4,769MWh Curtailed
5,592MWh Ramped Up
€2.23MEst. Cost
473 MWPeak Positive

Day-Ahead Spot: 152-740 €/MWh (avg 257)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TransnetBW positive 11 11,445
TenneT DE negative 3 6,120
TransnetBW negative 2 4,938
50Hertz negative 4 2,088
Amprion positive 1 150
Amprion negative 1 92
TenneT DE positive 2 51

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 238 3,697 22:September-17:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 120 2,880 22:September-22:September
Börse TransnetBW Sonstiges negative 120 2,880 22:September-22:September
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 260 2,600 22:September-08:September
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 260 2,600 22:September-08:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 97 2,138 00:September-22:September
Börse TransnetBW Sonstiges negative 94 2,058 00:September-22:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 192 2,012 22:September-08:September
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 226 1,527 07:September-14:September
illwerke vkw AG TransnetBW Sonstiges positive 255 510 04:September-08:September
Irsching 4 TenneT DE Konventionell negative 137 411 22:September-01:September
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell negative 52 310 22:September-08:September
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 85 255 04:September-07:September
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 83 250 09:September-12:September
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 60 180 04:September-07:September
HUCKINGEN_A Amprion Konventionell positive 75 150 05:September-07:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 50 100 06:September-08:September
Börse TransnetBW Sonstiges positive 53 92 22:September-07:September
KNAPSACK_20 Amprion Konventionell negative 92 92 22:September-23:September
Heizkraftwerk Altbach/Deizisau GT E TransnetBW Konventionell positive 40 80 05:September-07:September
Gebersdorf GT TenneT DE Konventionell positive 35 35 05:September-06:September
Itzehoe TenneT DE Konventionell positive 65 16 05:September-05:September
Börse TransnetBW Sonstiges positive 10 10 06:September-07:September
Börse 50Hertz Sonstiges negative 4 1 18:September-18:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.67M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-14?

On 2026-09-14, estimated redispatch costs were approximately €2.23 million. This includes €0.48M for renewable curtailment compensation and €1.6M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-14?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 3,697 MWh of negative redispatch.

What was the electricity spot price on 2026-09-14?

The EPEX Day-Ahead spot price for DE_LU ranged from 152 to 740 €/MWh with an average of 257 €/MWh.