges positive 10 22 01:November-04:November
50H Berlin Lichterfelde 50Hertz Konventionell positive 5 20 05:November-10:November
Börse TenneT DE Sonstiges negative 10 20 02:November-04:November
UPM Schongau HKW3 Amprion Konventionell positive 11 11 01:November-02:November
ReserveKW Plattling TenneT DE Konventionell positive 13 10 22:November-23:November
Börse 50Hertz Sonstiges positive 36 9 23:November-23:November
Wilhelmshaven TenneT DE Konventionell negative 12 6 12:November-13:November
Börse 50Hertz Sonstiges negative 22 6 21:November-21:November

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.96M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-11-11?

On 2026-11-11, estimated redispatch costs were approximately €3.19 million. This includes €0.64M for renewable curtailment compensation and €2.49M for conventional ramp-up costs.

Which power plants were most affected on 2026-11-11?

The most affected plant was Wilhelmshaven (TenneT DE) with 15,670 MWh of negative redispatch.

What was the electricity spot price on 2026-11-11?

The EPEX Day-Ahead spot price for DE_LU ranged from 198 to 458 €/MWh with an average of 317 €/MWh.