4,769MWh Curtailed
5,592MWh Ramped Up
€2.23MEst. Cost
473 MWPeak Positive
Day-Ahead Spot: 152-740 €/MWh (avg 257)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TransnetBW | positive | 11 | 11,445 |
| TenneT DE | negative | 3 | 6,120 |
| TransnetBW | negative | 2 | 4,938 |
| 50Hertz | negative | 4 | 2,088 |
| Amprion | positive | 1 | 150 |
| Amprion | negative | 1 | 92 |
| TenneT DE | positive | 2 | 51 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 238 | 3,697 | 22:September-17:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 120 | 2,880 | 22:September-22:September |
| Börse | TransnetBW | Sonstiges | negative | 120 | 2,880 | 22:September-22:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 260 | 2,600 | 22:September-08:September |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 260 | 2,600 | 22:September-08:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 97 | 2,138 | 00:September-22:September |
| Börse | TransnetBW | Sonstiges | negative | 94 | 2,058 | 00:September-22:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 192 | 2,012 | 22:September-08:September |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 226 | 1,527 | 07:September-14:September | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 255 | 510 | 04:September-08:September |
| Irsching 4 | TenneT DE | Konventionell | negative | 137 | 411 | 22:September-01:September |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | negative | 52 | 310 | 22:September-08:September |
| Reservekraftwerk Marbach GT 3 | TransnetBW | Konventionell | positive | 85 | 255 | 04:September-07:September |
| 50H_EDIS_CR_LV_WU | 50Hertz | negative | 83 | 250 | 09:September-12:September | |
| Heizkraftwerk Stuttgart-Münster GT 87 | TransnetBW | Konventionell | positive | 60 | 180 | 04:September-07:September |
| HUCKINGEN_A | Amprion | Konventionell | positive | 75 | 150 | 05:September-07:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 50 | 100 | 06:September-08:September |
| Börse | TransnetBW | Sonstiges | positive | 53 | 92 | 22:September-07:September |
| KNAPSACK_20 | Amprion | Konventionell | negative | 92 | 92 | 22:September-23:September |
| Heizkraftwerk Altbach/Deizisau GT E | TransnetBW | Konventionell | positive | 40 | 80 | 05:September-07:September |
| Gebersdorf GT | TenneT DE | Konventionell | positive | 35 | 35 | 05:September-06:September |
| Itzehoe | TenneT DE | Konventionell | positive | 65 | 16 | 05:September-05:September |
| Börse | TransnetBW | Sonstiges | positive | 10 | 10 | 06:September-07:September |
| Börse | 50Hertz | Sonstiges | negative | 4 | 1 | 18:September-18:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.67M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-14?
On 2026-09-14, estimated redispatch costs were approximately €2.23 million. This includes €0.48M for renewable curtailment compensation and €1.6M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-14?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 3,697 MWh of negative redispatch.
What was the electricity spot price on 2026-09-14?
The EPEX Day-Ahead spot price for DE_LU ranged from 152 to 740 €/MWh with an average of 257 €/MWh.