3,879MWh Curtailed
5,034MWh Ramped Up
€1.59MEst. Cost
286 MWPeak Positive
Day-Ahead Spot: 89-231 €/MWh (avg 164)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 25 | 89,531 |
| 50Hertz | negative | 78 | 84,061 |
| TenneT DE | positive | 18 | 64,433 |
| TransnetBW | positive | 19 | 36,453 |
| Amprion | positive | 24 | 28,365 |
| Amprion | negative | 14 | 14,221 |
| 50Hertz | positive | 1 | 50 |
| TransnetBW | negative | 1 | 18 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 1043 | 22,687 | 23:November-23:November |
| Wilhelmshaven | TenneT DE | Konventionell | negative | 710 | 17,040 | 23:November-23:November |
| UW Dörpen-West | TenneT DE | negative | 926 | 16,210 | 04:November-22:November | |
| UW Büttel | TenneT DE | negative | 869 | 15,640 | 05:November-23:November | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 585 | 11,108 | 04:November-23:November |
| Börse | TenneT DE | Sonstiges | positive | 827 | 10,754 | 04:November-23:November |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 413 | 9,910 | 23:November-23:November |
| UW Diele | TenneT DE | negative | 569 | 9,817 | 05:November-22:November | |
| Irsching 5 | TenneT DE | Konventionell | positive | 535 | 8,965 | 02:November-19:November |
| Irsching 4 | TenneT DE | Konventionell | positive | 399 | 7,584 | 04:November-23:November |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 311 | 5,606 | 05:November-23:November |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 272 | 5,169 | 02:November-23:November |
| Datteln_4 | Amprion | Konventionell | negative | 468 | 5,150 | 12:November-23:November |
| Lippendorf | 50Hertz | Konventionell | negative | 378 | 4,911 | 23:November-12:November |
| Knapsack 1 | Amprion | Konventionell | positive | 300 | 4,870 | 03:November-22:November |
| UW Emden-Ost | TenneT DE | negative | 731 | 4,566 | 05:November-12:November | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 343 | 4,464 | 05:November-23:November |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 261 | 4,440 | 05:November-22:November |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 350 | 3,846 | 23:November-16:November |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 232 | 3,829 | 00:November-23:November |
| Knapsack 1 | Amprion | Konventionell | positive | 348 | 3,822 | 23:November-12:November |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 622 | 3,729 | 23:November-05:November |
| 50H_AVA_CR_STW | 50Hertz | negative | 595 | 3,717 | 05:November-11:November | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 320 | 3,680 | 05:November-23:November | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 224 | 2,963 | 04:November-21:November |
| Netzreservekraftwerk Weiher C | Amprion | Konventionell | positive | 251 | 2,881 | 07:November-23:November |
| AVA Cluster Alfstedt | TenneT DE | negative | 410 | 2,867 | 14:November-21:November | |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 257 | 2,831 | 23:November-10:November |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 164 | 2,786 | 23:November-19:November |
| Emsland Block B | Amprion | Konventionell | positive | 217 | 2,768 | 23:November-11:November |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 219 | 2,627 | 23:November-12:November |
| AVA Cluster Twistetal | TenneT DE | negative | 215 | 2,576 | 04:November-22:November | |
| NEURATH_G | Amprion | Konventionell | negative | 247 | 2,534 | 05:November-15:November |
| NIEHL-II | Amprion | Konventionell | positive | 165 | 2,516 | 23:November-15:November |
| AVA Cluster Helmstedt | TenneT DE | negative | 227 | 2,445 | 01:November-11:November | |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 243 | 2,365 | 05:November-15:November |
| 50H_MNS_CR_LAU_Nord | 50Hertz | negative | 255 | 2,358 | 08:November-23:November | |
| 50H_TEN_CR_M2_VIB | 50Hertz | negative | 259 | 2,332 | 08:November-23:November | |
| UW Büttel | TenneT DE | negative | 489 | 2,200 | 04:November-09:November | |
| Irsching 4 | TenneT DE | Konventionell | positive | 481 | 2,165 | 23:November-03:November |
| 50H OWP Arkona | 50Hertz | negative | 336 | 2,100 | 06:November-13:November | |
| 50H OWP Wikinger | 50Hertz | negative | 293 | 2,050 | 07:November-14:November | |
| 50H_AVA_CR_FOE | 50Hertz | negative | 285 | 1,998 | 06:November-13:November | |
| Netzreservekraftwerk Weiher C | Amprion | Konventionell | positive | 245 | 1,960 | 07:November-15:November |
| Lippendorf | 50Hertz | Konventionell | negative | 267 | 1,869 | 05:November-22:November |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 101 | 1,840 | 04:November-23:November |
| UW Büttel | TenneT DE | negative | 477 | 1,788 | 17:November-21:November | |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 293 | 1,759 | 23:November-05:November |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 101 | 1,620 | 04:November-23:November |
| AVA Cluster Ohlensehlen | TenneT DE | negative | 246 | 1,600 | 04:November-11:November |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.48M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-11-13?
On 2026-11-13, estimated redispatch costs were approximately €1.59 million. This includes €0.39M for renewable curtailment compensation and €0.98M for conventional ramp-up costs.
Which power plants were most affected on 2026-11-13?
The most affected plant was Börse (TenneT DE) with 22,687 MWh of positive redispatch.
What was the electricity spot price on 2026-11-13?
The EPEX Day-Ahead spot price for DE_LU ranged from 89 to 231 €/MWh with an average of 164 €/MWh.