← 2026-05-20

Thursday, May 21, 2026

2026-05-22 →
2,639MWh Curtailed
2,585MWh Ramped Up
€0.83MEst. Cost
215 MWPeak Positive

Day-Ahead Spot: 5-229 €/MWh (avg 110)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 23 5,113
Amprion positive 10 4,619
TenneT DE negative 4 1,210
Amprion negative 8 307
TenneT DE positive 1 180
50Hertz positive 1 13
TransnetBW positive 1 0

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Boxberg (Standort) 50Hertz Konventionell negative 282 1,410 04:May-09:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 412 1,339 05:May-09:May
GUD_HERNE_6 Amprion Konventionell positive 332 995 07:May-10:May
Emsland Block B Amprion Konventionell positive 147 734 04:May-09:May
Emsland Block C Amprion Konventionell positive 147 734 04:May-09:May
LAUSWARD_GUDF Amprion Konventionell positive 265 596 06:May-08:May
BIBLIS_GT (bnBm) Amprion Konventionell positive 185 556 13:May-18:May
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 100 550 07:May-13:May
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 97 362 09:May-12:May
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 83 312 08:May-11:May
Jänschwalde (Standort) 50Hertz Konventionell negative 128 287 06:May-08:May
WALSUM_10 Amprion Konventionell positive 111 278 08:May-10:May
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 50 275 07:May-13:May
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 86 259 07:May-10:May
Jänschwalde (Standort) 50Hertz Konventionell negative 136 238 06:May-08:May
LEIPHEIM_10 (bnBm) Amprion Konventionell positive 136 238 06:May-08:May
NIEHL-31-GUD Amprion Konventionell positive 118 235 08:May-10:May
NIEHL-31-GUD Amprion Konventionell positive 191 191 07:May-08:May
50H PV Bartow 50Hertz Erneuerbar negative 94 187 08:May-10:May
Frankfurt West 4 TenneT DE Konventionell positive 60 180 07:May-10:May
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 153 153 13:May-14:May
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 75 150 08:May-10:May
50H PV Witznitz 50Hertz Erneuerbar negative 91 137 09:May-10:May
50H OWP Wikinger 50Hertz Erneuerbar negative 62 124 08:May-10:May
50H OWP Arkona 50Hertz Erneuerbar negative 56 112 08:May-10:May
50H OWP Arkona 50Hertz Erneuerbar negative 130 97 14:May-14:May
NIEHL-31-GUD Amprion Konventionell negative 78 78 16:May-18:May
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 73 73 07:May-08:May
Jänschwalde (Standort) 50Hertz Konventionell negative 70 70 07:May-08:May
Boxberg (Standort) 50Hertz Konventionell negative 69 69 07:May-08:May
WEISWEILER_G Amprion Konventionell positive 62 62 08:May-09:May
HAMMUENTROP_20 Amprion Konventionell negative 100 50 17:May-18:May
WALSUM_10 Amprion Konventionell negative 100 50 15:May-16:May
LAUSWARD_GUDF Amprion Konventionell negative 160 40 18:May-18:May
KMW_KW3 Amprion Konventionell negative 75 38 16:May-17:May
50H PV Bartow 50Hertz Erneuerbar negative 37 28 07:May-08:May
NIEDERAUSSEM_G Amprion Konventionell negative 26 26 14:May-17:May
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 22 22 07:May-08:May
50H UW Bertikow 50Hertz Erneuerbar negative 21 21 09:May-10:May
WEISWEILER_G Amprion Konventionell negative 40 20 16:May-17:May
50H Halle-Dieselstr HKW-BlockC 50Hertz Konventionell negative 16 16 07:May-08:May
Börse 50Hertz Sonstiges positive 13 13 14:May-18:May
50H Chemnitz 50Hertz Konventionell negative 12 12 07:May-08:May
50H OWP Arkona 50Hertz Erneuerbar negative 41 10 07:May-07:May
50H UW Putlitz 50Hertz Erneuerbar negative 8 8 09:May-10:May
NIEDERAUSSEM_G Amprion Konventionell negative 20 5 16:May-16:May
50H BASF Schwarzheide 50Hertz Konventionell negative 2 2 07:May-08:May
Börse TransnetBW Sonstiges positive 1 0 09:May-10:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.25M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-21?

On 2026-05-21, estimated redispatch costs were approximately €0.83 million. This includes €0.26M for renewable curtailment compensation and €0.36M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-21?

The most affected plant was Boxberg (Standort) (50Hertz) with 1,410 MWh of negative redispatch.

What was the electricity spot price on 2026-05-21?

The EPEX Day-Ahead spot price for DE_LU ranged from 5 to 229 €/MWh with an average of 110 €/MWh.