2,536MWh Curtailed
2,051MWh Ramped Up
€0.62MEst. Cost
191 MWPeak Positive
Day-Ahead Spot: 3-168 €/MWh (avg 96)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 5 | 8,321 |
| 50Hertz | negative | 23 | 5,042 |
| TenneT DE | negative | 3 | 3,418 |
| Amprion | positive | 1 | 122 |
| 50Hertz | positive | 3 | 114 |
| TransnetBW | positive | 1 | 52 |
| TransnetBW | negative | 1 | 0 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 292 | 7,020 | 22:May-22:May |
| Börse | TenneT DE | Sonstiges | negative | 172 | 3,101 | 22:May-16:May |
| 50H_AVA_CR_WOL | 50Hertz | negative | 292 | 1,021 | 07:May-11:May | |
| 50H_AVA_CR_STW | 50Hertz | negative | 300 | 976 | 07:May-10:May | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 168 | 797 | 06:May-11:May |
| 50H_EDIS_CR_WU | 50Hertz | negative | 139 | 662 | 08:May-12:May | |
| 50H PV Witznitz | 50Hertz | negative | 105 | 342 | 08:May-11:May | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 186 | 326 | 06:May-08:May |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 144 | 325 | 06:May-08:May |
| AVA Cluster Helmstedt | TenneT DE | negative | 100 | 300 | 08:May-11:May | |
| 50H_TEN_CR_M1_EI | 50Hertz | negative | 79 | 275 | 07:May-11:May | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 112 | 197 | 06:May-08:May |
| 50H UW Bertikow | 50Hertz | negative | 86 | 172 | 08:May-10:May | |
| 50H PV Bartow | 50Hertz | negative | 43 | 130 | 08:May-11:May | |
| Braunschweig GT | TenneT DE | Konventionell | positive | 36 | 128 | 06:May-09:May |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 127 | 127 | 06:May-07:May |
| 50H_AVA_CR_FOE | 50Hertz | negative | 83 | 125 | 08:May-10:May | |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 122 | 122 | 07:May-08:May |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 120 | 120 | 07:May-08:May |
| 50H UW Wustermark | 50Hertz | negative | 40 | 120 | 08:May-11:May | |
| 50H UW Schönewalde | 50Hertz | negative | 33 | 99 | 08:May-11:May | |
| 50H_MNS_CR_LAU_Nord | 50Hertz | negative | 50 | 88 | 07:May-09:May | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 24 | 71 | 08:May-11:May | |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | positive | 39 | 68 | 06:May-08:May |
| Börse | TransnetBW | Sonstiges | positive | 105 | 52 | 08:May-08:May |
| Braunschweig DT | TenneT DE | Konventionell | positive | 15 | 51 | 06:May-09:May |
| 50H_TEN_CR_M2_VIB | 50Hertz | negative | 50 | 50 | 08:May-09:May | |
| 50H_EDIS_CR_HND | 50Hertz | negative | 30 | 45 | 11:May-12:May | |
| Börse | 50Hertz | Sonstiges | positive | 20 | 40 | 00:May-02:May |
| 50H Chemnitz | 50Hertz | Konventionell | negative | 20 | 40 | 00:May-02:May |
| 50H OWP Wikinger | 50Hertz | negative | 10 | 29 | 08:May-11:May | |
| 50H OWP Arkona | 50Hertz | negative | 6 | 19 | 08:May-11:May | |
| Börse | TenneT DE | Sonstiges | negative | 34 | 17 | 06:May-07:May |
| Börse | 50Hertz | Sonstiges | positive | 12 | 6 | 21:May-22:May |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 3 | 6 | 07:May-09:May |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | negative | 2 | 2 | 08:May-09:May |
| Börse | TransnetBW | Sonstiges | negative | 0 | 0 | 06:May-07:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-14?
On 2026-05-14, estimated redispatch costs were approximately €0.62 million. This includes €0.25M for renewable curtailment compensation and €0.26M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-14?
The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 7,020 MWh of positive redispatch.
What was the electricity spot price on 2026-05-14?
The EPEX Day-Ahead spot price for DE_LU ranged from 3 to 168 €/MWh with an average of 96 €/MWh.