← 2026-09-23

Thursday, September 24, 2026

2026-09-25 →
3,360MWh Curtailed
4,035MWh Ramped Up
€1.35MEst. Cost
288 MWPeak Positive

Day-Ahead Spot: 9-288 €/MWh (avg 142)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 30 47,568
TransnetBW positive 16 13,969
Amprion positive 12 13,127
50Hertz negative 34 9,898
Amprion negative 3 2,647
TenneT DE positive 1 1,725
TransnetBW negative 1 47
50Hertz positive 1 9

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Dörpen-West TenneT DE Erneuerbar negative 1325 14,576 04:September-15:September
UW Diele TenneT DE Erneuerbar negative 899 8,987 04:September-14:September
UW Emden-Ost TenneT DE Erneuerbar negative 802 7,222 04:September-13:September
KMW_KW3 Amprion Konventionell positive 327 4,824 01:September-15:September
UW Büttel TenneT DE Erneuerbar negative 565 4,519 04:September-14:September
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 298 3,875 00:September-13:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 320 3,202 03:September-13:September
NEURATH_G Amprion Konventionell negative 371 2,596 09:September-16:September
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 274 2,470 02:September-11:September
UW Garrel-Ost alpha TenneT DE Erneuerbar negative 234 1,872 04:September-13:September
ReserveKW Staudinger 4 TenneT DE Konventionell positive 216 1,725 02:September-10:September
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 291 1,602 05:September-11:September
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 194 1,600 08:September-16:September
Emsland Block B Amprion Konventionell positive 227 1,360 02:September-08:September
Emsland Block D Amprion Konventionell positive 262 1,312 03:September-08:September
illwerke vkw AG TransnetBW Sonstiges positive 265 1,194 05:September-15:September
Boxberg (Standort) 50Hertz Konventionell negative 177 1,192 04:September-13:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 276 1,104 04:September-10:September
SHN Cluster Süderdonn T412 T413 TenneT DE Erneuerbar negative 125 1,062 07:September-16:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 162 1,015 05:September-12:September
AVA Cluster Lehrte TenneT DE Erneuerbar negative 233 991 09:September-13:September
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 300 975 11:September-15:September
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 800 11:September-15:September
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 153 766 11:September-16:September
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 254 762 05:September-08:September
Rostock Kohlekraftwerk 50Hertz Konventionell negative 132 760 08:September-16:September
Boxberg (Standort) 50Hertz Konventionell negative 242 725 13:September-16:September
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 118 708 08:September-14:September
Schkopau 50Hertz Konventionell negative 176 705 04:September-08:September
KNAPSACK_20 Amprion Konventionell positive 119 654 00:September-11:September
BAG NWAK-Cluster 06 Raitersaich TenneT DE Erneuerbar negative 150 600 11:September-15:September
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 150 600 11:September-15:September
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 343 600 14:September-15:September
Boxberg (Standort) 50Hertz Konventionell negative 163 530 12:September-15:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 175 525 12:September-15:September
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 111 500 08:September-12:September
ReserveKW Staudinger 4 TenneT DE Konventionell negative 219 492 07:September-10:September
AVA Cluster Twistetal TenneT DE Erneuerbar negative 185 463 12:September-15:September
Jänschwalde (Standort) 50Hertz Konventionell negative 140 456 05:September-11:September
Lippendorf 50Hertz Konventionell negative 150 450 04:September-07:September
50H UW Schönewalde 50Hertz Erneuerbar negative 90 450 09:September-15:September
KMW_KW5 Amprion Konventionell positive 54 428 04:September-12:September
UW Dörpen-West TenneT DE Erneuerbar negative 85 425 00:September-09:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 236 412 10:September-13:September
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 136 407 08:September-11:September
OWP Borkum Riffgrund 3 TenneT DE Erneuerbar negative 200 350 09:September-11:September
AVA Cluster Dipperz TenneT DE Erneuerbar negative 140 349 11:September-14:September
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 90 338 08:September-12:September
Hannover (GKH) 2 TenneT DE Konventionell negative 67 334 03:September-08:September
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 100 325 11:September-15:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.41M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-24?

On 2026-09-24, estimated redispatch costs were approximately €1.35 million. This includes €0.34M for renewable curtailment compensation and €0.69M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-24?

The most affected plant was UW Dörpen-West (TenneT DE) with 14,576 MWh of negative redispatch.

What was the electricity spot price on 2026-09-24?

The EPEX Day-Ahead spot price for DE_LU ranged from 9 to 288 €/MWh with an average of 142 €/MWh.