OWP Borkum Riffgrund 3
480Total MWh
7Measures
69 MWAvg Power
7Curtailments
0Ramp-ups
Data: 2026-03-24 to 2026-05-13
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-05-13 | 3 | 1 |
| 2026-05-12 | 3 | 349 |
| 2026-03-24 | 1 | 129 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-05-13 | TenneT DE | negative | 0 | 0 | 12:May-12:May |
| 2026-05-13 | TenneT DE | negative | 0 | 0 | 12:May-12:May |
| 2026-05-13 | TenneT DE | negative | 0 | 0 | 12:May-12:May |
| 2026-05-12 | TenneT DE | negative | 116 | 116 | 07:May-08:May |
| 2026-05-12 | TenneT DE | negative | 116 | 116 | 07:May-08:May |
| 2026-05-12 | TenneT DE | negative | 116 | 116 | 07:May-08:May |
| 2026-03-24 | TenneT DE | negative | 129 | 129 | 11:March-12:March |
Frequently Asked Questions
What is the redispatch history of OWP Borkum Riffgrund 3?
OWP Borkum Riffgrund 3 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 7 redispatch instructions totaling 480 MWh since 2026-03-24.
Why is OWP Borkum Riffgrund 3 frequently redispatched?
Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.