4,142MWh Curtailed
5,097MWh Ramped Up
€1.78MEst. Cost
305 MWPeak Positive

Day-Ahead Spot: 145-267 €/MWh (avg 197)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 11 13,284
TenneT DE negative 6 11,497
50Hertz negative 23 9,993
TenneT DE positive 5 7,490
TransnetBW positive 3 6,034
Amprion negative 4 3,104
TransnetBW negative 2 182
50Hertz positive 2 169

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven TenneT DE Konventionell negative 410 9,834 23:November-23:November
Börse TenneT DE Sonstiges positive 875 6,561 23:November-06:November
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 545 5,040 02:November-12:November
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 365 5,017 23:November-23:November
NIEHL-II Amprion Konventionell positive 182 3,279 00:November-23:November
Emsland Block D Amprion Konventionell positive 313 3,050 02:November-12:November
Datteln_4 Amprion Konventionell negative 196 2,644 23:November-23:November
Emsland Block C Amprion Konventionell positive 236 2,124 01:November-10:November
HAMMUENTROP_20 Amprion Konventionell positive 253 1,964 06:November-14:November
Lippendorf 50Hertz Konventionell negative 175 1,182 05:November-15:November
Emsland Block D Amprion Konventionell positive 200 1,102 08:November-13:November
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 240 960 05:November-09:November
Kiel (Küstenkraftwerk gesamt) TenneT DE Konventionell negative 135 947 00:November-12:November
NIEHL-31-GUD Amprion Konventionell positive 117 935 01:November-12:November
ReserveKW Staudinger 5 TenneT DE Konventionell positive 146 732 02:November-11:November
50H Berlin Mitte 50Hertz Konventionell negative 81 731 14:November-23:November
UW Dörpen-West TenneT DE Erneuerbar negative 233 699 02:November-05:November
Lippendorf 50Hertz Konventionell negative 156 429 03:November-05:November
HUCKINGEN_A Amprion Konventionell positive 100 400 04:November-08:November
50H Berlin Marzahn 50Hertz Konventionell negative 118 354 23:November-02:November
KMW_KW5 Amprion Konventionell negative 68 340 15:November-20:November
Boxberg (Standort) 50Hertz Konventionell negative 119 296 05:November-11:November
50H_MNS_CR_PUL 50Hertz Erneuerbar negative 144 288 02:November-04:November
50H Dresden-Nossen 50Hertz Konventionell negative 142 284 23:November-01:November
Schkopau 50Hertz Konventionell negative 92 276 05:November-08:November
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell negative 44 262 23:November-05:November
GUD_HERNE_6 Amprion Konventionell positive 133 200 03:November-05:November
Hannover-Linden GuD TenneT DE Konventionell positive 54 161 07:November-10:November
Börse TransnetBW Sonstiges negative 43 160 23:November-22:November
NIEHL-31-GUD Amprion Konventionell positive 105 158 11:November-13:November
Börse 50Hertz Sonstiges positive 45 156 13:November-17:November
50H OWP Baltic 1+2 50Hertz Erneuerbar negative 45 156 13:November-17:November
50H Dresden-Reick 50Hertz Konventionell negative 41 123 23:November-02:November
50H Halle-Trotha HKW 50Hertz Konventionell negative 23 115 23:November-04:November
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 90 112 03:November-04:November
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 144 108 02:November-05:November
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 30 90 23:November-16:November
50H Berlin Lichterfelde 50Hertz Konventionell negative 30 67 05:November-11:November
illwerke vkw AG TransnetBW Sonstiges positive 231 58 11:November-12:November
Schkopau 50Hertz Konventionell negative 39 48 06:November-08:November
Börse Amprion Konventionell positive 80 40 11:November-12:November
50H UW Bertikow 50Hertz Erneuerbar negative 36 36 07:November-10:November
UPM Schongau HKW3 Amprion Konventionell positive 32 32 05:November-06:November
Börse TenneT DE Sonstiges positive 64 32 13:November-14:November
50H UW Bertikow 50Hertz Erneuerbar negative 121 30 02:November-03:November
INFRA_HOE_GTX1 Amprion Konventionell negative 15 30 23:November-01:November
50H UW Schönewalde 50Hertz Erneuerbar negative 20 25 07:November-10:November
Börse TransnetBW Sonstiges negative 89 22 01:November-01:November
50H Berlin Mitte 50Hertz Konventionell negative 20 20 23:November-00:November
Börse 50Hertz Sonstiges positive 5 13 02:November-05:November

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.53M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-11-14?

On 2026-11-14, estimated redispatch costs were approximately €1.78 million. This includes €0.41M for renewable curtailment compensation and €1.16M for conventional ramp-up costs.

Which power plants were most affected on 2026-11-14?

The most affected plant was Wilhelmshaven (TenneT DE) with 9,834 MWh of negative redispatch.

What was the electricity spot price on 2026-11-14?

The EPEX Day-Ahead spot price for DE_LU ranged from 145 to 267 €/MWh with an average of 197 €/MWh.