OWP Borkum Riffgrund 3
675Total MWh
7Measures
86 MWAvg Power
7Curtailments
0Ramp-ups
Data: 2026-03-24 to 2026-09-29
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-09-29 | 2 | 66 |
| 2026-09-24 | 1 | 350 |
| 2026-08-19 | 1 | 12 |
| 2026-05-13 | 1 | 0 |
| 2026-05-12 | 1 | 116 |
| 2026-03-24 | 1 | 129 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-09-29 | TenneT DE | negative | 66 | 33 | 12:September-12:September |
| 2026-09-29 | TenneT DE | negative | 66 | 33 | 12:September-12:September |
| 2026-09-24 | TenneT DE | negative | 200 | 350 | 09:September-11:September |
| 2026-08-19 | TenneT DE | negative | 25 | 12 | 12:August-12:August |
| 2026-05-13 | TenneT DE | negative | 0 | 0 | 12:May-12:May |
| 2026-05-12 | TenneT DE | negative | 116 | 116 | 07:May-08:May |
| 2026-03-24 | TenneT DE | negative | 129 | 129 | 11:March-12:March |
Frequently Asked Questions
What is the redispatch history of OWP Borkum Riffgrund 3?
OWP Borkum Riffgrund 3 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 7 redispatch instructions totaling 675 MWh since 2026-03-24.
Why is OWP Borkum Riffgrund 3 frequently redispatched?
Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.