2,536MWh Curtailed
2,051MWh Ramped Up
€0.62MEst. Cost
191 MWPeak Positive

Day-Ahead Spot: 3-168 €/MWh (avg 96)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 5 8,321
50Hertz negative 23 5,042
TenneT DE negative 3 3,418
Amprion positive 1 122
50Hertz positive 3 114
TransnetBW positive 1 52
TransnetBW negative 1 0

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Zolling 5 TenneT DE Konventionell positive 292 7,020 22:May-22:May
Börse TenneT DE Sonstiges negative 172 3,101 22:May-16:May
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 292 1,021 07:May-11:May
50H_AVA_CR_STW 50Hertz Erneuerbar negative 300 976 07:May-10:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 168 797 06:May-11:May
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 139 662 08:May-12:May
50H PV Witznitz 50Hertz Erneuerbar negative 105 342 08:May-11:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 186 326 06:May-08:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 144 325 06:May-08:May
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 100 300 08:May-11:May
50H_TEN_CR_M1_EI 50Hertz Erneuerbar negative 79 275 07:May-11:May
Boxberg (Standort) 50Hertz Konventionell negative 112 197 06:May-08:May
50H UW Bertikow 50Hertz Erneuerbar negative 86 172 08:May-10:May
50H PV Bartow 50Hertz Erneuerbar negative 43 130 08:May-11:May
Braunschweig GT TenneT DE Konventionell positive 36 128 06:May-09:May
Jänschwalde (Standort) 50Hertz Konventionell negative 127 127 06:May-07:May
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 83 125 08:May-10:May
NIEHL-31-GUD Amprion Konventionell positive 122 122 07:May-08:May
Jänschwalde (Standort) 50Hertz Konventionell negative 120 120 07:May-08:May
50H UW Wustermark 50Hertz Erneuerbar negative 40 120 08:May-11:May
50H UW Schönewalde 50Hertz Erneuerbar negative 33 99 08:May-11:May
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 50 88 07:May-09:May
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 24 71 08:May-11:May
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell positive 39 68 06:May-08:May
Börse TransnetBW Sonstiges positive 105 52 08:May-08:May
Braunschweig DT TenneT DE Konventionell positive 15 51 06:May-09:May
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 50 50 08:May-09:May
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 30 45 11:May-12:May
Börse 50Hertz Sonstiges positive 20 40 00:May-02:May
50H Chemnitz 50Hertz Konventionell negative 20 40 00:May-02:May
50H OWP Wikinger 50Hertz Erneuerbar negative 10 29 08:May-11:May
50H OWP Arkona 50Hertz Erneuerbar negative 6 19 08:May-11:May
Börse TenneT DE Sonstiges negative 34 17 06:May-07:May
Börse 50Hertz Sonstiges positive 12 6 21:May-22:May
50H BASF Schwarzheide 50Hertz Konventionell negative 3 6 07:May-09:May
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 2 2 08:May-09:May
Börse TransnetBW Sonstiges negative 0 0 06:May-07:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-14?

On 2026-05-14, estimated redispatch costs were approximately €0.62 million. This includes €0.25M for renewable curtailment compensation and €0.26M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-14?

The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 7,020 MWh of positive redispatch.

What was the electricity spot price on 2026-05-14?

The EPEX Day-Ahead spot price for DE_LU ranged from 3 to 168 €/MWh with an average of 96 €/MWh.