← 2026-07-02

Friday, July 3, 2026

2026-07-04 →
1,469MWh Curtailed
1,801MWh Ramped Up
€0.57MEst. Cost
167 MWPeak Positive

Day-Ahead Spot: -6-142 €/MWh (avg 62)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 34 66,937
Amprion positive 22 37,397
50Hertz negative 27 32,381
TenneT DE positive 2 14,773
TransnetBW positive 6 4,826
Amprion negative 8 3,254
TransnetBW negative 2 652
50Hertz positive 1 1

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Büttel TenneT DE Erneuerbar negative 1177 21,179 04:July-22:July
Börse TenneT DE Sonstiges positive 1039 14,549 22:July-22:July
UW Emden-Ost TenneT DE Erneuerbar negative 717 10,748 04:July-19:July
UW Dörpen-West TenneT DE Erneuerbar negative 696 10,445 04:July-19:July
Knapsack 1 Amprion Konventionell positive 375 7,884 01:July-22:July
GUD_HERNE_6 Amprion Konventionell positive 416 5,829 05:July-19:July
NIEHL-31-GUD Amprion Konventionell positive 290 5,224 04:July-22:July
WEISWEILER_H Amprion Konventionell positive 285 4,843 00:July-22:July
WALSUM_10 Amprion Konventionell positive 377 4,807 01:July-22:July
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 324 4,615 05:July-19:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 643 4,177 05:July-22:July
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 235 2,818 06:July-18:July
50H UW Bertikow 50Hertz Erneuerbar negative 240 2,700 06:July-17:July
50H OWP Wikinger 50Hertz Erneuerbar negative 233 2,565 06:July-18:July
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 576 2,450 04:July-08:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 146 2,262 05:July-21:July
SHN Cluster Husum Nord TenneT DE Erneuerbar negative 434 2,170 03:July-08:July
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 433 2,164 03:July-08:July
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 166 2,162 09:July-22:July
NEURATH_F Amprion Konventionell positive 188 2,022 06:July-17:July
SHN Cluster Klixbüll TenneT DE Erneuerbar negative 484 1,938 04:July-08:July
WEISWEILER_G Amprion Konventionell positive 388 1,746 17:July-22:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,700 07:July-16:July
Boxberg (Standort) 50Hertz Konventionell negative 207 1,657 04:July-22:July
SHN Cluster Handewitt T414 T415 TenneT DE Erneuerbar negative 408 1,632 04:July-08:July
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 181 1,625 09:July-18:July
UW Büttel TenneT DE Erneuerbar negative 263 1,578 22:July-04:July
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 233 1,397 09:July-19:July
illwerke vkw AG TransnetBW Sonstiges positive 199 1,395 04:July-19:July
Datteln_4 Amprion Konventionell negative 293 1,392 01:July-06:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 150 1,275 07:July-16:July
WEISWEILER_H Amprion Konventionell positive 206 1,234 22:July-04:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 138 1,175 07:July-16:July
WALSUM_10 Amprion Konventionell negative 334 1,002 19:July-22:July
SHN Cluster Süderdonn T411 TenneT DE Erneuerbar negative 218 980 06:July-18:July
WP Schafflund TenneT DE Erneuerbar negative 72 942 04:July-19:July
50H OWP Arkona 50Hertz Erneuerbar negative 284 924 06:July-18:July
Jänschwalde (Standort) 50Hertz Konventionell negative 171 855 17:July-22:July
SHN Cluster Itzehoe West TenneT DE Erneuerbar negative 225 842 03:July-07:July
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 68 752 01:July-20:July
50H Berlin Marzahn 50Hertz Konventionell negative 119 712 22:July-22:July
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 316 710 22:July-00:July
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 128 674 22:July-03:July
50H UW Schönewalde 50Hertz Erneuerbar negative 147 664 06:July-19:July
GERSTEINW_G (KapRes) Amprion Konventionell positive 115 634 15:July-20:July
50H UW Putlitz 50Hertz Erneuerbar negative 93 630 06:July-20:July
50H UW Schönewalde 50Hertz Erneuerbar negative 200 600 11:July-14:July
illwerke vkw AG TransnetBW Sonstiges positive 300 600 01:July-03:July
50H PV Witznitz 50Hertz Erneuerbar negative 200 600 11:July-14:July
UW Dörpen-West TenneT DE Erneuerbar negative 300 600 01:July-03:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-03?

On 2026-07-03, estimated redispatch costs were approximately €0.57 million. This includes €0.15M for renewable curtailment compensation and €0.17M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-03?

The most affected plant was UW Büttel (TenneT DE) with 21,179 MWh of negative redispatch.

What was the electricity spot price on 2026-07-03?

The EPEX Day-Ahead spot price for DE_LU ranged from -6 to 142 €/MWh with an average of 62 €/MWh.