← 2026-07-04

Sunday, July 5, 2026

2026-07-06 →
1,263MWh Curtailed
1,823MWh Ramped Up
€0.63MEst. Cost
199 MWPeak Positive

Day-Ahead Spot: -1-150 €/MWh (avg 64)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 25 13,349
TenneT DE positive 3 7,306
TenneT DE negative 9 6,259
TransnetBW positive 3 2,000
Amprion positive 3 1,803
Amprion negative 1 690
TransnetBW negative 1 553
50Hertz positive 1 52

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 902 6,762 22:July-22:July
UW Büttel TenneT DE Erneuerbar negative 534 3,869 04:July-18:July
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 348 3,475 07:July-17:July
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 238 2,852 06:July-18:July
Grosskraftwerk Mannheim Block 6 TransnetBW Konventionell positive 82 1,892 23:July-22:July
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 215 1,662 07:July-14:July
GERSTEINW_F (KapRes) Amprion Konventionell positive 141 1,163 11:July-19:July
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 131 1,050 07:July-15:July
Boxberg (Standort) 50Hertz Konventionell negative 255 1,020 02:July-20:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 129 938 10:July-17:July
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 134 938 10:July-18:July
NEURATH_F Amprion Konventionell negative 115 690 16:July-22:July
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 109 625 06:July-12:July
Börse TransnetBW Sonstiges negative 76 553 05:July-20:July
Hannover-Linden GuD TenneT DE Konventionell positive 98 488 17:July-22:July
Rostock Kohlekraftwerk 50Hertz Konventionell negative 121 483 18:July-22:July
NEURATH_F Amprion Konventionell positive 153 420 04:July-07:July
50H_EDIS_CR_LHG 50Hertz Erneuerbar negative 96 338 12:July-16:July
WP Schafflund TenneT DE Erneuerbar negative 42 250 05:July-17:July
SHN Cluster Süderdonn T411 TenneT DE Erneuerbar negative 151 226 15:July-17:July
Emsland Block C Amprion Konventionell positive 55 220 17:July-21:July
Boxberg (Standort) 50Hertz Konventionell negative 210 210 17:July-18:July
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 44 208 09:July-14:July
50H Dresden-Reick 50Hertz Konventionell negative 48 194 03:July-19:July
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 92 138 08:July-10:July
50H BASF Schwarzheide 50Hertz Konventionell negative 15 137 00:July-22:July
UW Büttel TenneT DE Erneuerbar negative 68 135 15:July-17:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 48 97 17:July-19:July
50H Halle-Dieselstr HKW-BlockC 50Hertz Konventionell negative 24 94 16:July-22:July
50H OWP Wikinger 50Hertz Erneuerbar negative 186 93 05:July-05:July
50H UW Wessin 50Hertz Erneuerbar negative 29 88 04:July-17:July
WP Schafflund TenneT DE Erneuerbar negative 28 85 01:July-04:July
AVA Cluster Mehringen TenneT DE Erneuerbar negative 78 78 16:July-17:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 12 72 01:July-20:July
50H Berlin Marzahn 50Hertz Konventionell negative 80 60 22:July-22:July
Robert Frank 4 GT (KapRes) TenneT DE Konventionell positive 28 56 16:July-18:July
Börse TenneT DE Sonstiges negative 212 53 19:July-19:July
Börse 50Hertz Sonstiges positive 34 52 23:July-21:July
Boxberg (Standort) 50Hertz Konventionell negative 15 45 23:July-02:July
50H Berlin Marzahn 50Hertz Konventionell negative 43 43 16:July-17:July
50H Hamburg MMB BHKW PtH 50Hertz Konventionell negative 9 36 17:July-22:July
Börse TransnetBW Sonstiges positive 72 36 17:July-20:July
50H UW Bertikow 50Hertz Erneuerbar negative 70 35 05:July-05:July
50H Rostock Marienehe 50Hertz Konventionell negative 26 26 18:July-19:July
50H OWP Arkona 50Hertz Erneuerbar negative 31 23 04:July-05:July
Boxberg (Standort) 50Hertz Konventionell negative 15 4 21:July-21:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-05?

On 2026-07-05, estimated redispatch costs were approximately €0.63 million. This includes €0.13M for renewable curtailment compensation and €0.17M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-05?

The most affected plant was Börse (TenneT DE) with 6,762 MWh of positive redispatch.

What was the electricity spot price on 2026-07-05?

The EPEX Day-Ahead spot price for DE_LU ranged from -1 to 150 €/MWh with an average of 64 €/MWh.