2,808MWh Curtailed
2,615MWh Ramped Up
€0.77MEst. Cost
177 MWPeak Positive
Day-Ahead Spot: 69-209 €/MWh (avg 126)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| 50Hertz | negative | 21 | 12,830 |
| TenneT DE | positive | 9 | 11,041 |
| TenneT DE | negative | 7 | 10,206 |
| Amprion | positive | 10 | 7,378 |
| TransnetBW | positive | 8 | 4,406 |
| Amprion | negative | 8 | 2,191 |
| TransnetBW | negative | 1 | 179 |
| 50Hertz | positive | 1 | 50 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 324 | 6,650 | 01:May-22:May |
| Börse | TenneT DE | Sonstiges | negative | 316 | 6,477 | 01:May-22:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 409 | 5,314 | 03:May-16:May |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 323 | 2,822 | 22:May-06:May |
| Börse | TenneT DE | Sonstiges | negative | 298 | 2,536 | 22:May-06:May |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 306 | 1,528 | 08:May-13:May |
| Lippendorf | 50Hertz | Konventionell | negative | 356 | 1,513 | 03:May-08:May |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 133 | 1,331 | 05:May-16:May |
| Emsland Block C | Amprion | Konventionell | positive | 169 | 1,223 | 01:May-09:May |
| Emsland Block B | Amprion | Konventionell | positive | 169 | 1,222 | 01:May-09:May |
| 50H PV Witznitz | 50Hertz | negative | 191 | 1,052 | 06:May-13:May | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 200 | 1,002 | 07:May-14:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 209 | 992 | 14:May-20:May |
| Börse | Amprion | Konventionell | negative | 104 | 958 | 06:May-16:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 238 | 952 | 07:May-13:May |
| Netzreservekraftwerk VOELKLINGEN_HKV | Amprion | Konventionell | positive | 101 | 911 | 06:May-15:May |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 206 | 822 | 06:May-15:May |
| Knapsack 1 | Amprion | Konventionell | positive | 404 | 808 | 06:May-08:May |
| WEISWEILER_G | Amprion | Konventionell | positive | 131 | 786 | 08:May-15:May |
| WEISWEILER_H | Amprion | Konventionell | positive | 141 | 704 | 08:May-15:May |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 142 | 673 | 04:May-08:May |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 80 | 660 | 07:May-16:May |
| Frankfurt West 4 | TenneT DE | Konventionell | positive | 72 | 651 | 06:May-15:May |
| KMW_KW3 | Amprion | Konventionell | positive | 303 | 606 | 06:May-08:May |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 81 | 488 | 07:May-14:May |
| Heizkraftwerk Stuttgart-Münster GT 88 | TransnetBW | Konventionell | positive | 56 | 420 | 08:May-16:May |
| WALSUM_10 | Amprion | Konventionell | negative | 168 | 378 | 14:May-16:May |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 131 | 360 | 15:May-19:May |
| 50H_EDIS_CR_LV_WU | 50Hertz | negative | 90 | 338 | 10:May-14:May | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 120 | 301 | 10:May-13:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 100 | 275 | 11:May-14:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 275 | 11:May-14:May | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 275 | 11:May-14:May | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 129 | 257 | 13:May-15:May |
| Itzehoe | TenneT DE | Konventionell | positive | 83 | 249 | 06:May-09:May |
| WALSUM_10 | Amprion | Konventionell | negative | 137 | 240 | 12:May-14:May |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 53 | 212 | 04:May-08:May |
| Börse | TransnetBW | Sonstiges | negative | 51 | 179 | 04:May-16:May |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 59 | 178 | 07:May-10:May |
| LAUSWARD_GUDF | Amprion | Konventionell | negative | 110 | 165 | 17:May-20:May |
| 50H PV Bartow | 50Hertz | negative | 104 | 156 | 06:May-09:May | |
| Audorf | TenneT DE | Konventionell | positive | 50 | 150 | 06:May-09:May |
| 50H_AVA_CR_WOL | 50Hertz | negative | 74 | 147 | 07:May-09:May | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 69 | 138 | 08:May-13:May |
| 50H PV Bartow | 50Hertz | negative | 54 | 136 | 08:May-12:May | |
| Börse | TenneT DE | Sonstiges | negative | 110 | 110 | 02:May-03:May |
| Heizkraftwerk Altbach/Deizisau GT B | TransnetBW | Konventionell | positive | 50 | 100 | 12:May-14:May |
| KMW_KW5 | Amprion | Konventionell | positive | 78 | 78 | 12:May-13:May |
| Braunschweig GT | TenneT DE | Konventionell | positive | 21 | 70 | 06:May-09:May |
| Börse | TenneT DE | Sonstiges | positive | 236 | 59 | 06:May-06:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-19?
On 2026-05-19, estimated redispatch costs were approximately €0.77 million. This includes €0.28M for renewable curtailment compensation and €0.41M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-19?
The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 6,650 MWh of positive redispatch.
What was the electricity spot price on 2026-05-19?
The EPEX Day-Ahead spot price for DE_LU ranged from 69 to 209 €/MWh with an average of 126 €/MWh.