← 2026-08-27

Friday, August 28, 2026

2026-08-29 →
3,158MWh Curtailed
3,442MWh Ramped Up
€1.17MEst. Cost
195 MWPeak Positive

Day-Ahead Spot: 92-194 €/MWh (avg 142)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 27 19,622
Amprion positive 11 14,104
TenneT DE negative 11 9,458
TransnetBW positive 9 7,115
TransnetBW negative 4 2,052
TenneT DE positive 8 1,877
Amprion negative 5 718

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
WEISWEILER_H Amprion Konventionell positive 255 4,533 04:August-22:August
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 270 3,512 09:August-22:August
LAUSWARD_GUDF Amprion Konventionell positive 383 3,065 07:August-15:August
50H OWP Wikinger 50Hertz Erneuerbar negative 303 3,025 06:August-16:August
UW Büttel TenneT DE Erneuerbar negative 718 2,872 04:August-08:August
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 229 2,290 05:August-15:August
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 355 2,132 22:August-04:August
50H OWP Arkona 50Hertz Erneuerbar negative 246 2,091 05:August-15:August
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 285 1,992 05:August-15:August
WEISWEILER_G Amprion Konventionell positive 248 1,986 23:August-07:August
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 502 1,881 22:August-01:August
KMW_KW3 Amprion Konventionell positive 223 1,840 00:August-08:August
UW Dörpen-West TenneT DE Erneuerbar negative 304 1,824 22:August-04:August
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell negative 260 1,820 15:August-22:August
Lippendorf 50Hertz Konventionell negative 209 1,673 01:August-10:August
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 185 1,388 07:August-15:August
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 229 1,375 08:August-14:August
KNAPSACK_20 Amprion Konventionell positive 150 1,200 01:August-09:August
UW Diele TenneT DE Erneuerbar negative 197 1,180 22:August-04:August
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 210 1,049 17:August-22:August
50H Berlin Lichterfelde 50Hertz Konventionell negative 122 975 03:August-18:August
50H_AVA_CR_STW 50Hertz Erneuerbar negative 174 912 08:August-13:August
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 274 822 22:August-01:August
50H PV Witznitz 50Hertz Erneuerbar negative 95 784 05:August-13:August
Lippendorf 50Hertz Konventionell negative 110 633 07:August-18:August
STUMMHAFEN_10 Amprion Konventionell positive 273 614 23:August-01:August
50H UW Bertikow 50Hertz Erneuerbar negative 127 570 06:August-10:August
Boxberg (Standort) 50Hertz Konventionell negative 93 463 23:August-04:August
Braunschweig HKWM GT31 TenneT DE Konventionell positive 54 406 05:August-13:August
BIBLIS_GT (bnBm) Amprion Konventionell positive 189 378 11:August-14:August
NIEDERAUSSEM_G Amprion Konventionell negative 123 369 23:August-02:August
Hannover-Linden GuD TenneT DE Konventionell positive 91 340 11:August-14:August
Rostock Kohlekraftwerk 50Hertz Konventionell negative 81 324 13:August-17:August
WEISWEILER_H Amprion Konventionell positive 240 300 22:August-23:August
Hannover-Linden GuD TenneT DE Konventionell positive 64 255 22:August-02:August
Itzehoe TenneT DE Konventionell positive 50 252 06:August-11:August
50H UW Putlitz 50Hertz Erneuerbar negative 34 232 07:August-14:August
Datteln_4 Amprion Konventionell negative 102 205 11:August-14:August
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 100 200 09:August-11:August
illwerke vkw AG TransnetBW Sonstiges positive 108 189 23:August-01:August
Audorf TenneT DE Konventionell positive 42 189 06:August-11:August
Emden 4 GT (KapRes) TenneT DE Konventionell positive 50 188 06:August-10:August
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 142 142 21:August-22:August
UW Emden-Ost TenneT DE Erneuerbar negative 140 140 05:August-06:August
50H_EDIS_CR_LHG 50Hertz Erneuerbar negative 92 138 13:August-15:August
Börse TransnetBW Sonstiges positive 30 133 06:August-15:August
Hannover-Linden GuD TenneT DE Konventionell positive 50 125 19:August-22:August
Braunschweig GT TenneT DE Konventionell positive 20 122 07:August-13:August
50H UW Schönewalde 50Hertz Erneuerbar negative 39 116 07:August-13:August
Börse TransnetBW Sonstiges negative 50 113 11:August-21:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.35M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-28?

On 2026-08-28, estimated redispatch costs were approximately €1.17 million. This includes €0.32M for renewable curtailment compensation and €0.59M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-28?

The most affected plant was WEISWEILER_H (Amprion) with 4,533 MWh of positive redispatch.

What was the electricity spot price on 2026-08-28?

The EPEX Day-Ahead spot price for DE_LU ranged from 92 to 194 €/MWh with an average of 142 €/MWh.