3,360MWh Curtailed
4,035MWh Ramped Up
€1.35MEst. Cost
288 MWPeak Positive
Day-Ahead Spot: 9-288 €/MWh (avg 142)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 30 | 47,568 |
| TransnetBW | positive | 16 | 13,969 |
| Amprion | positive | 12 | 13,127 |
| 50Hertz | negative | 34 | 9,898 |
| Amprion | negative | 3 | 2,647 |
| TenneT DE | positive | 1 | 1,725 |
| TransnetBW | negative | 1 | 47 |
| 50Hertz | positive | 1 | 9 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Dörpen-West | TenneT DE | negative | 1325 | 14,576 | 04:September-15:September | |
| UW Diele | TenneT DE | negative | 899 | 8,987 | 04:September-14:September | |
| UW Emden-Ost | TenneT DE | negative | 802 | 7,222 | 04:September-13:September | |
| KMW_KW3 | Amprion | Konventionell | positive | 327 | 4,824 | 01:September-15:September |
| UW Büttel | TenneT DE | negative | 565 | 4,519 | 04:September-14:September | |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 298 | 3,875 | 00:September-13:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 320 | 3,202 | 03:September-13:September |
| NEURATH_G | Amprion | Konventionell | negative | 371 | 2,596 | 09:September-16:September |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 274 | 2,470 | 02:September-11:September |
| UW Garrel-Ost alpha | TenneT DE | negative | 234 | 1,872 | 04:September-13:September | |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 216 | 1,725 | 02:September-10:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 291 | 1,602 | 05:September-11:September |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 194 | 1,600 | 08:September-16:September | |
| Emsland Block B | Amprion | Konventionell | positive | 227 | 1,360 | 02:September-08:September |
| Emsland Block D | Amprion | Konventionell | positive | 262 | 1,312 | 03:September-08:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 265 | 1,194 | 05:September-15:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 177 | 1,192 | 04:September-13:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 276 | 1,104 | 04:September-10:September |
| SHN Cluster Süderdonn T412 T413 | TenneT DE | negative | 125 | 1,062 | 07:September-16:September | |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 162 | 1,015 | 05:September-12:September |
| AVA Cluster Lehrte | TenneT DE | negative | 233 | 991 | 09:September-13:September | |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 300 | 975 | 11:September-15:September | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 800 | 11:September-15:September | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 153 | 766 | 11:September-16:September |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 254 | 762 | 05:September-08:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 132 | 760 | 08:September-16:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 242 | 725 | 13:September-16:September |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 118 | 708 | 08:September-14:September |
| Schkopau | 50Hertz | Konventionell | negative | 176 | 705 | 04:September-08:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 119 | 654 | 00:September-11:September |
| BAG NWAK-Cluster 06 Raitersaich | TenneT DE | negative | 150 | 600 | 11:September-15:September | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 150 | 600 | 11:September-15:September | |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 343 | 600 | 14:September-15:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 163 | 530 | 12:September-15:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 175 | 525 | 12:September-15:September |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 111 | 500 | 08:September-12:September | |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | negative | 219 | 492 | 07:September-10:September |
| AVA Cluster Twistetal | TenneT DE | negative | 185 | 463 | 12:September-15:September | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 140 | 456 | 05:September-11:September |
| Lippendorf | 50Hertz | Konventionell | negative | 150 | 450 | 04:September-07:September |
| 50H UW Schönewalde | 50Hertz | negative | 90 | 450 | 09:September-15:September | |
| KMW_KW5 | Amprion | Konventionell | positive | 54 | 428 | 04:September-12:September |
| UW Dörpen-West | TenneT DE | negative | 85 | 425 | 00:September-09:September | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 236 | 412 | 10:September-13:September |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 136 | 407 | 08:September-11:September |
| OWP Borkum Riffgrund 3 | TenneT DE | negative | 200 | 350 | 09:September-11:September | |
| AVA Cluster Dipperz | TenneT DE | negative | 140 | 349 | 11:September-14:September | |
| 50H_AVA_CR_FOE | 50Hertz | negative | 90 | 338 | 08:September-12:September | |
| Hannover (GKH) 2 | TenneT DE | Konventionell | negative | 67 | 334 | 03:September-08:September |
| BAG NWAK-Cluster 02 Oberhaid-Redwitz | TenneT DE | negative | 100 | 325 | 11:September-15:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.41M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-24?
On 2026-09-24, estimated redispatch costs were approximately €1.35 million. This includes €0.34M for renewable curtailment compensation and €0.69M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-24?
The most affected plant was UW Dörpen-West (TenneT DE) with 14,576 MWh of negative redispatch.
What was the electricity spot price on 2026-09-24?
The EPEX Day-Ahead spot price for DE_LU ranged from 9 to 288 €/MWh with an average of 142 €/MWh.