2,576MWh Curtailed
2,258MWh Ramped Up
€0.68MEst. Cost
175 MWPeak Positive
Day-Ahead Spot: 18-184 €/MWh (avg 110)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TransnetBW | positive | 3 | 14,660 |
| TransnetBW | negative | 1 | 10,119 |
| Amprion | positive | 5 | 3,909 |
| Amprion | negative | 8 | 3,844 |
| 50Hertz | negative | 3 | 784 |
| 50Hertz | positive | 3 | 559 |
| TenneT DE | negative | 2 | 461 |
| TenneT DE | positive | 2 | 216 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TransnetBW | Sonstiges | negative | 519 | 10,119 | 02:May-22:May |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 519 | 10,119 | 02:May-22:May |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 504 | 4,540 | 22:May-07:May |
| Börse | Amprion | Konventionell | negative | 126 | 2,178 | 04:May-22:May |
| Netzreservekraftwerk VOELKLINGEN_HKV | Amprion | Konventionell | positive | 126 | 2,178 | 04:May-22:May |
| Netzreservekraftwerk VOELKLINGEN_HKV | Amprion | Konventionell | positive | 85 | 888 | 22:May-10:May |
| Börse | Amprion | Konventionell | negative | 85 | 888 | 22:May-10:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 111 | 808 | 13:May-21:May |
| 50H_EDIS_CR_LV_WU | 50Hertz | negative | 138 | 725 | 09:May-14:May | |
| Lippendorf | 50Hertz | Konventionell | positive | 181 | 544 | 02:May-05:May |
| AVA Cluster Voslapp | TenneT DE | negative | 160 | 400 | 10:May-13:May | |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 112 | 363 | 18:May-21:May |
| WALSUM_10 | Amprion | Konventionell | negative | 93 | 325 | 14:May-17:May |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 39 | 155 | 01:May-05:May |
| UW Garrel-Ost alpha | TenneT DE | negative | 81 | 61 | 06:May-07:May | |
| Börse | TenneT DE | Sonstiges | positive | 81 | 61 | 06:May-07:May |
| 50H PV Witznitz | 50Hertz | negative | 110 | 55 | 13:May-14:May | |
| NEURATH_F | Amprion | Konventionell | negative | 63 | 48 | 14:May-15:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 100 | 25 | 22:May-22:May |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 35 | 18 | 14:May-15:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | positive | 6 | 13 | 02:May-05:May |
| LAUSWARD_GUDF | Amprion | Konventionell | negative | 50 | 12 | 22:May-22:May |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 50 | 12 | 22:May-22:May |
| KMW_KW5 | Amprion | Konventionell | positive | 10 | 10 | 04:May-05:May |
| Börse | 50Hertz | Sonstiges | negative | 7 | 4 | 13:May-14:May |
| Börse | 50Hertz | Sonstiges | positive | 4 | 2 | 03:May-04:May |
| Börse | TransnetBW | Sonstiges | positive | 3 | 1 | 04:May-05:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-20?
On 2026-05-20, estimated redispatch costs were approximately €0.68 million. This includes €0.26M for renewable curtailment compensation and €0.32M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-20?
The most affected plant was Börse (TransnetBW) with 10,119 MWh of negative redispatch.
What was the electricity spot price on 2026-05-20?
The EPEX Day-Ahead spot price for DE_LU ranged from 18 to 184 €/MWh with an average of 110 €/MWh.