← 2026-05-12

Wednesday, May 13, 2026

2026-05-14 →
2,828MWh Curtailed
2,367MWh Ramped Up
€0.7MEst. Cost
161 MWPeak Positive

Day-Ahead Spot: 64-183 €/MWh (avg 115)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 6 11,973
50Hertz negative 17 10,564
TenneT DE negative 5 9,521
Amprion positive 4 5,293
TransnetBW negative 1 983
TransnetBW positive 1 332
50Hertz positive 3 57

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Zolling 5 TenneT DE Konventionell positive 288 6,915 22:May-22:May
Börse TenneT DE Sonstiges negative 296 6,665 22:May-22:May
LAUSWARD_GUDF Amprion Konventionell positive 377 3,964 06:May-16:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 342 2,393 08:May-15:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 283 2,125 07:May-15:May
ReserveKW Staudinger 4 TenneT DE Konventionell positive 281 2,040 08:May-15:May
Boxberg (Standort) 50Hertz Konventionell negative 183 1,831 06:May-16:May
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 251 1,446 08:May-14:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 130 1,171 07:May-16:May
Börse TransnetBW Sonstiges negative 164 983 06:May-16:May
Boxberg (Standort) 50Hertz Konventionell negative 154 924 07:May-13:May
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 179 893 10:May-15:May
Emsland Block B Amprion Konventionell positive 134 806 07:May-13:May
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 131 720 09:May-15:May
ReserveKW Zolling 5 TenneT DE Konventionell positive 178 710 18:May-22:May
Börse TenneT DE Sonstiges negative 178 710 18:May-22:May
Börse TenneT DE Sonstiges negative 400 700 14:May-15:May
Lippendorf 50Hertz Konventionell negative 347 694 06:May-08:May
50H PV Witznitz 50Hertz Erneuerbar negative 144 432 08:May-13:May
50H_AVA_CR_STW 50Hertz Erneuerbar negative 236 412 10:May-12:May
Jänschwalde (Standort) 50Hertz Konventionell negative 194 387 07:May-09:May
Börse TransnetBW Sonstiges positive 89 332 06:May-15:May
Jänschwalde (Standort) 50Hertz Konventionell negative 138 275 09:May-11:May
WEISWEILER_H Amprion Konventionell positive 151 265 08:May-10:May
WEISWEILER_H Amprion Konventionell positive 148 258 07:May-09:May
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 100 200 11:May-13:May
Itzehoe TenneT DE Konventionell positive 88 176 10:May-12:May
50H UW Putlitz 50Hertz Erneuerbar negative 30 90 10:May-13:May
50H Chemnitz 50Hertz Konventionell negative 14 70 08:May-13:May
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell positive 39 39 08:May-09:May
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 38 38 07:May-08:May
50H BASF Schwarzheide 50Hertz Konventionell negative 6 18 07:May-14:May
50H Halle-Dieselstr HKW-BlockA 50Hertz Konventionell negative 8 16 07:May-09:May
50H Hamburg Wedel1 50Hertz Konventionell positive 10 10 08:May-09:May
Börse 50Hertz Sonstiges positive 34 8 04:May-05:May
Börse TenneT DE Sonstiges positive 10 8 08:May-08:May
OWP Borkum Riffgrund 3 TenneT DE Erneuerbar negative 0 0 12:May-12:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-13?

On 2026-05-13, estimated redispatch costs were approximately €0.7 million. This includes €0.28M for renewable curtailment compensation and €0.34M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-13?

The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 6,915 MWh of positive redispatch.

What was the electricity spot price on 2026-05-13?

The EPEX Day-Ahead spot price for DE_LU ranged from 64 to 183 €/MWh with an average of 115 €/MWh.