3,827MWh Curtailed
5,074MWh Ramped Up
€1.82MEst. Cost
492 MWPeak Positive
Day-Ahead Spot: 112-648 €/MWh (avg 227)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | positive | 24 | 34,780 |
| 50Hertz | negative | 42 | 29,508 |
| TransnetBW | positive | 9 | 7,167 |
| Amprion | negative | 13 | 3,147 |
| TransnetBW | negative | 2 | 1,875 |
| TenneT DE | negative | 4 | 1,710 |
| TenneT DE | positive | 6 | 1,164 |
| 50Hertz | positive | 1 | 10 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 480 | 11,520 | 22:September-22:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 538 | 4,305 | 07:September-15:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 465 | 4,188 | 07:September-16:September |
| Lippendorf | 50Hertz | Konventionell | negative | 380 | 3,802 | 05:September-15:September |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 393 | 3,538 | 06:September-15:September |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 404 | 3,330 | 12:September-21:September |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 245 | 2,940 | 07:September-19:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 366 | 2,926 | 07:September-15:September |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 270 | 2,902 | 04:September-15:September |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 232 | 2,549 | 06:September-19:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 359 | 2,332 | 08:September-14:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 244 | 2,319 | 05:September-15:September |
| NIEHL-II | Amprion | Konventionell | positive | 303 | 1,971 | 07:September-14:September |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 305 | 1,905 | 00:September-06:September |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | negative | 151 | 1,740 | 22:September-09:September |
| 50H_AVA_CR_STW | 50Hertz | negative | 235 | 1,645 | 08:September-15:September | |
| Irsching 4 | TenneT DE | Konventionell | negative | 162 | 1,454 | 22:September-07:September |
| HERDECKE_H6 | Amprion | Konventionell | positive | 204 | 1,426 | 08:September-15:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 258 | 1,289 | 09:September-14:September |
| 50H_AVA_CR_WOL | 50Hertz | negative | 181 | 1,221 | 08:September-14:September | |
| 50H PV Witznitz | 50Hertz | negative | 177 | 1,154 | 08:September-14:September | |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 121 | 850 | 07:September-14:September |
| WEISWEILERVGT_H3 | Amprion | Konventionell | positive | 175 | 831 | 05:September-10:September |
| 50H EE Bartow | 50Hertz | negative | 127 | 792 | 08:September-14:September | |
| 50H_AVA_CR_FOE | 50Hertz | negative | 117 | 760 | 08:September-14:September | |
| KMW_KW3 | Amprion | Konventionell | positive | 150 | 748 | 09:September-14:September |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 174 | 738 | 10:September-14:September | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 56 | 726 | 00:September-17:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 177 | 618 | 08:September-12:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 91 | 615 | 07:September-19:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 68 | 613 | 07:September-17:September |
| Börse | TransnetBW | Sonstiges | positive | 56 | 611 | 23:September-22:September |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 94 | 561 | 22:September-04:September |
| 50H_EDIS_CR_PE | 50Hertz | negative | 129 | 517 | 10:September-14:September | |
| 50H UW Bertikow | 50Hertz | negative | 79 | 516 | 08:September-14:September | |
| HUCKINGEN_A | Amprion | Konventionell | positive | 100 | 500 | 11:September-16:September |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 480 | 480 | 21:September-22:September |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 60 | 450 | 07:September-15:September |
| NIEHL-II | Amprion | Konventionell | negative | 73 | 440 | 22:September-04:September |
| WALSUM_10 | Amprion | Konventionell | negative | 125 | 438 | 00:September-04:September |
| Datteln_4 | Amprion | Konventionell | negative | 125 | 438 | 00:September-04:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 90 | 382 | 09:September-13:September |
| Emden 4 GT (KapRes) | TenneT DE | Konventionell | positive | 48 | 350 | 08:September-15:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 84 | 338 | 07:September-13:September |
| WALSUM_10 | Amprion | Konventionell | negative | 148 | 334 | 12:September-15:September |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 43 | 303 | 07:September-15:September |
| 50H Dresden-Reick | 50Hertz | Konventionell | negative | 56 | 280 | 09:September-14:September |
| Börse | Amprion | Konventionell | negative | 40 | 277 | 06:September-14:September |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 60 | 239 | 22:September-09:September |
| Börse | Amprion | Konventionell | negative | 147 | 220 | 00:September-06:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.55M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-22?
On 2026-09-22, estimated redispatch costs were approximately €1.82 million. This includes €0.38M for renewable curtailment compensation and €1.3M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-22?
The most affected plant was Netzreservekraftwerk Bexbach A (Amprion) with 11,520 MWh of positive redispatch.
What was the electricity spot price on 2026-09-22?
The EPEX Day-Ahead spot price for DE_LU ranged from 112 to 648 €/MWh with an average of 227 €/MWh.