← 2026-07-03

Saturday, July 4, 2026

2026-07-05 →
1,475MWh Curtailed
1,486MWh Ramped Up
€0.51MEst. Cost
157 MWPeak Positive

Day-Ahead Spot: -12-137 €/MWh (avg 63)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 15 26,613
TenneT DE positive 7 17,292
TenneT DE negative 9 9,413
50Hertz negative 15 3,678
50Hertz positive 2 2,769
TransnetBW positive 9 1,340
TransnetBW negative 2 243
Amprion negative 1 54

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 1003 14,292 22:July-22:July
Knapsack 1 Amprion Konventionell positive 483 5,802 22:July-19:July
GUD_HERNE_6 Amprion Konventionell positive 332 5,316 22:July-22:July
Knapsack 1 Amprion Konventionell positive 681 3,916 16:July-22:July
Emsland Block B Amprion Konventionell positive 210 2,993 22:July-22:July
Knapsack 1 Amprion Konventionell positive 259 2,593 23:July-19:July
NIEHL-31-GUD Amprion Konventionell positive 246 2,396 12:July-22:July
UW Büttel TenneT DE Erneuerbar negative 477 2,387 23:July-04:July
UW Dörpen-West TenneT DE Erneuerbar negative 280 1,682 22:July-04:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,600 08:July-16:July
Börse 50Hertz Sonstiges positive 424 1,589 18:July-22:July
GUD_HERNE_6 Amprion Konventionell positive 232 1,393 16:July-22:July
Emsland Block B Amprion Konventionell positive 168 1,259 14:July-22:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 1,200 08:July-16:July
Rostock Kohlekraftwerk 50Hertz Konventionell positive 337 1,180 05:July-08:July
50H Berlin Marzahn 50Hertz Konventionell negative 98 1,170 22:July-22:July
Hannover-Linden GuD TenneT DE Konventionell positive 93 1,112 22:July-20:July
Hannover-Linden GuD TenneT DE Konventionell positive 153 1,110 14:July-22:July
AVA Cluster Voslapp TenneT DE Erneuerbar negative 307 1,074 15:July-18:July
Jänschwalde (Standort) 50Hertz Konventionell negative 121 663 22:July-20:July
UW Dörpen-West TenneT DE Erneuerbar negative 113 649 12:July-22:July
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 178 578 05:July-08:July
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 80 558 22:July-05:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 400 08:July-16:July
UW Büttel TenneT DE Erneuerbar negative 145 398 04:July-21:July
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 49 342 22:July-05:July
50H OWP Wikinger 50Hertz Erneuerbar negative 165 248 06:July-08:July
Frankfurt West 4 TenneT DE Konventionell positive 60 240 23:July-03:July
Braunschweig HKWM GT31 TenneT DE Konventionell positive 45 239 16:July-22:July
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 60 210 16:July-20:July
SW München KW-Pool TenneT DE Sonstiges positive 102 204 16:July-18:July
illwerke vkw AG TransnetBW Sonstiges positive 157 196 17:July-19:July
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 60 180 17:July-20:July
Jänschwalde (Standort) 50Hertz Konventionell negative 59 176 17:July-20:July
Jänschwalde (Standort) 50Hertz Konventionell negative 94 164 20:July-22:July
illwerke vkw AG TransnetBW Sonstiges negative 288 144 16:July-17:July
KMW_KW5 Amprion Konventionell positive 18 141 22:July-18:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 25 127 17:July-22:July
Emsland Block B Amprion Konventionell positive 56 113 20:July-22:July
50H UW Bertikow 50Hertz Erneuerbar negative 106 106 07:July-08:July
Boxberg (Standort) 50Hertz Konventionell negative 58 102 04:July-05:July
Jänschwalde (Standort) 50Hertz Konventionell negative 81 101 04:July-05:July
Börse TransnetBW Sonstiges negative 28 99 14:July-22:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 131 98 05:July-06:July
Braunschweig HKWM GT31 TenneT DE Konventionell positive 32 96 22:July-01:July
illwerke vkw AG TransnetBW Sonstiges positive 47 94 22:July-00:July
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 47 94 20:July-22:July
50H Berlin Marzahn 50Hertz Konventionell negative 38 77 04:July-06:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 15 74 22:July-18:July
50H Rostock Marienehe 50Hertz Konventionell negative 23 68 00:July-21:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.15M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-04?

On 2026-07-04, estimated redispatch costs were approximately €0.51 million. This includes €0.15M for renewable curtailment compensation and €0.14M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-04?

The most affected plant was Börse (TenneT DE) with 14,292 MWh of positive redispatch.

What was the electricity spot price on 2026-07-04?

The EPEX Day-Ahead spot price for DE_LU ranged from -12 to 137 €/MWh with an average of 63 €/MWh.