OWP Borkum Riffgrund 3

Erneuerbar • TenneT DE

675Total MWh
7Measures
86 MWAvg Power
7Curtailments
0Ramp-ups

Data: 2026-03-24 to 2026-09-29

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-09-29 2 66
2026-09-24 1 350
2026-08-19 1 12
2026-05-13 1 0
2026-05-12 1 116
2026-03-24 1 129

Recent Measures

DateTSODirAvg MWMWhTime
2026-09-29 TenneT DE negative 66 33 12:September-12:September
2026-09-29 TenneT DE negative 66 33 12:September-12:September
2026-09-24 TenneT DE negative 200 350 09:September-11:September
2026-08-19 TenneT DE negative 25 12 12:August-12:August
2026-05-13 TenneT DE negative 0 0 12:May-12:May
2026-05-12 TenneT DE negative 116 116 07:May-08:May
2026-03-24 TenneT DE negative 129 129 11:March-12:March

Frequently Asked Questions

What is the redispatch history of OWP Borkum Riffgrund 3?

OWP Borkum Riffgrund 3 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 7 redispatch instructions totaling 675 MWh since 2026-03-24.

Why is OWP Borkum Riffgrund 3 frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.