← 2026-08-26

Thursday, August 27, 2026

2026-08-28 →
3,128MWh Curtailed
3,939MWh Ramped Up
€1.22MEst. Cost
221 MWPeak Positive

Day-Ahead Spot: 0-212 €/MWh (avg 125)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 39 81,301
Amprion positive 36 78,142
50Hertz negative 36 45,852
TransnetBW positive 19 29,859
TenneT DE positive 11 17,936
Amprion negative 11 4,364
TransnetBW negative 2 3,207

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Büttel TenneT DE Erneuerbar negative 962 17,324 04:August-22:August
UW Dörpen-West TenneT DE Erneuerbar negative 1109 15,804 07:August-22:August
Börse TenneT DE Sonstiges positive 1051 10,510 22:August-08:August
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 572 8,582 07:August-22:August
illwerke vkw AG TransnetBW Sonstiges positive 526 7,239 07:August-22:August
Boxberg (Standort) 50Hertz Konventionell negative 560 6,156 22:August-09:August
UW Emden-Ost TenneT DE Erneuerbar negative 698 5,930 07:August-22:August
WEISWEILER_G Amprion Konventionell positive 379 5,688 06:August-22:August
UW Büttel TenneT DE Erneuerbar negative 937 5,625 22:August-04:August
Emsland Block C Amprion Konventionell positive 398 5,577 22:August-12:August
Knapsack 1 Amprion Konventionell positive 483 5,438 22:August-09:August
HERDECKE_H6 Amprion Konventionell positive 340 5,264 22:August-13:August
Boxberg (Standort) 50Hertz Konventionell negative 576 5,186 06:August-22:August
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 520 4,942 22:August-07:August
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 274 4,924 04:August-22:August
UW Diele TenneT DE Erneuerbar negative 371 4,455 04:August-16:August
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 367 4,126 10:August-22:August
Knapsack 1 Amprion Konventionell positive 512 3,965 13:August-21:August
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 600 3,900 07:August-14:August
NIEHL-II Amprion Konventionell positive 296 3,847 22:August-11:August
GUD_HERNE_6 Amprion Konventionell positive 411 3,696 13:August-22:August
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 294 3,524 05:August-22:August
GUD_HERNE_6 Amprion Konventionell positive 340 3,400 22:August-08:August
KMW_KW3 Amprion Konventionell positive 337 3,370 12:August-22:August
KNAPSACK_20 Amprion Konventionell positive 189 3,306 00:August-22:August
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 311 3,032 06:August-22:August
KNAPSACK_20 Amprion Konventionell positive 236 3,003 22:August-10:August
LAUSWARD_GUDF Amprion Konventionell positive 299 2,991 06:August-17:August
BAG NWAK-Cluster 01 Mechlenreuth TenneT DE Erneuerbar negative 450 2,925 07:August-14:August
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 450 2,925 07:August-14:August
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 243 2,850 08:August-20:August
Rostock Kohlekraftwerk 50Hertz Konventionell negative 158 2,847 22:August-16:August
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell negative 163 2,764 22:August-15:August
Knapsack 1 Amprion Konventionell positive 208 2,706 02:August-21:August
SHN Cluster Süderdonn T411 TenneT DE Erneuerbar negative 221 2,596 08:August-20:August
Rostock Kohlekraftwerk 50Hertz Konventionell negative 189 2,463 01:August-22:August
Lippendorf 50Hertz Konventionell negative 243 2,428 05:August-22:August
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 286 2,290 22:August-06:August
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 202 2,220 22:August-09:August
ReserveKW Staudinger 4 TenneT DE Konventionell positive 304 2,208 22:August-07:August
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 424 2,121 22:August-09:August
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 256 2,047 14:August-22:August
Emsland Block B Amprion Konventionell positive 180 1,984 03:August-22:August
50H PV Witznitz 50Hertz Erneuerbar negative 265 1,924 07:August-14:August
Jänschwalde (Standort) 50Hertz Konventionell negative 205 1,844 22:August-07:August
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 261 1,825 08:August-15:August
BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim TenneT DE Erneuerbar negative 270 1,755 07:August-14:August
KNAPSACK_20 Amprion Konventionell positive 249 1,745 15:August-22:August
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 198 1,734 07:August-16:August
Grosskraftwerk Mannheim Block 6 TransnetBW Konventionell positive 101 1,715 22:August-15:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.37M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-27?

On 2026-08-27, estimated redispatch costs were approximately €1.22 million. This includes €0.31M for renewable curtailment compensation and €0.61M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-27?

The most affected plant was UW Büttel (TenneT DE) with 17,324 MWh of negative redispatch.

What was the electricity spot price on 2026-08-27?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 212 €/MWh with an average of 125 €/MWh.